Table/Structure Field list used by SAP ABAP Program /SAPPCE/PNV_CHECK_F0100 (Include /SAPPCE/PNV_CHECK_F0100)
SAP ABAP Program
/SAPPCE/PNV_CHECK_F0100 (Include /SAPPCE/PNV_CHECK_F0100) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | /SAPPCE/BAPI_CHANGE_PNV - DOC_HDR_TX | Document Header Text | ||
| 2 | /SAPPCE/BAPI_CHANGE_PNV - POSTGDATE | Posting Date | ||
| 3 | /SAPPCE/BAPI_CHANGE_PNVX - DOC_HDR_TX | Updated information in related user data field | ||
| 4 | /SAPPCE/BAPI_CHANGE_PNVX - POSTGDATE | Updated information in related user data field | ||
| 5 | /SAPPCE/BAPI_PD_PERIOD - FISC_YEAR | Fiscal Year | ||
| 6 | /SAPPCE/BAPI_PD_PERIOD - PERIOD_TO | To period | ||
| 7 | /SAPPCE/BAPI_PNV - FISC_YEAR | Fiscal Year | ||
| 8 | /SAPPCE/BAPI_PNV - PERIOD | Period | ||
| 9 | /SAPPCE/BAPI_PNV_KEY - DOCUMENTNUMBER | Construction Progress Report Document Number | ||
| 10 | /SAPPCE/SPNV_HEAD_EXT - DOCUMENTNUMBER | Construction Progress Report Document Number | ||
| 11 | /SAPPCE/SPNV_HEAD_EXT - DOC_HDR_TX | Document Header Text | ||
| 12 | /SAPPCE/SPNV_HEAD_EXT - FISC_YEAR | Fiscal Year | ||
| 13 | /SAPPCE/SPNV_HEAD_EXT - PERIOD | Period | ||
| 14 | /SAPPCE/SPNV_HEAD_EXT - POSTGDATE | Posting Date | ||
| 15 | /SAPPCE/SPNV_HEAD_EXT - WBS_ELEMENT | Work Breakdown Structure Element (WBS Element) | ||
| 16 | /SAPPCE/SPNV_HEAD_EXT - WBS_ELEMENT_UP | Work Breakdown Structure Element (WBS Element) | ||
| 17 | /SAPPCE/SPNV_ITEMS_EXT - TRANS_CURR | Transaction Currency | ||
| 18 | /SAPPCE/SPNV_ITEMS_EXT - TRANS_CURR_ISO | ISO code in transaction currency | ||
| 19 | /SAPPCE/SPNV_ITEMS_EXTX - TOTAL | Updated information in related user data field | ||
| 20 | /SAPPCE/SPNV_KSTAR - KSTARTYP | Grouping Characteristic for Cost Elements | ||
| 21 | /SAPPCE/SPNV_PROJ - PSPID | Project definition | ||
| 22 | /SAPPCE/SPNV_PRPS - POSID | Work Breakdown Structure Element (WBS Element) | ||
| 23 | /SAPPCE/SPNV_RCHECK - GJAHR | Fiscal Year | ||
| 24 | /SAPPCE/SPNV_RCHECK - PBUKR | Company code for WBS element | ||
| 25 | /SAPPCE/SPNV_RCHECK - PENDE | WBS element: Basic finish date | ||
| 26 | /SAPPCE/SPNV_RCHECK - PERIO | Period | ||
| 27 | /SAPPCE/SPNV_RCHECK - PGSBR | Business area for WBS element | ||
| 28 | /SAPPCE/SPNV_RCHECK - PKOKR | Controlling area for WBS element | ||
| 29 | /SAPPCE/SPNV_RCHECK - POSID | Work Breakdown Structure Element (WBS Element) | ||
| 30 | /SAPPCE/SPNV_RCHECK - PSPHI | Current number of the appropriate project | ||
| 31 | /SAPPCE/SPNV_RCHECK - PSTRT | WBS element: Basic start date | ||
| 32 | /SAPPCE/SPNV_RCHECK - PWPOS | WBS element currency | ||
| 33 | /SAPPCE/TPNV - GJAHR | Fiscal Year | ||
| 34 | /SAPPCE/TPNV - PERIO | Period | ||
| 35 | /SAPPCE/TPNV - PS_PSP_PNR | Work Breakdown Structure Element (WBS Element) | ||
