Table/Structure Field list used by SAP ABAP Program /RPM/LVC_REPORTINGF02 (Include /RPM/LVC_REPORTINGF02)
SAP ABAP Program /RPM/LVC_REPORTINGF02 (Include /RPM/LVC_REPORTINGF02) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Table/Structure Field | /RPM/DECISION - ACTUAL_FINISH | Actual Finish Date | |
2 | Table/Structure Field | /RPM/DECISION - ACTUAL_START | Actual Start Date | |
3 | Table/Structure Field | /RPM/DECISION - DECISION_ID | ID | |
4 | Table/Structure Field | /RPM/DECISION - FORECAST_FINISH | Forecasted Finish Date | |
5 | Table/Structure Field | /RPM/DECISION - FORECAST_START | Forecasted Start | |
6 | Table/Structure Field | /RPM/DECISION - ITEM_GUID | Guid for application objects | |
7 | Table/Structure Field | /RPM/DECISION - PLAN_FINISH | Planned Finish Date | |
8 | Table/Structure Field | /RPM/DECISION - PLAN_START | Planned Start Date | |
9 | Table/Structure Field | /RPM/ITEM_STATUS - STATUS | Status | |
10 | Table/Structure Field | /RPM/ITEM_STATUS - STATUS_GROUP | Status Group | |
11 | Table/Structure Field | /RPM/TS_BUCKET_API - BUCKET_GUID | Guid for application objects | |
12 | Table/Structure Field | /RPM/TS_BUCKET_API - CNT_REVIEWS | Review Count for Bucket | |
13 | Table/Structure Field | /RPM/TS_BUCKET_API - CURRENCY | Currency Key | |
14 | Table/Structure Field | /RPM/TS_BUCKET_ATTR_INT - BUCKET_GUID | Guid for application objects | |
15 | Table/Structure Field | /RPM/TS_BUCKET_ATTR_INT - CURRENCY | Currency Key | |
16 | Table/Structure Field | /RPM/TS_BUCKET_DATA - CNT_REVIEWS | Review Count for Bucket | |
17 | Table/Structure Field | /RPM/TS_BUCKET_DATA_DER - CNT_REVIEWS | Review Count for Bucket | |
18 | Table/Structure Field | /RPM/TS_DECISION_ATTR_INCL - ACTUAL_FINISH | Actual Finish Date | |
19 | Table/Structure Field | /RPM/TS_DECISION_ATTR_INCL - ACTUAL_START | Actual Start Date | |
20 | Table/Structure Field | /RPM/TS_DECISION_ATTR_INCL - DECISION_ID | ID | |
21 | Table/Structure Field | /RPM/TS_DECISION_ATTR_INCL - FORECAST_FINISH | Forecasted Finish Date | |
22 | Table/Structure Field | /RPM/TS_DECISION_ATTR_INCL - FORECAST_START | Forecasted Start | |
23 | Table/Structure Field | /RPM/TS_DECISION_ATTR_INCL - ITEM_GUID | Guid for application objects | |
24 | Table/Structure Field | /RPM/TS_DECISION_ATTR_INCL - PLAN_FINISH | Planned Finish Date | |
25 | Table/Structure Field | /RPM/TS_DECISION_ATTR_INCL - PLAN_START | Planned Start Date | |
26 | Table/Structure Field | /RPM/TS_ITEM_D_API - COSTD | Development Cost | |
27 | Table/Structure Field | /RPM/TS_ITEM_D_API - COSTL | Launch Cost | |
28 | Table/Structure Field | /RPM/TS_ITEM_D_API - CURRENCY | Currency key | |
29 | Table/Structure Field | /RPM/TS_ITEM_D_API - DERIVED_RISK | Derived Risk | |
30 | Table/Structure Field | /RPM/TS_ITEM_D_API - GUID | Guid for application objects | |
31 | Table/Structure Field | /RPM/TS_ITEM_D_API - NPV | Net Present Value (manual) | |
32 | Table/Structure Field | /RPM/TS_ITEM_D_API - PROBC | Probability of Commercial Success | |
33 | Table/Structure Field | /RPM/TS_ITEM_D_API - PROBT | Probability of Technical Success | |
34 | Table/Structure Field | /RPM/TS_ITEM_D_API - STATUS | Status | |
35 | Table/Structure Field | /RPM/TS_ITEM_D_ATT_SAP - COSTD | Development Cost | |
36 | Table/Structure Field | /RPM/TS_ITEM_D_ATT_SAP - COSTL | Launch Cost | |
37 | Table/Structure Field | /RPM/TS_ITEM_D_ATT_SAP - CURRENCY | Currency key | |
38 | Table/Structure Field | /RPM/TS_ITEM_D_ATT_SAP - NPV | Net Present Value (manual) | |
39 | Table/Structure Field | /RPM/TS_ITEM_D_ATT_SAP - PROBC | Probability of Commercial Success | |
40 | Table/Structure Field | /RPM/TS_ITEM_D_ATT_SAP - PROBT | Probability of Technical Success | |
41 | Table/Structure Field | /RPM/TS_ITEM_D_ATT_SAP - STATUS | Status | |
42 | Table/Structure Field | /RPM/TS_ITEM_D_DATA - COSTD | Development Cost | |
43 | Table/Structure Field | /RPM/TS_ITEM_D_DATA - COSTL | Launch Cost | |
44 | Table/Structure Field | /RPM/TS_ITEM_D_DATA - CURRENCY | Currency key | |
45 | Table/Structure Field | /RPM/TS_ITEM_D_DATA - DERIVED_RISK | Derived Risk | |
46 | Table/Structure Field | /RPM/TS_ITEM_D_DATA - NPV | Net Present Value (manual) | |
47 | Table/Structure Field | /RPM/TS_ITEM_D_DATA - PROBC | Probability of Commercial Success | |
48 | Table/Structure Field | /RPM/TS_ITEM_D_DATA - PROBT | Probability of Technical Success | |
