Table/Structure Field list used by SAP ABAP Program LCXORF30 (Network: change component with reference)
SAP ABAP Program
LCXORF30 (Network: change component with reference) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
AFFH - FEFHD | Earliest scheduled finish (date) of PRT usage | |
2 | ![]() |
AFFH - FEFHZ | Earliest scheduled end (time) of PRT usage | |
3 | ![]() |
AFFH - FSFHD | Earliest scheduled start (date) for PRT usage | |
4 | ![]() |
AFFH - FSFHZ | Earliest scheduled start (time) for PRT usage | |
5 | ![]() |
AFFH - MGSOL | Total planned quantity of production resource/tool | |
6 | ![]() |
AFFH - MGSOLEH | Quantity unit of production resource/tool | |
7 | ![]() |
AFFH - SEFHD | Latest scheduled finish (date) of PRT usage | |
8 | ![]() |
AFFH - SEFHZ | Latest scheduled end (time) for PRT usage | |
9 | ![]() |
AFFH - SSFHD | Latest scheduled start (date) for PRT usage | |
10 | ![]() |
AFFH - SSFHZ | Latest scheduled start (time) for PRT usage | |
11 | ![]() |
AFFHD - FEFHD | Earliest scheduled finish (date) of PRT usage | |
12 | ![]() |
AFFHD - FEFHZ | Earliest scheduled end (time) of PRT usage | |
13 | ![]() |
AFFHD - FHWRK | Production resources/tools in plant | |
14 | ![]() |
AFFHD - FSFHD | Earliest scheduled start (date) for PRT usage | |
15 | ![]() |
AFFHD - FSFHZ | Earliest scheduled start (time) for PRT usage | |
16 | ![]() |
AFFHD - INDBT | Field defined as in SY-TABIX | |
17 | ![]() |
AFFHD - MATNR | Material Number | |
18 | ![]() |
AFFHD - MGSOL | Total planned quantity of production resource/tool | |
19 | ![]() |
AFFHD - MGSOLEH | Quantity unit of production resource/tool | |
20 | ![]() |
AFFHD - SEFHD | Latest scheduled finish (date) of PRT usage | |
21 | ![]() |
AFFHD - SEFHZ | Latest scheduled end (time) for PRT usage | |
22 | ![]() |
AFFHD - SSFHD | Latest scheduled start (date) for PRT usage | |
23 | ![]() |
AFFHD - SSFHZ | Latest scheduled start (time) for PRT usage | |
24 | ![]() |
AFFH_INC - FEFHD | Earliest scheduled finish (date) of PRT usage | |
25 | ![]() |
AFFH_INC - FEFHZ | Earliest scheduled end (time) of PRT usage | |
26 | ![]() |
AFFH_INC - FSFHD | Earliest scheduled start (date) for PRT usage | |
27 | ![]() |
AFFH_INC - FSFHZ | Earliest scheduled start (time) for PRT usage | |
28 | ![]() |
AFFH_INC - MGSOL | Total planned quantity of production resource/tool | |
29 | ![]() |
AFFH_INC - MGSOLEH | Quantity unit of production resource/tool | |
30 | ![]() |
AFFH_INC - SEFHD | Latest scheduled finish (date) of PRT usage | |
31 | ![]() |
AFFH_INC - SEFHZ | Latest scheduled end (time) for PRT usage | |
32 | ![]() |
AFFH_INC - SSFHD | Latest scheduled start (date) for PRT usage | |
33 | ![]() |
AFFH_INC - SSFHZ | Latest scheduled start (time) for PRT usage | |
34 | ![]() |
AFFL - ZAEHL | Internal counter | |
35 | ![]() |
AFFLD - ZAEHL | Internal counter | |
36 | ![]() |
AFFL_INC - ZAEHL | Internal counter | |
37 | ![]() |
AFIHW - ANLZU | Syst.Condition | |
38 | ![]() |
AFPO - PLNUM | Planned order number | |
39 | ![]() |
AFPO_INC - PLNUM | Planned order number | |
40 | ![]() |