| 36 | /SAPPCE/TPNV - PVNNO | Construction Progress Report Document Number | ||
| 37 | /SAPPCE/TPNV01 - KSTARTYP | Grouping Characteristic for Cost Elements | ||
| 38 | ALV_S_FCAT - DOMNAME | Domain name | ||
| 39 | ALV_S_FCAT - FIELDNAME | ALV control: Field name of internal table field | ||
| 40 | ALV_S_FCAT - ICON | ALV control: Output as icon | ||
| 41 | ALV_S_FCAT - INTLEN | Internal Length in Bytes | ||
| 42 | ALV_S_FCAT - JUST | ALV control: Alignment | ||
| 43 | ALV_S_FCAT - OUTPUTLEN | ALV control: Column width in characters | ||
| 44 | ALV_S_FCAT - TECH | ALV control: Technical field | ||
| 45 | BAPIFLAG - BAPIFLAG | Single-Character Flag | ||
| 46 | BAPIRET2 - ID | Message Class | ||
| 47 | BAPIRET2 - MESSAGE_V1 | Message Variable | ||
| 48 | BAPIRET2 - MESSAGE_V2 | Message Variable | ||
| 49 | BAPIRET2 - MESSAGE_V3 | Message Variable | ||
| 50 | BAPIRET2 - MESSAGE_V4 | Message Variable | ||
| 51 | BAPIRET2 - NUMBER | Message Number | ||
| 52 | BAPIRET2 - TYPE | Message type: S Success, E Error, W Warning, I Info, A Abort | ||
| 53 | DISVARIANT - HANDLE | Mgt. ID for repeated calls from the same program | ||
| 54 | DISVARIANT - REPORT | ABAP Program Name | ||
| 55 | LVC_S_EXCL - FUNC | Function code | ||
| 56 | LVC_S_FCAT - DOMNAME | Domain name | ||
| 57 | LVC_S_FCAT - FIELDNAME | ALV control: Field name of internal table field | ||
| 58 | LVC_S_FCAT - ICON | ALV control: Output as icon | ||
| 59 | LVC_S_FCAT - INTLEN | Internal Length in Bytes | ||
| 60 | LVC_S_FCAT - JUST | ALV control: Alignment | ||
| 61 | LVC_S_FCAT - OUTPUTLEN | ALV control: Column width in characters | ||
| 62 | LVC_S_FCAT - SCRTEXT_S | Short Field Label | ||
| 63 | LVC_S_FCAT - TECH | ALV control: Technical field | ||
| 64 | LVC_S_LACN - EXP_IMAGE | Tree Control: Icon / Image | ||
| 65 | LVC_S_LACN - N_IMAGE | Tree Control: Icon / Image | ||
| 66 | LVC_S_LACN - U_EXP_IMAG | Flag (X or Blank) | ||
| 67 | LVC_S_LACN - U_N_IMAGE | Flag (X or Blank) | ||
| 68 | LVC_S_LAYN - EXP_IMAGE | Tree Control: Icon / Image | ||
| 69 | LVC_S_LAYN - ISFOLDER | Flag (X or Blank) | ||
| 70 | LVC_S_LAYN - N_IMAGE | Tree Control: Icon / Image | ||
| 71 | PRHI - POSNR | WBS Element | ||
| 72 | PRHI - UP | Number of the superior WBS element | ||
| 73 | PRHI_INC - UP | Number of the superior WBS element | ||
| 74 | PROJ - PLFAZ | Project planned start date | ||
| 75 | PROJ - PLSEZ | Project planned finish date | ||
| 76 | PROJ - PROFL | Project profile | ||
| 77 | PROJ - PSPID | Project definition | ||
| 78 | PROJ - PSPNR | Current number for project or project item | ||
| 79 | PROJ - PWHIE | WBS currency (project definition) | ||
| 80 | PROJ - VBUKR | Company code for the project | ||
| 81 | PROJ - VGSBR | Business area for the project | ||