49 | Table/Structure Field | /RPM/TS_ITEM_D_DATA - STATUS | Status | |
50 | Table/Structure Field | /RPM/TS_ITEM_D_DERIVED_ATT - DERIVED_RISK | Derived Risk | |
51 | Table/Structure Field | /RPM/TS_PERIOD - PERIOD | Field of type DATS | |
52 | Table/Structure Field | /RPM/TS_VC_BASIC_ATTRIBUTES - COSTD | Development Cost | |
53 | Table/Structure Field | /RPM/TS_VC_BASIC_ATTRIBUTES - COSTL | Launch Cost | |
54 | Table/Structure Field | /RPM/TS_VC_BASIC_ATTRIBUTES - CURRENCY | Currency Key | |
55 | Table/Structure Field | /RPM/TS_VC_BASIC_ATTRIBUTES - DERIVED_RISK | Project Derived Risk | |
56 | Table/Structure Field | /RPM/TS_VC_BASIC_ATTRIBUTES - NPV | Net Present Value (manual) | |
57 | Table/Structure Field | /RPM/TS_VC_BASIC_ATTRIBUTES - PROBC | Probability of commercial Success | |
58 | Table/Structure Field | /RPM/TS_VC_BASIC_ATTRIBUTES - PROBT | Probability of technical Success | |
59 | Table/Structure Field | /RPM/TS_VC_BUCKET - BUCKET_GUID_CHAR | Guid in character type | |
60 | Table/Structure Field | /RPM/TS_VC_BUCKET - PARENT_GUID_CHAR | Guid in character type | |
61 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - ACTUAL_TD_1 | Actual Total Duration to Finish (Lauch, in Months) | |
62 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - ACTUAL_TD_2 | Actual Total Duration to Finish (Lauch, in Months) | |
63 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - ACTUAL_TD_3 | Actual Total Duration to Finish (Lauch, in Months) | |
64 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - ACTUAL_TD_4 | Actual Total Duration to Finish (Lauch, in Months) | |
65 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - ACTUAL_TD_5 | Actual Total Duration to Finish (Lauch, in Months) | |
66 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - ACTUAL_TD_6 | Actual Total Duration to Finish (Lauch, in Months) | |
67 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - ACTUAL_TD_7 | Actual Total Duration to Finish (Lauch, in Months) | |
68 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - ACTUAL_TD_8 | Actual Total Duration to Finish (Lauch, in Months) | |
69 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - BUCKET_GUID_CHAR | Guid in character type | |
70 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - CNT_ITEMS_1 | Number of Items | |
71 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - CNT_ITEMS_2 | Number of Items | |
72 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - CNT_ITEMS_3 | Number of Items | |
73 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - CNT_ITEMS_4 | Number of Items | |
74 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - CNT_ITEMS_5 | Number of Items | |
75 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - CNT_ITEMS_6 | Number of Items | |
76 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - CNT_ITEMS_7 | Number of Items | |
77 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - CNT_ITEMS_8 | Number of Items | |
78 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - FORECASTED_TD_1 | Forecasted Total Duration to Finish (Lauch, in Months) | |
79 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - FORECASTED_TD_2 | Forecasted Total Duration to Finish (Lauch, in Months) | |
80 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - FORECASTED_TD_3 | Forecasted Total Duration to Finish (Lauch, in Months) | |
81 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - FORECASTED_TD_4 | Forecasted Total Duration to Finish (Lauch, in Months) | |
82 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - FORECASTED_TD_5 | Forecasted Total Duration to Finish (Lauch, in Months) | |
83 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - FORECASTED_TD_6 | Forecasted Total Duration to Finish (Lauch, in Months) | |
84 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - FORECASTED_TD_7 | Forecasted Total Duration to Finish (Lauch, in Months) | |
85 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - FORECASTED_TD_8 | Forecasted Total Duration to Finish (Lauch, in Months) | |
86 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - PARENT_GUID_CHAR | Guid in character type | |
87 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - PLANNED_TD_1 | Planned Total Duration to Finish (Lauch, in Months) | |