AFVGD - ANFKOKRS | Controlling area of the requesting cost center | |
41 | ![]() |
AFVGD - APLFL | Sequence | |
42 | ![]() |
AFVGD - APLZL | General counter for order | |
43 | ![]() |
AFVGD - ARBID | Object ID of the resource | |
44 | ![]() |
AFVGD - ASKUM | Cumulative Scrap Qty of Subsequent Reporting Pts (Cur. Per.) | |
45 | ![]() |
AFVGD - ASVRG | Operation scrap | |
46 | ![]() |
AFVGD - AUFAK | Scrap factor | |
47 | ![]() |
AFVGD - AUFPL | Routing number of operations in the order | |
48 | ![]() |
AFVGD - BEARZ | Processing time | |
49 | ![]() |
AFVGD - BEDID | ID of the capacity requirements record | |
50 | ![]() |
AFVGD - BEDZL | Internal counter | |
51 | ![]() |
AFVGD - DABEA | Processing time | |
52 | ![]() |
AFVGD - DADRF | Duration of execution time (setup + processing + teardown) | |
53 | ![]() |
AFVGD - DAUNE | Normal duration/unit | |
54 | ![]() |
AFVGD - FLGAT | Sequence category | |
55 | ![]() |
AFVGD - FSAVD | Earliest scheduled start: Execution (date) | |
56 | ![]() |
AFVGD - FSAVZ | Earliest scheduled start: Execution (time) | |
57 | ![]() |
AFVGD - FSEDD | Earliest scheduled finish: Execution (date) | |
58 | ![]() |
AFVGD - FSEDZ | Earliest scheduled finish: Execution (time) | |
59 | ![]() |
AFVGD - FSEVD | Earliest finish of operation (date) | |
60 | ![]() |
AFVGD - FSEVZ | Earliest finish of operation (time) | |
61 | ![]() |
AFVGD - INDBT | Field defined as in SY-TABIX | |
62 | ![]() |
AFVGD - LMNGA | Total Yield Confirmed | |
63 | ![]() |
AFVGD - LOSME | Base Unit of Measure | |
64 | ![]() |
AFVGD - LOSVG | Operation quantity in order unit of measure | |
65 | ![]() |
AFVGD - MEINH | Unit of measure for activity | |
66 | ![]() |
AFVGD - MGVRG | Operation Quantity | |
67 | ![]() |
AFVGD - OBJNR | Object number | |
68 | ![]() |
AFVGD - PHFLG | Indicator: Phase | |
69 | ![]() |
AFVGD - PLNKN | Number of the task list node | |
70 | ![]() |
AFVGD - PRKST | Costs in the activity | |
71 | ![]() |
AFVGD - PUFFP | Free float (from forecast) | |
72 | ![]() |
AFVGD - PUFFR | Free float | |
73 | ![]() |
AFVGD - PUFGP | Total float (from forecast) | |
74 | ![]() |
AFVGD - PUFGS | Total float | |
75 | ![]() |
AFVGD - PVZKN | General counter for order | |
76 | ![]() |
AFVGD - RMNGA | Total confirmed rework quantity | |
77 | ![]() |
AFVGD - SAKTO | Cost Element | |
78 | ![]() |
AFVGD - SELKZ | Selection indicator for costing line items | |
79 | ![]() |
AFVGD - SPANZ | Actual number of splits | |
80 | ![]() |
AFVGD - SSAVD | Latest scheduled start: Execution (date) | |
81 | ![]() |
AFVGD - SSAVZ | Latest scheduled start: Execution (time) | |
82 | ![]() |
AFVGD - SSEDD | Latest scheduled finish: Execution (date) | |
83 | ![]() |
AFVGD - SSEDZ | Latest scheduled finish: Execution (time) | |
84 | ![]() |
AFVGD - SSEVD | Latest finish date of operation | |
85 | ![]() |
AFVGD - SSEVZ | Latest operation finish (time) | |
86 | ![]() |
AFVGD - STDKN | Node of operation within reference operation set | |
87 | ![]() |
AFVGD - STEUS | Control key | |
88 | ![]() |
AFVGD - UMREN | Denominator for converting rtg and op units of measure | |