| 82 | PROJ - VKOKR | Controlling area for the project | ||
| 83 | PROJ2_INC - PLFAZ | Project planned start date | ||
| 84 | PROJ2_INC - PLSEZ | Project planned finish date | ||
| 85 | PROJ2_INC - PROFL | Project profile | ||
| 86 | PROJ2_INC - PWHIE | WBS currency (project definition) | ||
| 87 | PROJ2_INC - VBUKR | Company code for the project | ||
| 88 | PROJ2_INC - VGSBR | Business area for the project | ||
| 89 | PROJ2_INC - VKOKR | Controlling area for the project | ||
| 90 | PROJ_INC - PLFAZ | Project planned start date | ||
| 91 | PROJ_INC - PLSEZ | Project planned finish date | ||
| 92 | PROJ_INC - PROFL | Project profile | ||
| 93 | PROJ_INC - PSPID | Project definition | ||
| 94 | PROJ_INC - PWHIE | WBS currency (project definition) | ||
| 95 | PROJ_INC - VBUKR | Company code for the project | ||
| 96 | PROJ_INC - VGSBR | Business area for the project | ||
| 97 | PROJ_INC - VKOKR | Controlling area for the project | ||
| 98 | PRPS - PKOKR | Controlling area for WBS element | ||
| 99 | PRPS - POSID | Work Breakdown Structure Element (WBS Element) | ||
| 100 | PRPS - PRART | Project type | ||
| 101 | PRPS - PSPHI | Current number of the appropriate project | ||
| 102 | PRPS - PSPNR | WBS Element | ||
| 103 | PRPS2_INC - PKOKR | Controlling area for WBS element | ||
| 104 | PRPS2_INC - PRART | Project type | ||
| 105 | PRPS_INC - PKOKR | Controlling area for WBS element | ||
| 106 | PRPS_INC - POSID | Work Breakdown Structure Element (WBS Element) | ||
| 107 | PRPS_INC - PRART | Project type | ||
| 108 | PRPS_INC - PSPHI | Current number of the appropriate project | ||
| 109 | SYST - DATLO | ABAP System Field: Local Date of Current User | ||
| 110 | SYST - LANGU | ABAP System Field: Language Key of Text Environment | ||
| 111 | SYST - MSGID | ABAP System Field: Message ID | ||
| 112 | SYST - MSGNO | ABAP System Field: Message Number | ||
| 113 | SYST - MSGTY | ABAP System Field: Message Type | ||
| 114 | SYST - MSGV1 | ABAP System Field: Message Variable | ||
| 115 | SYST - MSGV2 | ABAP System Field: Message Variable | ||
| 116 | SYST - MSGV3 | ABAP System Field: Message Variable | ||
| 117 | SYST - MSGV4 | ABAP System Field: Message Variable | ||
| 118 | T009B - BDATJ | Posting Date YYYY | ||
| 119 | T009B - POPER | Posting period | ||
| 120 | TKA01 - LMONA | Fiscal Year Variant | ||
| 121 | TREEMBNODE - EXP_IMAGE | Tree Control: Icon / Image | ||
| 122 | TREEMBNODE - ISFOLDER | Flag (X or Blank) | ||
| 123 | TREEMBNODE - N_IMAGE | Tree Control: Icon / Image | ||
| 124 | TREEV_HHDR - HEADING | Tree Control: Text in Length 132 | ||
| 125 | TREEV_HHDR - TOOLTIP | Tree Control: Text in Length 132 | ||
| 126 | TREEV_HHDR - WIDTH | Natural number | ||
| 127 | TREEV_HHDR - WIDTH_PIX | Flag (X or Blank) |