Table list used by SAP ABAP Program DBCCLDB_AENRF005 (Include DBCCLDB_AENRF005)
SAP ABAP Program
DBCCLDB_AENRF005 (Include DBCCLDB_AENRF005) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
AEDT | Engineering Change Management: Alternative Dates | |
2 | ![]() |
AEOI | ECH: Object Management Records for Change Master | |
3 | ![]() |
CCDOK | Engineering Change Mgmt: Document Identification Structure | |
4 | ![]() |
CCPLN | EC Management: Task List Links | |
5 | ![]() |
CCPVS_KEYS | Engineering Change Management: ID structure for PVS | |
6 | ![]() |
CCSTD | Engin. Change Mgmt : Identification Structure BOM via Doc. | |
7 | ![]() |
CCSTE | EC Management : BOM to Equipment Link | |
8 | ![]() |
CCSTK | Engineering Change Mgmt: BOM ID Structure via Sales Order | |
9 | ![]() |
CCSTM | EC Management : BOM to Material Link | |
10 | ![]() |
CCSTP | ECM: identification structure for BOM via WBS element | |
11 | ![]() |
CCSTS | Engineering Change Mgmt: Standard BOM ID Structure | |
12 | ![]() |
CCSTT | Engineering Change Mgmt: BOM ID Structure via Func. Location | |
13 | ![]() |
ISOFIELDS | Structure with parameters for ISO <-> SAP code conversion | |
14 | ![]() |
JCDS | Change Documents for System/User Statuses (Table JEST) | |
15 | ![]() |
JEST | Individual Object Status | |
16 | ![]() |
JSTAT | Status | |
17 | ![]() |
T006 | Units of Measurement | |
18 | ![]() |
TCC02 | ECH: Object Type Texts | |
19 | ![]() |
TJ02T | System status texts |