89 | ![]() |
AFVGD - UMREZ | Numerator for converting task list and oper. un. of measure | |
90 | ![]() |
AFVGD - UVORN | Suboperation | |
91 | ![]() |
AFVGD - VORNR | Operation/Activity Number | |
92 | ![]() |
AFVGD - WAERS | Currency Key | |
93 | ![]() |
AFVGD - XMNGA | Total scrap quantity confirmed | |
94 | ![]() |
AFVGD - ZAEHL | Internal counter | |
95 | ![]() |
AFVGDGET - FPAVD | Earliest scheduled start date (forecast) | |
96 | ![]() |
AFVGDGET - FPAVZ | Earliest scheduled start time (forecast) | |
97 | ![]() |
AFVGDGET - FPEDD | Earliest scheduled finish date (forecast) | |
98 | ![]() |
AFVGDGET - FPEDZ | Earliest scheduled finish time (forecast) | |
99 | ![]() |
AFVGDGET - FSAVD | Earliest scheduled start: Execution (date) | |
100 | ![]() |
AFVGDGET - FSAVZ | Earliest scheduled start: Execution (time) | |
101 | ![]() |
AFVGDGET - FSEDD | Earliest scheduled finish: Execution (date) | |
102 | ![]() |
AFVGDGET - FSEDZ | Earliest scheduled finish: Execution (time) | |
103 | ![]() |
AFVGDGET - OBJNR | Object number | |
104 | ![]() |
AFVGDGET - SPAVD | Latest scheduled start date (forecast) | |
105 | ![]() |
AFVGDGET - SPAVZ | Latest scheduled start time (forecast) | |
106 | ![]() |
AFVGDGET - SPEDD | Latest scheduled finish date (forecast) | |
107 | ![]() |
AFVGDGET - SPEDZ | Latest scheduled finish time (forecast) | |
108 | ![]() |
AFVGDGET - SSAVD | Latest scheduled start: Execution (date) | |
109 | ![]() |
AFVGDGET - SSAVZ | Latest scheduled start: Execution (time) | |
110 | ![]() |
AFVGDGET - SSEDD | Latest scheduled finish: Execution (date) | |
111 | ![]() |
AFVGDGET - SSEDZ | Latest scheduled finish: Execution (time) | |
112 | ![]() |
AFVGI - ANFKOKRS | Controlling area of the requesting cost center | |
113 | ![]() |
AFVGI - APLFL | Sequence | |
114 | ![]() |
AFVGI - ARBID | Object ID of the resource | |
115 | ![]() |
AFVGI - AUFAK | Scrap factor | |
116 | ![]() |
AFVGI - BEDID | ID of the capacity requirements record | |
117 | ![]() |
AFVGI - BEDZL | Internal counter | |
118 | ![]() |
AFVGI - OBJNR | Object number | |
119 | ![]() |
AFVGI - PHFLG | Indicator: Phase | |
120 | ![]() |
AFVGI - PLNKN | Number of the task list node | |
121 | ![]() |
AFVGI - PRKST | Costs in the activity | |
122 | ![]() |
AFVGI - PVZKN | General counter for order | |
123 | ![]() |
AFVGI - SAKTO | Cost Element | |
124 | ![]() |
AFVGI - SELKZ | Selection indicator for costing line items | |
125 | ![]() |
AFVGI - SPANZ | Actual number of splits | |
126 | ![]() |
AFVGI - STDKN | Node of operation within reference operation set | |
127 | ![]() |
AFVGI - STEUS | Control key | |
128 | ![]() |
AFVGI - VORNR | Operation/Activity Number | |
129 | ![]() |
AFVGI - WAERS | Currency Key | |
130 | ![]() |
AFVGI - ZAEHL | Internal counter | |
131 | ![]() |
AFVKI - APLZL | General counter for order | |
132 | ![]() |
AFVKI - AUFPL | Routing number of operations in the order | |
133 | ![]() |
AFVVI - ASVRG | Operation scrap | |
134 | ![]() |
AFVVI - BEARZ | Processing time | |
135 | ![]() |
AFVVI - DAUNE | Normal duration/unit | |