88 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - PLANNED_TD_2 | Planned Total Duration to Finish (Lauch, in Months) | |
89 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - PLANNED_TD_3 | Planned Total Duration to Finish (Lauch, in Months) | |
90 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - PLANNED_TD_4 | Planned Total Duration to Finish (Lauch, in Months) | |
91 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - PLANNED_TD_5 | Planned Total Duration to Finish (Lauch, in Months) | |
92 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - PLANNED_TD_6 | Planned Total Duration to Finish (Lauch, in Months) | |
93 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - PLANNED_TD_7 | Planned Total Duration to Finish (Lauch, in Months) | |
94 | Table/Structure Field | /RPM/TS_VC_HISTORY_BUCKET - PLANNED_TD_8 | Planned Total Duration to Finish (Lauch, in Months) | |
95 | Table/Structure Field | /RPM/TS_VC_ITEM - BUCKET_GUID_CHAR | Guid in character type | |
96 | Table/Structure Field | /RPM/TS_VC_ITEM - ITEM_GUID_CHAR | Guid in character type | |
97 | Table/Structure Field | /RPM/TS_VC_ITEM_MASTER_DATA - ACTUAL_FINISH | Actual Finish Date | |
98 | Table/Structure Field | /RPM/TS_VC_ITEM_MASTER_DATA - ACTUAL_START | Actual Start Date | |
99 | Table/Structure Field | /RPM/TS_VC_ITEM_MASTER_DATA - FORECASTED_FINISH | Forecasted Finish Date | |
100 | Table/Structure Field | /RPM/TS_VC_ITEM_MASTER_DATA - FORECASTED_START | Forecasted Start | |
101 | Table/Structure Field | /RPM/TS_VC_ITEM_MASTER_DATA - ITEM_STATUS_GROUP_ID | Status | |
102 | Table/Structure Field | /RPM/TS_VC_ITEM_MASTER_DATA - PLANNED_FINISH | Planned Finish Date | |
103 | Table/Structure Field | /RPM/TS_VC_ITEM_MASTER_DATA - PLANNED_START | Planned Start Date | |
104 | Table/Structure Field | /RPM/TS_VC_PERIOD_LABLES - PERIOD_ID_1 | Period ID | |
105 | Table/Structure Field | /RPM/TS_VC_PERIOD_LABLES - PERIOD_ID_2 | Period ID | |
106 | Table/Structure Field | /RPM/TS_VC_PERIOD_LABLES - PERIOD_ID_3 | Period ID | |
107 | Table/Structure Field | /RPM/TS_VC_PERIOD_LABLES - PERIOD_ID_4 | Period ID | |
108 | Table/Structure Field | /RPM/TS_VC_PERIOD_LABLES - PERIOD_ID_5 | Period ID | |
109 | Table/Structure Field | /RPM/TS_VC_PERIOD_LABLES - PERIOD_ID_6 | Period ID | |
110 | Table/Structure Field | /RPM/TS_VC_PERIOD_LABLES - PERIOD_ID_7 | Period ID | |
111 | Table/Structure Field | /RPM/TS_VC_PERIOD_LABLES - PERIOD_ID_8 | Period ID | |
112 | Table/Structure Field | /RPM/TS_VC_PERIOD_LABLES - PERIOD_NAME_1 | Period | |
113 | Table/Structure Field | /RPM/TS_VC_PERIOD_LABLES - PERIOD_NAME_2 | Period | |
114 | Table/Structure Field | /RPM/TS_VC_PERIOD_LABLES - PERIOD_NAME_3 | Period | |
115 | Table/Structure Field | /RPM/TS_VC_PERIOD_LABLES - PERIOD_NAME_4 | Period | |
116 | Table/Structure Field | /RPM/TS_VC_PERIOD_LABLES - PERIOD_NAME_5 | Period | |
117 | Table/Structure Field | /RPM/TS_VC_PERIOD_LABLES - PERIOD_NAME_6 | Period | |
118 | Table/Structure Field | /RPM/TS_VC_PERIOD_LABLES - PERIOD_NAME_7 | Period | |
119 | Table/Structure Field | /RPM/TS_VC_PERIOD_LABLES - PERIOD_NAME_8 | Period | |
120 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ATT - ACTUAL_D2D | Actual Duration to Date (in Months) | |
121 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ATT - ACTUAL_D2F | Actual Duration to Finish (Lauch, in Months) | |
122 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ATT - ACTUAL_TD | Actual Total Duration to Finish (Lauch, in Months) | |
123 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ATT - COSTD | Development Cost | |
124 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ATT - COSTL | Launch Cost | |
125 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ATT - CURRENCY | Currency Key | |
126 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ATT - DERIVED_RISK | Project Derived Risk | |
127 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ATT - FORECASTED_D2D | Forecasted Duration to Date (in Months) | |
128 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ATT - FORECASTED_D2F | Forecasted Duration to Finish (Lauch, in Months) | |
129 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ATT - FORECASTED_TD | Forecasted Total Duration to Finish (Lauch, in Months) | |
130 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ATT - NPV | Net Present Value (manual) | |
