| 1 | PROJ - PLSEZ | Project planned finish date | ||
| 2 | PROJ - SCHTYP | PROJ-SCHTYP | ||
| 3 | PROJ - PLFAZ | Project planned start date | ||
| 4 | PROJ2_INC - PLFAZ | Project planned start date | ||
| 5 | PROJ2_INC - PLSEZ | Project planned finish date | ||
| 6 | PROJ2_INC - SCHTYP | PROJ2_INC-SCHTYP | ||
| 7 | PROJ_INC - PLFAZ | Project planned start date | ||
| 8 | PROJ_INC - PLSEZ | Project planned finish date | ||
| 9 | PROJ_INC - SCHTYP | PROJ_INC-SCHTYP | ||
| 10 | PRPS - FABKL | Factory calendar key | ||
| 11 | PRPS - OBJNR | Object number | ||
| 12 | PRPS - POSID | Work Breakdown Structure Element (WBS Element) | ||
| 13 | PRPS2_INC - FABKL | Factory calendar key | ||
| 14 | PRPS_INC - POSID | Work Breakdown Structure Element (WBS Element) | ||
| 15 | PRPS_INC - OBJNR | Object number | ||
| 16 | PRPS_INC - FABKL | Factory calendar key | ||
| 17 | PRTE - PDAUR | Length (duration) of the basic dates in the WBS element | ||
| 18 | PRTE - PEINH | Unit for duration of basic WBS element dates | ||
| 19 | PRTE - PENDE | WBS element: Basic finish date | ||
| 20 | PRTE - POSNR | WBS Element | ||
| 21 | PRTE - PSTRT | WBS element: Basic start date | ||
| 22 | PRTEINC - PDAUR | Length (duration) of the basic dates in the WBS element | ||
| 23 | PRTEINC - PEINH | Unit for the length (duration) of the WBS element | ||
| 24 | PRTEINC - PENDE | WBS element: Basic finish date | ||
| 25 | PRTEINC - PSTRT | WBS element: Basic start date | ||
| 26 | SYST - DATLO | ABAP System Field: Local Date of Current User | ||
| 27 | SYST - MSGTY | ABAP System Field: Message Type | ||
| 28 | T006D - DIMID | Dimension key | ||
| 29 | TCXPS - TERMKZ | Scheduling type | ||
| 30 | TJ01 - VRGNG | Business Transaction |