136 | ![]() |
AFVVI - FPAVD | Earliest scheduled start date (forecast) | |
137 | ![]() |
AFVVI - FPAVZ | Earliest scheduled start time (forecast) | |
138 | ![]() |
AFVVI - FPEDD | Earliest scheduled finish date (forecast) | |
139 | ![]() |
AFVVI - FPEDZ | Earliest scheduled finish time (forecast) | |
140 | ![]() |
AFVVI - FSAVD | Earliest scheduled start: Execution (date) | |
141 | ![]() |
AFVVI - FSAVZ | Earliest scheduled start: Execution (time) | |
142 | ![]() |
AFVVI - FSEDD | Earliest scheduled finish: Execution (date) | |
143 | ![]() |
AFVVI - FSEDZ | Earliest scheduled finish: Execution (time) | |
144 | ![]() |
AFVVI - LMNGA | Total Yield Confirmed | |
145 | ![]() |
AFVVI - MEINH | Unit of measure for activity | |
146 | ![]() |
AFVVI - MGVRG | Operation Quantity | |
147 | ![]() |
AFVVI - PUFFP | Free float (from forecast) | |
148 | ![]() |
AFVVI - PUFFR | Free float | |
149 | ![]() |
AFVVI - PUFGP | Total float (from forecast) | |
150 | ![]() |
AFVVI - PUFGS | Total float | |
151 | ![]() |
AFVVI - RMNGA | Total confirmed rework quantity | |
152 | ![]() |
AFVVI - SPAVD | Latest scheduled start date (forecast) | |
153 | ![]() |
AFVVI - SPAVZ | Latest scheduled start time (forecast) | |
154 | ![]() |
AFVVI - SPEDD | Latest scheduled finish date (forecast) | |
155 | ![]() |
AFVVI - SPEDZ | Latest scheduled finish time (forecast) | |
156 | ![]() |
AFVVI - SSAVD | Latest scheduled start: Execution (date) | |
157 | ![]() |
AFVVI - SSAVZ | Latest scheduled start: Execution (time) | |
158 | ![]() |
AFVVI - SSEDD | Latest scheduled finish: Execution (date) | |
159 | ![]() |
AFVVI - SSEDZ | Latest scheduled finish: Execution (time) | |
160 | ![]() |
AFVVI - UMREN | Denominator for converting rtg and op units of measure | |
161 | ![]() |
AFVVI - UMREZ | Numerator for converting task list and oper. un. of measure | |
162 | ![]() |
AFVVI - XMNGA | Total scrap quantity confirmed | |
163 | ![]() |
BAPI7002_1 - STARTDATE | Date of availability | |
164 | ![]() |
BAPI7002_2 - PERSNO | Personnel Number | |
165 | ![]() |
CAUFVD - ANLZU | Syst.Condition | |
166 | ![]() |
CAUFVD - AUFNR | Order Number | |
167 | ![]() |
CAUFVD - AUFPL | Routing number of operations in the order | |
168 | ![]() |
CAUFVD - AUTYP | Order category | |
169 | ![]() |
CAUFVD - BEDID | ID of the capacity requirements record | |
170 | ![]() |
CAUFVD - BREAKS | Indicator: Scheduling allowing for breaks | |
171 | ![]() |
CAUFVD - CUOBJ | Configuration (internal object number) | |
172 | ![]() |
CAUFVD - DISPO | MRP controller for the order | |
173 | ![]() |
CAUFVD - EXT_AUFNR | Order Number | |
174 | ![]() |
CAUFVD - FEVOR | Production Supervisor | |
175 | ![]() |
CAUFVD - FLG_ARBEI | Indicator: Default value work is relevant | |
176 | ![]() |
CAUFVD - FLG_TRME | Indicator: Scheduling is carried out at least once | |
177 | ![]() |
CAUFVD - GETRI | Confirmed Order Finish Date | |
178 | ![]() |
CAUFVD - GLTPP | Finish date (forecast) | |
179 | ![]() |
CAUFVD - GLTPS | Scheduled forecast finish | |
180 | ![]() |
CAUFVD - GLTRP | Basic finish date | |
