Table/Structure Field list used by SAP ABAP Program /SAPPCE/PPD_CHECK_F0100 (Include /SAPPCE/PNV_CHECK_F0100)
SAP ABAP Program /SAPPCE/PPD_CHECK_F0100 (Include /SAPPCE/PNV_CHECK_F0100) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Table/Structure Field | /SAPPCE/BAPI_PD_PERIOD - PERIOD_TO | To period | |
2 | Table/Structure Field | /SAPPCE/BAPI_PD_PERIOD - FISC_YEAR | Fiscal Year | |
3 | Table/Structure Field | /SAPPCE/SPNV_KSTAR - KSTARTYP | Grouping Characteristic for Cost Elements | |
4 | Table/Structure Field | /SAPPCE/SPNV_PROJ - PSPID | Project definition | |
5 | Table/Structure Field | /SAPPCE/SPNV_PRPS - POSID | Work Breakdown Structure Element (WBS Element) | |
6 | Table/Structure Field | /SAPPCE/SPPD_RCHECK - PSTRT | WBS element: Basic start date | |
7 | Table/Structure Field | /SAPPCE/SPPD_RCHECK - PWPOS | WBS element currency | |
8 | Table/Structure Field | /SAPPCE/SPPD_RCHECK - PSPHI | Current number of the appropriate project | |
9 | Table/Structure Field | /SAPPCE/SPPD_RCHECK - POSID | Work Breakdown Structure Element (WBS Element) | |
10 | Table/Structure Field | /SAPPCE/SPPD_RCHECK - PKOKR | Controlling area for WBS element | |
11 | Table/Structure Field | /SAPPCE/SPPD_RCHECK - PGSBR | Business area for WBS element | |
12 | Table/Structure Field | /SAPPCE/SPPD_RCHECK - PENDE | WBS element: Basic finish date | |
13 | Table/Structure Field | /SAPPCE/SPPD_RCHECK - PBUKR | Company code for WBS element | |
14 | Table/Structure Field | /SAPPCE/TPNV - GJAHR | Fiscal Year | |
15 | Table/Structure Field | /SAPPCE/TPNV - PERIO | Period | |
16 | Table/Structure Field | /SAPPCE/TPNV01 - KSTARTYP | Grouping Characteristic for Cost Elements | |
17 | Table/Structure Field | ALV_S_FCAT - FIELDNAME | ALV control: Field name of internal table field | |
18 | Table/Structure Field | ALV_S_FCAT - TECH | ALV control: Technical field | |
19 | Table/Structure Field | BAPIFLAG - BAPIFLAG | Single-Character Flag | |
20 | Table/Structure Field | BAPIRET2 - MESSAGE_V1 | Message Variable | |
21 | Table/Structure Field | BAPIRET2 - TYPE | Message type: S Success, E Error, W Warning, I Info, A Abort | |
22 | Table/Structure Field | BAPIRET2 - NUMBER | Message Number | |
23 | Table/Structure Field | BAPIRET2 - MESSAGE_V4 | Message Variable | |
24 | Table/Structure Field | BAPIRET2 - MESSAGE_V2 | Message Variable | |
25 | Table/Structure Field | BAPIRET2 - ID | Message Class | |
26 | Table/Structure Field | BAPIRET2 - MESSAGE_V3 | Message Variable | |
27 | Table/Structure Field | DISVARIANT - HANDLE | Mgt. ID for repeated calls from the same program | |
28 | Table/Structure Field | DISVARIANT - REPORT | ABAP Program Name | |
29 | Table/Structure Field | LVC_S_FCAT - FIELDNAME | ALV control: Field name of internal table field | |
30 | Table/Structure Field | LVC_S_FCAT - SCRTEXT_S | Short Field Label | |
31 | Table/Structure Field | LVC_S_FCAT - TECH | ALV control: Technical field | |
32 | Table/Structure Field | LVC_S_LAYN - ISFOLDER | Flag (X or Blank) | |
33 | Table/Structure Field | LVC_S_LAYN - N_IMAGE | Tree Control: Icon / Image | |
34 | Table/Structure Field | LVC_S_LAYN - EXP_IMAGE | Tree Control: Icon / Image | |
35 | Table/Structure Field | PRHI - POSNR | WBS Element | |
36 | Table/Structure Field | PRHI - UP | Number of the superior WBS element | |
37 | Table/Structure Field | PRHI_INC - UP | Number of the superior WBS element | |
38 | Table/Structure Field | PROJ - VKOKR | Controlling area for the project | |
39 | Table/Structure Field | PROJ - VGSBR | Business area for the project | |
40 | Table/Structure Field | PROJ - VBUKR | Company code for the project | |
41 | Table/Structure Field | PROJ - PWHIE | WBS currency (project definition) | |
