Message Number list used by SAP ABAP Program L081AI0V (L081AI0V)
SAP ABAP Program L081AI0V (L081AI0V) is using
# Object Type Object Name Object Description Note
     
1 Message Number  V5 - 060 The item is already finished
2 Message Number  V5 - 061 Error when copying the contract data in batch input
3 Message Number  VC - 235 A unit must be assigned to the time period entered
4 Message Number  VC - 236 Please maintain the unit only in the existing time period
5 Message Number  VC - 238 Calendar ID and time period cannot be maintained at the same time
6 Message Number  VC - 239 The cancellation period can only be assigned a positive value
7 Message Number  VC - 244 The rule for the contract start date refers to the contract start date
8 Message Number  VC - 245 The rule for the contract end date refers to the contract end date
9 Message Number  VC - 246 The cancellation base date cannot result from the contract end date