131 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ATT - PLANNED_D2D | Planned Duration to Date (in Months) | |
132 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ATT - PLANNED_D2F | Planned Duration to Finish (Lauch, in Months) | |
133 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ATT - PLANNED_TD | Planned Total Duration to Finish (Lauch, in Months) | |
134 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ATT - PROBC | Probability of commercial Success | |
135 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ATT - PROBT | Probability of technical Success | |
136 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - ACTUAL_D2D | Actual Duration to Date (in Months) | |
137 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - ACTUAL_D2F | Actual Duration to Finish (Lauch, in Months) | |
138 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - ACTUAL_TD | Actual Total Duration to Finish (Lauch, in Months) | |
139 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - BUCKET_GUID_CHAR | Guid in character type | |
140 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - CNT_DIRECT_SUBBUCKETS | Number of Direct Subbuckets | |
141 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - CNT_ITEMS | Number of Items | |
142 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - CNT_REVIEWS | Number of Reviews in a Bucket (including Subbuckets) | |
143 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - CNT_REVIEWS_DIRECT | Number of Reviews in a Bucket | |
144 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - CNT_SUBBUCKETS | Number of Subbucket(s) | |
145 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - COSTD | Development Cost | |
146 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - COSTL | Launch Cost | |
147 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - CURRENCY | Currency Key | |
148 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - FORECASTED_D2D | Forecasted Duration to Date (in Months) | |
149 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - FORECASTED_D2F | Forecasted Duration to Finish (Lauch, in Months) | |
150 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - FORECASTED_TD | Forecasted Total Duration to Finish (Lauch, in Months) | |
151 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - NPV | Net Present Value (manual) | |
152 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - PARENT_GUID_CHAR | Guid in character type | |
153 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - PLANNED_D2D | Planned Duration to Date (in Months) | |
154 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - PLANNED_D2F | Planned Duration to Finish (Lauch, in Months) | |
155 | Table/Structure Field | /RPM/TS_VC_TIMELINE_BUCKET - PLANNED_TD | Planned Total Duration to Finish (Lauch, in Months) | |
156 | Table/Structure Field | /RPM/TS_VC_TIMELINE_HISTORY - ACTUAL_D2D | Actual Duration to Date (in Months) | |
157 | Table/Structure Field | /RPM/TS_VC_TIMELINE_HISTORY - ACTUAL_D2F | Actual Duration to Finish (Lauch, in Months) | |
158 | Table/Structure Field | /RPM/TS_VC_TIMELINE_HISTORY - ACTUAL_TD | Actual Total Duration to Finish (Lauch, in Months) | |
159 | Table/Structure Field | /RPM/TS_VC_TIMELINE_HISTORY - CNT_ITEMS | Number of Items | |
160 | Table/Structure Field | /RPM/TS_VC_TIMELINE_HISTORY - DERIVED_RISK | Project Derived Risk | |
161 | Table/Structure Field | /RPM/TS_VC_TIMELINE_HISTORY - FORECASTED_D2D | Forecasted Duration to Date (in Months) | |
162 | Table/Structure Field | /RPM/TS_VC_TIMELINE_HISTORY - FORECASTED_D2F | Forecasted Duration to Finish (Lauch, in Months) | |
163 | Table/Structure Field | /RPM/TS_VC_TIMELINE_HISTORY - FORECASTED_TD | Forecasted Total Duration to Finish (Lauch, in Months) | |
164 | Table/Structure Field | /RPM/TS_VC_TIMELINE_HISTORY - PERIOD_END | Finish Date | |
165 | Table/Structure Field | /RPM/TS_VC_TIMELINE_HISTORY - PERIOD_ID | Period ID | |
166 | Table/Structure Field | /RPM/TS_VC_TIMELINE_HISTORY - PERIOD_NAME | Period | |
167 | Table/Structure Field | /RPM/TS_VC_TIMELINE_HISTORY - PERIOD_START | Start Date | |
168 | Table/Structure Field | /RPM/TS_VC_TIMELINE_HISTORY - PLANNED_D2D | Planned Duration to Date (in Months) | |
169 | Table/Structure Field | /RPM/TS_VC_TIMELINE_HISTORY - PLANNED_D2F | Planned Duration to Finish (Lauch, in Months) | |