181 | ![]() |
CAUFVD - GLTRS | Scheduled finish | |
182 | ![]() |
CAUFVD - GLUPP | Forecast finish (time) | |
183 | ![]() |
CAUFVD - GLUPS | Scheduled forecast finish time | |
184 | ![]() |
CAUFVD - GLUZP | Basic finish (time) | |
185 | ![]() |
CAUFVD - GLUZS | Scheduled finish time | |
186 | ![]() |
CAUFVD - GMEIN | Common unit of measure for all order items | |
187 | ![]() |
CAUFVD - GSTPP | Forecast start date | |
188 | ![]() |
CAUFVD - GSTPS | Scheduled forecast start | |
189 | ![]() |
CAUFVD - GSTRP | Basic start date | |
190 | ![]() |
CAUFVD - GSTRS | Scheduled start | |
191 | ![]() |
CAUFVD - GSUPP | Forecast start (time) | |
192 | ![]() |
CAUFVD - GSUPS | Scheduled start time (Forecast) | |
193 | ![]() |
CAUFVD - GSUZP | Basic start time | |
194 | ![]() |
CAUFVD - GSUZS | Scheduled Start (Time) | |
195 | ![]() |
CAUFVD - INDBT | Field defined as in SY-TABIX | |
196 | ![]() |
CAUFVD - KBED | Ind: do not create capacity requirements | |
197 | ![]() |
CAUFVD - MATNR | Material Number for Order | |
198 | ![]() |
CAUFVD - OBJNR | Object number | |
199 | ![]() |
CAUFVD - PPSID | Object ID of PP work center | |
200 | ![]() |
CAUFVD - PRODNET | Indicator: Order is part of collective order | |
201 | ![]() |
CAUFVD - PROJN | Work Breakdown Structure Element (WBS Element) | |
202 | ![]() |
CAUFVD - TMBAS | Set of dates for network | |
203 | ![]() |
CAUFVD - TYPKZ | Type of object causing the load (order category) | |
204 | ![]() |
CAUFVD - VSNMR | Number or description of a version | |
205 | ![]() |
CAUFVD - WERKS | Plant | |
206 | ![]() |
CAUFVD - ZAEHL | Internal counter | |
207 | ![]() |
CAUFVTAB - AUFNR | Order Number | |
208 | ![]() |
CAUFVTAB - AUFPL | Routing number of operations in the order | |
209 | ![]() |
CAUFVTAB - AUTYP | Order category | |
210 | ![]() |
CAUFVTAB - BEDID | ID of the capacity requirements record | |
211 | ![]() |
CAUFVTAB - BREAKS | Indicator: Scheduling allowing for breaks | |
212 | ![]() |
CAUFVTAB - CUOBJ | Configuration (internal object number) | |
213 | ![]() |
CAUFVTAB - DISPO | MRP controller for the order | |
214 | ![]() |
CAUFVTAB - FEVOR | Production Supervisor | |
215 | ![]() |
CAUFVTAB - FLG_ARBEI | Indicator: Default value work is relevant | |
216 | ![]() |
CAUFVTAB - GETRI | Confirmed Order Finish Date | |
217 | ![]() |
CAUFVTAB - GLTPP | Finish date (forecast) | |
218 | ![]() |
CAUFVTAB - GLTPS | Scheduled forecast finish | |
219 | ![]() |
CAUFVTAB - GLTRP | Basic finish date | |
220 | ![]() |
CAUFVTAB - GLTRS | Scheduled finish | |
221 | ![]() |
CAUFVTAB - GLUPP | Forecast finish (time) | |
222 | ![]() |
CAUFVTAB - GLUPS | Scheduled forecast finish time | |
223 | ![]() |
CAUFVTAB - GLUZP | Basic finish (time) | |
224 | ![]() |
CAUFVTAB - GLUZS | Scheduled finish time | |
225 | ![]() |
CAUFVTAB - GMEIN | Common unit of measure for all order items | |
226 | ![]() |
CAUFVTAB - GSTPP | Forecast start date | |
227 | ![]() |
CAUFVTAB - GSTPS | Scheduled forecast start | |
228 | ![]() |
CAUFVTAB - GSTRP | Basic start date | |
229 | ![]() |
CAUFVTAB - GSTRS | Scheduled start | |
