Table/Structure Field list used by SAP ABAP Program LCXORF10 (Include LCUFAF53)
SAP ABAP Program
LCXORF10 (Include LCUFAF53) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AFAB - AOBAR | Type of relationship | ||
| 2 | AFAB - APLZL_NCH | Internal counter | ||
| 3 | AFAB - APLZL_VOR | Internal counter | ||
| 4 | AFAB - AUFPL_NCH | No. identifying the network to which the successor belongs | ||
| 5 | AFAB - AUFPL_VOR | No. identifying the network to which the predecessor belongs | ||
| 6 | AFABD - AOBAR | Type of relationship | ||
| 7 | AFABD - APLZL_NCH | Internal counter | ||
| 8 | AFABD - APLZL_VOR | Internal counter | ||
| 9 | AFABD - AUFPL_NCH | No. identifying the network to which the successor belongs | ||
| 10 | AFABD - AUFPL_VOR | No. identifying the network to which the predecessor belongs | ||
| 11 | AFABD - NETZPL_NCH | Network number | ||
| 12 | AFABD - NETZPL_VOR | Network number | ||
| 13 | AFABE - APLZL_VOR | Internal counter | ||
| 14 | AFABE - AUFPL_NCH | No. identifying the network to which the successor belongs | ||
| 15 | AFABE - AUFPL_VOR | No. identifying the network to which the predecessor belongs | ||
| 16 | AFABE - INDEX | Index to the AFAB document table | ||
| 17 | AFFL - AUSCHL | Alignment key for scheduling | ||
| 18 | AFFL - BEZFL | Reference sequence for a sequence | ||
| 19 | AFFL - BKNT1 | Reference node for start of a sequence | ||
| 20 | AFFL - BKNT2 | Finish reference node of a sequence | ||
| 21 | AFFL - FLGAT | Sequence category | ||
| 22 | AFFL - LOSBS | To lot size | ||
| 23 | AFFL - LOSVN | From lot size | ||
| 24 | AFFL - PLNFL | Sequence | ||
| 25 | AFFLD - AUSCHL | Alignment key for scheduling | ||
| 26 | AFFLD - BEZFL | Reference sequence for a sequence | ||
| 27 | AFFLD - BKNT1 | Reference node for start of a sequence | ||
| 28 | AFFLD - BKNT2 | Finish reference node of a sequence | ||
| 29 | AFFLD - FLGAT | Sequence category | ||
| 30 | AFFLD - LOSBS | To lot size | ||
| 31 | AFFLD - LOSVN | From lot size | ||
| 32 | AFFLD - PLNFL | Sequence | ||
| 33 | AFFLD - VORNR2 | Number of the return operation | ||
| 34 | AFFL_INC - AUSCHL | Alignment key for scheduling | ||
| 35 | AFFL_INC - BEZFL | Reference sequence for a sequence | ||
| 36 | AFFL_INC - BKNT1 | Reference node for start of a sequence | ||
| 37 | AFFL_INC - BKNT2 | Finish reference node of a sequence | ||
| 38 | AFFL_INC - FLGAT | Sequence category | ||
| 39 | AFFL_INC - LOSBS | To lot size | ||
| 40 | AFFL_INC - LOSVN | From lot size | ||
| 41 | AFFL_INC - PLNFL | Sequence | ||
| 42 | AFKO - AUFNR | Order Number | ||
| 43 | AFKO - AUFPL | Routing number of operations in the order | ||
| 44 | AFKO_INC - AUFPL | Routing number of operations in the order | ||
| 45 | AFPO - PLNUM | Planned order number | ||
| 46 | AFPO_INC - PLNUM | Planned order number | ||
| 47 | AFVC - APLZL | General counter for order | ||
| 48 | AFVC - PLNKN | Number of the task list node | ||
| 49 | AFVCP - AUFPL | Routing number of operations in the order | ||
| 50 | AFVGD - APLFL | Sequence | ||
| 51 | AFVGD - APLZL | General counter for order | ||
| 52 | AFVGD - ARBID | Object ID of the resource | ||
| 53 | AFVGD - AUFPL | Routing number of operations in the order | ||
| 54 | AFVGD - DDEHN | Indicator: flexible duration | ||
| 55 | AFVGD - FLG_VAB | Indicator: Sub-network exists | ||
| 56 | AFVGD - FLIES | Indicator: continuous flow production | ||
| 57 | AFVGD - PLNFL | Sequence | ||
| 58 | AFVGD - PLNKN | Number of the task list node | ||
| 59 | AFVGD - PROJN | Work breakdown structure element (WBS element) | ||
| 60 | AFVGD - UEKAN | Optional overlapping | ||
| 61 | AFVGD - UEMUS | Required overlapping | ||
| 62 | AFVGD - VORNR | Operation/Activity Number | ||
| 63 | AFVGI - APLFL | Sequence | ||
| 64 | AFVGI - ARBID | Object ID of the resource | ||