170 | Table/Structure Field | /RPM/TS_VC_TIMELINE_HISTORY - PLANNED_TD | Planned Total Duration to Finish (Lauch, in Months) | |
171 | Table/Structure Field | /RPM/TS_VC_TIMELINE_HISTORY - PROBC | Probability of commercial Success | |
172 | Table/Structure Field | /RPM/TS_VC_TIMELINE_HISTORY - PROBT | Probability of technical Success | |
173 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - ACTUAL_D2D | Actual Duration to Date (in Months) | |
174 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - ACTUAL_D2F | Actual Duration to Finish (Lauch, in Months) | |
175 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - ACTUAL_FINISH | Actual Finish Date | |
176 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - ACTUAL_START | Actual Start Date | |
177 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - ACTUAL_TD | Actual Total Duration to Finish (Lauch, in Months) | |
178 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - BUCKET_GUID_CHAR | Guid in character type | |
179 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - COSTD | Development Cost | |
180 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - COSTL | Launch Cost | |
181 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - CURRENCY | Currency Key | |
182 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - DERIVED_RISK | Project Derived Risk | |
183 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - FORECASTED_D2D | Forecasted Duration to Date (in Months) | |
184 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - FORECASTED_D2F | Forecasted Duration to Finish (Lauch, in Months) | |
185 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - FORECASTED_FINISH | Forecasted Finish Date | |
186 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - FORECASTED_START | Forecasted Start | |
187 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - FORECASTED_TD | Forecasted Total Duration to Finish (Lauch, in Months) | |
188 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - ITEM_STATUS_GROUP_ID | Status | |
189 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - NPV | Net Present Value (manual) | |
190 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - PLANNED_D2D | Planned Duration to Date (in Months) | |
191 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - PLANNED_D2F | Planned Duration to Finish (Lauch, in Months) | |
192 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - PLANNED_FINISH | Planned Finish Date | |
193 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - PLANNED_START | Planned Start Date | |
194 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - PLANNED_TD | Planned Total Duration to Finish (Lauch, in Months) | |
195 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - PROBC | Probability of commercial Success | |
196 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - PROBT | Probability of technical Success | |
197 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - TL_ACTUAL_FINISH | Actual Finish Date | |
198 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - TL_ACTUAL_START | Actual Start Date | |
199 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - TL_FORECASTED_FINISH | Forecasted Finish Date | |
200 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - TL_FORECASTED_START | Forecasted Start | |
201 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - TL_PLANNED_FINISH | Planned Finish Date | |
202 | Table/Structure Field | /RPM/TS_VC_TIMELINE_ITEM - TL_PLANNED_START | Planned Start Date | |
203 | Table/Structure Field | BAPI1093_0 - EXCH_RATE | Direct Quoted Exchange Rate | |
204 | Table/Structure Field | BAPI1093_3 - LOW | From currency | |
205 | Table/Structure Field | BAPI1093_3 - OPTION | Selection operator OPTION for range tables | |
206 | Table/Structure Field | BAPI1093_3 - SIGN | Inclusion/exclusion criterion SIGN for range tables | |
207 | Table/Structure Field | BAPI1093_4 - LOW | To-currency | |
208 | Table/Structure Field | BAPI1093_4 - OPTION | Selection operator OPTION for range tables | |
209 | Table/Structure Field | BAPI1093_4 - SIGN | Inclusion/exclusion criterion SIGN for range tables | |
210 | Table/Structure Field | SYST - DATUM | ABAP System Field: Current Date of Application Server | |
211 | Table/Structure Field | SYST - TABIX | ABAP System Field: Row Index of Internal Tables |