230 | ![]() |
CAUFVTAB - GSUPP | Forecast start (time) | |
231 | ![]() |
CAUFVTAB - GSUPS | Scheduled start time (Forecast) | |
232 | ![]() |
CAUFVTAB - GSUZP | Basic start time | |
233 | ![]() |
CAUFVTAB - GSUZS | Scheduled Start (Time) | |
234 | ![]() |
CAUFVTAB - KBED | Ind: do not create capacity requirements | |
235 | ![]() |
CAUFVTAB - OBJNR | Object number | |
236 | ![]() |
CAUFVTAB - PRODNET | Indicator: Order is part of collective order | |
237 | ![]() |
CAUFVTAB - WERKS | Plant | |
238 | ![]() |
CAUFVTAB - ZAEHL | Internal counter | |
239 | ![]() |
COCAUFVINF - FLG_TRME | Indicator: Scheduling is carried out at least once | |
240 | ![]() |
COCAUFVINF - INDBT | Field defined as in SY-TABIX | |
241 | ![]() |
COCAUFVINF - MATNR | Material Number for Order | |
242 | ![]() |
COCAUFVINF - PROJN | Work Breakdown Structure Element (WBS Element) | |
243 | ![]() |
COCAUFVINF - TMBAS | Set of dates for network | |
244 | ![]() |
COCAUFVINF - TYPKZ | Type of object causing the load (order category) | |
245 | ![]() |
COMSTINF - INDBT | Field defined as in SY-TABIX | |
246 | ![]() |
COOPRINF - ASKUM | Cumulative Scrap Qty of Subsequent Reporting Pts (Cur. Per.) | |
247 | ![]() |
COOPRINF - DABEA | Processing time | |
248 | ![]() |
COOPRINF - DADRF | Duration of execution time (setup + processing + teardown) | |
249 | ![]() |
COOPRINF - FLGAT | Sequence category | |
250 | ![]() |
COOPRINF - FSEVD | Earliest finish of operation (date) | |
251 | ![]() |
COOPRINF - FSEVZ | Earliest finish of operation (time) | |
252 | ![]() |
COOPRINF - INDBT | Field defined as in SY-TABIX | |
253 | ![]() |
COOPRINF - LOSME | Base Unit of Measure | |
254 | ![]() |
COOPRINF - LOSVG | Operation quantity in order unit of measure | |
255 | ![]() |
COOPRINF - SSEVD | Latest finish date of operation | |
256 | ![]() |
COOPRINF - SSEVZ | Latest operation finish (time) | |
257 | ![]() |
COOPRINF - UVORN | Suboperation | |
258 | ![]() |
CORESBINF - BANFNR | Purchase requisition number | |
259 | ![]() |
CORESBINF - WEMNG_CMP | Quantity of goods received | |
260 | ![]() |
COVERSINF - EXT_AUFNR | Order Number | |
261 | ![]() |
COVERSINF - VSNMR | Number or description of a version | |
262 | ![]() |
CXGPRE - AUFNR | Order Number | |
263 | ![]() |
CXGPRE - BDMNG | Requirement Quantity | |
264 | ![]() |
CXGPRE - BEDID | ID of the capacity requirements record | |
265 | ![]() |
CXGPRE - ENVRG | Finish date (earliest or latest) of operation | |
266 | ![]() |
CXGPRE - EZVRG | Earliest finish of operation | |
267 | ![]() |
CXGPRE - KOKRS | Controlling Area | |
268 | ![]() |
CXGPRE - KSTAR | Cost Element | |
269 | ![]() |
CXGPRE - MATNR | Material Number | |
270 | ![]() |
CXGPRE - MEINS | Base Unit of Measure | |
271 | ![]() |
CXGPRE - PLNUM | Planned order number | |
272 | ![]() |
CXGPRE - PRKST | Costs in the activity | |
273 | ![]() |
CXGPRE - RESTP | Resource Type | |
274 | ![]() |
CXGPRE - SAFNR | SOP order number | |
275 | ![]() |
CXGPRE - STVRG | Start date (earliest or latest) of the operation/activity | |
276 | ![]() |
CXGPRE - SZVRG | Earliest operation start date | |