| 65 | AFVGI - DDEHN | Indicator: flexible duration | ||
| 66 | AFVGI - FLIES | Indicator: continuous flow production | ||
| 67 | AFVGI - PLNFL | Sequence | ||
| 68 | AFVGI - PLNKN | Number of the task list node | ||
| 69 | AFVGI - PROJN | Work breakdown structure element (WBS element) | ||
| 70 | AFVGI - UEKAN | Optional overlapping | ||
| 71 | AFVGI - UEMUS | Required overlapping | ||
| 72 | AFVGI - VORNR | Operation/Activity Number | ||
| 73 | AFVKI - APLZL | General counter for order | ||
| 74 | AFVKI - AUFPL | Routing number of operations in the order | ||
| 75 | CAUFVD - AUFNR | Order Number | ||
| 76 | CAUFVD - AUFPL | Routing number of operations in the order | ||
| 77 | CAUFVD - AUTYP | Order category | ||
| 78 | CAUFVD - BMEINS | Base Unit of Measure | ||
| 79 | CAUFVD - GAMNG | Total order quantity | ||
| 80 | CAUFVD - GLTPP | Finish date (forecast) | ||
| 81 | CAUFVD - GLTRP | Basic finish date | ||
| 82 | CAUFVD - GMEIN | Common unit of measure for all order items | ||
| 83 | CAUFVD - GSTPP | Forecast start date | ||
| 84 | CAUFVD - GSTRP | Basic start date | ||
| 85 | CAUFVD - MATNR | Material Number for Order | ||
| 86 | CAUFVD - PLNME | Task list unit of measure | ||
| 87 | CAUFVD - PLSVB | To lot size | ||
| 88 | CAUFVD - PLSVN | From Lot Size | ||
| 89 | CAUFVD - TMBAS | Set of dates for network | ||
| 90 | CAUFVTAB - AUFNR | Order Number | ||
| 91 | CAUFVTAB - AUFPL | Routing number of operations in the order | ||
| 92 | CAUFVTAB - AUTYP | Order category | ||
| 93 | CAUFVTAB - GAMNG | Total order quantity | ||
| 94 | CAUFVTAB - GLTPP | Finish date (forecast) | ||
| 95 | CAUFVTAB - GLTRP | Basic finish date | ||
| 96 | CAUFVTAB - GMEIN | Common unit of measure for all order items | ||
| 97 | CAUFVTAB - GSTPP | Forecast start date | ||
| 98 | CAUFVTAB - GSTRP | Basic start date | ||
| 99 | CAUFVTAB - PLNME | Task list unit of measure | ||
| 100 | CAUFVTAB - PLSVB | To lot size | ||
| 101 | CAUFVTAB - PLSVN | From Lot Size | ||
| 102 | COAOBINF - NETZPL_NCH | Network number | ||
| 103 | COAOBINF - NETZPL_VOR | Network number | ||
| 104 | COCAUFVINF - BMEINS | Base Unit of Measure | ||
| 105 | COCAUFVINF - MATNR | Material Number for Order | ||
| 106 | COCAUFVINF - TMBAS | Set of dates for network | ||
| 107 | COOPRINF - FLG_VAB | Indicator: Sub-network exists | ||
| 108 | COSEQINF - VORNR2 | Number of the return operation | ||
| 109 | CRID - OBJID | Object ID of the resource | ||
| 110 | PLAS - PLNFL | Sequence | ||
| 111 | PRTE - EENDE | Forecasted finish date of the WBS element | ||
| 112 | PRTE - ESTRT | Forecasted start date of the WBS element | ||
| 113 | PRTE - PENDE | WBS element: Basic finish date | ||
| 114 | PRTE - PSTRT | WBS element: Basic start date | ||
| 115 | PRTEINC - EENDE | Forecasted finish date of the WBS element | ||
| 116 | PRTEINC - ESTRT | Forecasted start date of the WBS element | ||
| 117 | PRTEINC - PENDE | WBS element: Basic finish date | ||
| 118 | PRTEINC - PSTRT | WBS element: Basic start date | ||
| 119 | RCJ_PSCHED - ENDE | Finish date for an object (WBS element, activity ...) | ||
| 120 | RCJ_PSCHED - FLGWBS | Indicator: Network scheduling | ||
| 121 | RCJ_PSCHED - OBJNR | Object number | ||
| 122 | RCJ_PSCHED - PSPNR | WBS Element | ||
| 123 | RCJ_PSCHED - START | Start date for an object (WBS element, operation) | ||
| 124 | SAUF - SAFNR | SOP order number | ||
| 125 | SYST - INDEX | ABAP System Field: Loop Index | ||
| 126 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 127 | T430 - TERM | Indicator: Scheduling | ||
| 128 | TCA11 - FLG_ALT | Indicator: headers | ||
| 129 | TCA11 - FLG_AOB | Key: View of relationships | ||
| 130 | TCA11 - FLG_OPR | Indicator: operations | ||
| 131 | TCA11 - FLG_SEQ | Sequences | ||
| 132 | TCA11 - FLG_SOP | Indicator: sub-operations |