Table/Structure Field list used by SAP ABAP Program LCNEV_01_MASTER_DATATOP (IncludeLCNEV_01_MASTER_DATATOP)
SAP ABAP Program
LCNEV_01_MASTER_DATATOP (IncludeLCNEV_01_MASTER_DATATOP) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AFVC - SUMNR | Node number of the superior operation | ||
| 2 | AFVC - STEUS | Control key | ||
| 3 | AFVGI - SUMNR | Node number of the superior operation | ||
| 4 | AFVGI - STEUS | Control key | ||
| 5 | AUFK - KTEXT | Description | ||
| 6 | BOOLE - BOOLE | Data element for domain BOOLE: TRUE (='X') and FALSE (=' ') | ||
| 7 | COBK - BELNR | Document Number | ||
| 8 | DCOBJBEZ - NAME | Name of ABAP Dictionary Object | ||
| 9 | DCOBJDEF - NAME | Name of ABAP Dictionary Object | ||
| 10 | DD07V - DDTEXT | Short Text for Fixed Values | ||
| 11 | EVCE - KSTAR | Cost Element | ||
| 12 | EVMT - EVTEC | Measurement technique in progress analysis (PS) | ||
| 13 | INBALB2 - BALOBJ | Object number | ||
| 14 | JSTO - OBJNR | Object number | ||
| 15 | MESG - MSGTY | Message type (E, I, W, ...) | ||
| 16 | MESG - TEXT | Message Text | ||
| 17 | MESG - ZEILE | Line number | ||
| 18 | PROJ - POST1 | PS: Short description (first text line) | ||
| 19 | PROJ2_INC - POST1 | PS: Short description (first text line) | ||
| 20 | PROJ_INC - POST1 | PS: Short description (first text line) | ||
| 21 | PRPS - POST1 | PS: Short description (first text line) | ||
| 22 | PRPS_INC - POST1 | PS: Short description (first text line) | ||
| 23 | RSVAR - REPORT | Report Name | ||
| 24 | SMESG - TXTNR | Message number | ||
| 25 | SYST - MANDT | ABAP System Field: Client ID of Current User | ||
| 26 | SYST - MSGLI | ABAP System Field: Obsolete | ||
| 27 | SYST - UCOMM | ABAP System Field: PAI-Triggering Function Code | ||
| 28 | TCURC - ISOCD | ISO currency code | ||
| 29 | TCURT - LTEXT | Long Text | ||
| 30 | TKA01 - KOKRS | Controlling Area | ||
| 31 | VARIT - VTEXT | Program variant short text | ||
| 32 | V_EVMT - BEZ10 | Text (10 Characters) | ||
| 33 | V_EVMT - BEZ40 | Description | ||
| 34 | V_EVMT - EVMET | Measurement method in PS progress analysis | ||
| 35 | V_EVMT - EVTEC | Measurement technique in progress analysis (PS) | ||
| 36 | V_EVMT - FGMNF | Maximum POC without actual finish | ||
| 37 | V_EVMT - FGSTR | Start percentage for start-finish technique | ||
| 38 | V_EVMT - MGFIS | Quantity field for actuals in quantity proportionality | ||
| 39 | V_EVMT - MGFPL | Quantity field for plan in quantity proportionality |