277 | ![]() |
CXGPRE - TYPKZ | Type of object causing the load (order category) | |
278 | ![]() |
CXGPRE - WAERS | Currency Key | |
279 | ![]() |
CXGPRE - WERKS | Plant | |
280 | ![]() |
CXLST - MATNR | Material Number | |
281 | ![]() |
CXLST - PLNUM | Planned order number | |
282 | ![]() |
CXLST - SAFNR | SOP order number | |
283 | ![]() |
CXLST - WERKS | Plant | |
284 | ![]() |
CXZEIT - FSAV | Earliest operation start date | |
285 | ![]() |
EBAN - LFDAT | Item delivery date | |
286 | ![]() |
GPRE - KOKRS | Controlling Area | |
287 | ![]() |
GPRE - KSTAR | Cost Element | |
288 | ![]() |
GPRE - MATNR | Material Number | |
289 | ![]() |
GPRE - RESTP | Resource Type | |
290 | ![]() |
GPRE - WERKS | Plant | |
291 | ![]() |
ILOAW - PPSID | Object ID of PP work center | |
292 | ![]() |
JEST - STAT | Object status | |
293 | ![]() |
JSTAT - INACT | Indicator: Status Is Inactive | |
294 | ![]() |
JSTAT - STAT | Object status | |
295 | ![]() |
KBED - BEDZLF | BEDZL of Main Operation (for Phases and Their Main Ops) | |
296 | ![]() |
KBED - CANUMF | Counter for the main capacity requirements record | |
297 | ![]() |
KBED - PERNR | Personnel Number | |
298 | ![]() |
KBED - TYPKZ | Type of object causing the load (order category) | |
299 | ![]() |
KBEDD - CANUMF | Counter for the main capacity requirements record | |
300 | ![]() |
KBEDD - PERNR | Personnel Number | |
301 | ![]() |
KBEDI - BEDZLF | BEDZL of Main Operation (for Phases and Their Main Ops) | |
302 | ![]() |
KBEDI - CANUMF | Counter for the main capacity requirements record | |
303 | ![]() |
KBEDI - PERNR | Personnel Number | |
304 | ![]() |
KBEDI - TYPKZ | Type of object causing the load (order category) | |
305 | ![]() |
MDCAL - GKDAY | Gregorian calender day | |
306 | ![]() |
MDCPUTIME - EINZT | MRP run: Time for evaluating the operating time | |
307 | ![]() |
MDSTATS - EINZT | MRP run: Time for evaluating the operating time | |
308 | ![]() |
MLSTD - INDBT | Field defined as in SY-TABIX | |
309 | ![]() |
ORD_PRE - AUFNR | Order Number | |
310 | ![]() |
PLSC - PLSCN | Planning Scenario of Long-Term Planning | |
311 | ![]() |
PROJ - ZTEHT | Time unit in time scheduling | |
312 | ![]() |
PROJ2_INC - ZTEHT | Time unit in time scheduling | |
313 | ![]() |
PROJ_INC - ZTEHT | Time unit in time scheduling | |
314 | ![]() |
RCJ_PSCHED - FABKL | Factory calendar key | |
315 | ![]() |
RCJ_PSCHED - INDEX | Loop Index | |
316 | ![]() |
RCJ_PSCHED - OBJNR | Object number | |
317 | ![]() |
RCJ_PSCHED - PSPNR | WBS Element | |
318 | ![]() |
RCOLS - BEDZL | Internal counter | |
319 | ![]() |
RESB - BDTER | Requirements date for the component | |
320 | ![]() |
RESB - BDZTP | Time that reservation quantity required | |
321 | ![]() |
RESB - DBSKZ | Direct procurement indicator | |
322 | ![]() |
RESB - FLGEX | Indicator: External procurement | |
323 | ![]() |
RESB - KZMPF | Manual Maintenance of Requirement Date | |
324 | ![]() |
RESB - LIFZT | Delivery Time in Days | |
325 | ![]() |
RESB - MATNR | Material Number | |
326 | ![]() |
RESB - NLFZT | Lead-Time Offset | |
