Table list used by SAP ABAP Program LCCCNTOP (LCCCNTOP)
SAP ABAP Program LCCCNTOP (LCCCNTOP) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Table | AEDT | Engineering Change Management: Alternative Dates | |
2 | Table | AEHI | Change hierarchy | |
3 | Table | AENR | Change Master | |
4 | Table | AENV | ECH: Object Types for Change Master | |
5 | Table | AEOI | ECH: Object Management Records for Change Master | |
6 | Table | AEOIB | Object Indexes for Change Master - Document Table | |
7 | Table | AEOIT | Log of Change Objects | |
8 | Table | AEPF | ECM: effectivity | |
9 | Table | CCCN_XFACE | Interface Structure for Function Group CCCN | |
10 | Table | CCDECO | Decouple Fields in Development Class CC | |
11 | Table | CCDOK | Engineering Change Mgmt: Document Identification Structure | |
12 | Table | CCIN | Engineering Change Management - Data Interface | |
13 | Table | CCPLN | EC Management: Task List Links | |
14 | Table | CCPVS_KEYS | Engineering Change Management: ID structure for PVS | |
15 | Table | CCSTD | Engin. Change Mgmt : Identification Structure BOM via Doc. | |
16 | Table | CCSTE | EC Management : BOM to Equipment Link | |
17 | Table | CCSTK | Engineering Change Mgmt: BOM ID Structure via Sales Order | |
18 | Table | CCSTL | EC Management : BOM Links | |
19 | Table | CCSTM | EC Management : BOM to Material Link | |
20 | Table | CCSTP | ECM: identification structure for BOM via WBS element | |
21 | Table | CCSTS | Engineering Change Mgmt: Standard BOM ID Structure | |
22 | Table | CCSTT | Engineering Change Mgmt: BOM ID Structure via Func. Location | |
23 | Table | CDHDR | Change document header | |
24 | Table | CSDATA | BOM Help Fields | |
25 | Table | DDSHFPROP | Characteristics of search help parameters | |
26 | Table | DDSHIFACE | Interface description of a F4 help method | |
27 | Table | DYNPREAD | Fields of the current screen (with values) | |
28 | Table | JSTAT | Status | |
29 | Table | RC29A | ECM: EATAB Engineering Change Management | |
30 | Table | T002 | Language Keys (Component BC-I18) | |
31 | Table | T185F | Screen Control: Function Codes | |
32 | Table | T419S | Change Master Status | |
33 | Table | TCC01 | ECH: Object types | |
34 | Table | TCC02 | ECH: Object Type Texts | |
35 | Table | TCC03 | Engineering Change Management: Objects | |
36 | Table | TCC08 | Engineering Change Management: Control Data | |
37 | Table | TCC10 | Engineering change management: release key | |
38 | Table | TCC13 | ECM: change types (object management record) | |
39 | Table | TCC21 | ECM: digital signature network - object management record | |
40 | Table | TCCS01 | ECH (System): Deactivate Basic Functions | |
41 | Table | THEAD | SAPscript: Text Header | |
42 | Table | TLINE | SAPscript: Text Lines | |
43 | Table | TTXCT | Text editor profile structure | |
44 | Table | TTXID | Valid text IDs |