42 | Table/Structure Field | PROJ - PSPID | Project definition | |
43 | Table/Structure Field | PROJ - PSPNR | Current number for project or project item | |
44 | Table/Structure Field | PROJ - PLFAZ | Project planned start date | |
45 | Table/Structure Field | PROJ - PROFL | Project profile | |
46 | Table/Structure Field | PROJ - PLSEZ | Project planned finish date | |
47 | Table/Structure Field | PROJ2_INC - PLFAZ | Project planned start date | |
48 | Table/Structure Field | PROJ2_INC - PLSEZ | Project planned finish date | |
49 | Table/Structure Field | PROJ2_INC - PROFL | Project profile | |
50 | Table/Structure Field | PROJ2_INC - PWHIE | WBS currency (project definition) | |
51 | Table/Structure Field | PROJ2_INC - VBUKR | Company code for the project | |
52 | Table/Structure Field | PROJ2_INC - VGSBR | Business area for the project | |
53 | Table/Structure Field | PROJ2_INC - VKOKR | Controlling area for the project | |
54 | Table/Structure Field | PROJ_INC - PLFAZ | Project planned start date | |
55 | Table/Structure Field | PROJ_INC - VKOKR | Controlling area for the project | |
56 | Table/Structure Field | PROJ_INC - VGSBR | Business area for the project | |
57 | Table/Structure Field | PROJ_INC - VBUKR | Company code for the project | |
58 | Table/Structure Field | PROJ_INC - PWHIE | WBS currency (project definition) | |
59 | Table/Structure Field | PROJ_INC - PSPID | Project definition | |
60 | Table/Structure Field | PROJ_INC - PROFL | Project profile | |
61 | Table/Structure Field | PROJ_INC - PLSEZ | Project planned finish date | |
62 | Table/Structure Field | PRPS - PSPNR | WBS Element | |
63 | Table/Structure Field | PRPS - PSPHI | Current number of the appropriate project | |
64 | Table/Structure Field | PRPS - POSID | Work Breakdown Structure Element (WBS Element) | |
65 | Table/Structure Field | PRPS - PKOKR | Controlling area for WBS element | |
66 | Table/Structure Field | PRPS - PRART | Project type | |
67 | Table/Structure Field | PRPS2_INC - PKOKR | Controlling area for WBS element | |
68 | Table/Structure Field | PRPS2_INC - PRART | Project type | |
69 | Table/Structure Field | PRPS_INC - PKOKR | Controlling area for WBS element | |
70 | Table/Structure Field | PRPS_INC - POSID | Work Breakdown Structure Element (WBS Element) | |
71 | Table/Structure Field | PRPS_INC - PRART | Project type | |
72 | Table/Structure Field | PRPS_INC - PSPHI | Current number of the appropriate project | |
73 | Table/Structure Field | SYST - MSGTY | ABAP System Field: Message Type | |
74 | Table/Structure Field | SYST - MSGV4 | ABAP System Field: Message Variable | |
75 | Table/Structure Field | SYST - MSGV3 | ABAP System Field: Message Variable | |
76 | Table/Structure Field | SYST - MSGV2 | ABAP System Field: Message Variable | |
77 | Table/Structure Field | SYST - MSGV1 | ABAP System Field: Message Variable | |
78 | Table/Structure Field | SYST - MSGNO | ABAP System Field: Message Number | |
79 | Table/Structure Field | SYST - MSGID | ABAP System Field: Message ID | |
80 | Table/Structure Field | SYST - LANGU | ABAP System Field: Language Key of Text Environment | |
81 | Table/Structure Field | TREEMBNODE - EXP_IMAGE | Tree Control: Icon / Image | |
82 | Table/Structure Field | TREEMBNODE - ISFOLDER | Flag (X or Blank) | |
83 | Table/Structure Field | TREEMBNODE - N_IMAGE | Tree Control: Icon / Image | |
84 | Table/Structure Field | TREEV_HHDR - HEADING | Tree Control: Text in Length 132 | |
85 | Table/Structure Field | TREEV_HHDR - TOOLTIP | Tree Control: Text in Length 132 | |
86 | Table/Structure Field | TREEV_HHDR - WIDTH | Natural number | |
87 | Table/Structure Field | TREEV_HHDR - WIDTH_PIX | Flag (X or Blank) |