327 | ![]() |
RESB - SBTER | Latest requirements date | |
328 | ![]() |
RESB - SHKZG | Debit/Credit Indicator | |
329 | ![]() |
RESB - WEBAZ | Goods receipt processing time in days | |
330 | ![]() |
RESB - WERKS | Plant | |
331 | ![]() |
RESBD - BANFNR | Purchase requisition number | |
332 | ![]() |
RESBD - BDTER | Requirements date for the component | |
333 | ![]() |
RESBD - BDZTP | Time that reservation quantity required | |
334 | ![]() |
RESBD - DBSKZ | Direct procurement indicator | |
335 | ![]() |
RESBD - FLGEX | Indicator: External procurement | |
336 | ![]() |
RESBD - KZMPF | Manual Maintenance of Requirement Date | |
337 | ![]() |
RESBD - LIFZT | Delivery Time in Days | |
338 | ![]() |
RESBD - MATNR | Material Number | |
339 | ![]() |
RESBD - NLFZT | Lead-Time Offset | |
340 | ![]() |
RESBD - SBTER | Latest requirements date | |
341 | ![]() |
RESBD - SHKZG | Debit/Credit Indicator | |
342 | ![]() |
RESBD - WEBAZ | Goods receipt processing time in days | |
343 | ![]() |
RESBD - WEMNG_CMP | Quantity of goods received | |
344 | ![]() |
RESBD - WERKS | Plant | |
345 | ![]() |
SAUF - SAFNR | SOP order number | |
346 | ![]() |
SFC_ITAB - BEDZL | Internal counter | |
347 | ![]() |
SYST - DATUM | ABAP System Field: Current Date of Application Server | |
348 | ![]() |
SYST - INDEX | ABAP System Field: Loop Index | |
349 | ![]() |
SYST - MSGID | ABAP System Field: Message ID | |
350 | ![]() |
SYST - MSGNO | ABAP System Field: Message Number | |
351 | ![]() |
SYST - MSGTY | ABAP System Field: Message Type | |
352 | ![]() |
SYST - MSGV1 | ABAP System Field: Message Variable | |
353 | ![]() |
SYST - MSGV2 | ABAP System Field: Message Variable | |
354 | ![]() |
SYST - MSGV3 | ABAP System Field: Message Variable | |
355 | ![]() |
SYST - MSGV4 | ABAP System Field: Message Variable | |
356 | ![]() |
SYST - TABIX | ABAP System Field: Row Index of Internal Tables | |
357 | ![]() |
SYST - UZEIT | ABAP System Field: Current Time of Application Server | |
358 | ![]() |
T001W - FABKL | Factory calendar key | |
359 | ![]() |
T001W - WERKS | Plant | |
360 | ![]() |
T357M - KAPAO | Production Work Center Reserved by Plant Maintenance | |
361 | ![]() |
T430 - KALKZ | Cost | |
362 | ![]() |
T430 - KAPA | Indicator: Determine capacity requirements | |
363 | ![]() |
T430 - STEUS | Control key | |
364 | ![]() |
T482 - VORWT | Forward scheduling | |
365 | ![]() |
TCA11 - FLG_ALT | Indicator: headers | |
366 | ![]() |
TCA11 - FLG_FHM | Indicator: production resources/tools | |
367 | ![]() |
TCA11 - FLG_MAT | Indicator: material component | |
368 | ![]() |
TCA11 - FLG_MST | Indicator: Milestone | |
369 | ![]() |
TCA11 - FLG_OPR | Indicator: operations | |
370 | ![]() |
TCA11 - FLG_SEQ | Sequences | |
371 | ![]() |
TCA11 - FLG_SOP | Indicator: sub-operations | |
372 | ![]() |
TCX00 - AUF_SHIFT | Indicator: Shift order/network | |
373 | ![]() |
TCX00 - DADJ2 | Adjust dates in lead time scheduling | |
374 | ![]() |
TCX00 - MATFRUEH | Latest date for material staging | |
375 | ![]() |
TCX00 - TERM_KPER | Rescheduling in Workforce Planning |