Table/Structure Field list used by SAP ABAP Program /RPM/LVC_REPORTINGF02 (Include /RPM/LVC_REPORTINGF02)
SAP ABAP Program /RPM/LVC_REPORTINGF02 (Include /RPM/LVC_REPORTINGF02) is using
# Object Type Object Name Object Description Note
     
1 Table/Structure Field  /RPM/DECISION - ACTUAL_FINISH Actual Finish Date
2 Table/Structure Field  /RPM/DECISION - ACTUAL_START Actual Start Date
3 Table/Structure Field  /RPM/DECISION - DECISION_ID ID
4 Table/Structure Field  /RPM/DECISION - FORECAST_FINISH Forecasted Finish Date
5 Table/Structure Field  /RPM/DECISION - FORECAST_START Forecasted Start
6 Table/Structure Field  /RPM/DECISION - ITEM_GUID Guid for application objects
7 Table/Structure Field  /RPM/DECISION - PLAN_FINISH Planned Finish Date
8 Table/Structure Field  /RPM/DECISION - PLAN_START Planned Start Date
9 Table/Structure Field  /RPM/ITEM_STATUS - STATUS Status
10 Table/Structure Field  /RPM/ITEM_STATUS - STATUS_GROUP Status Group
11 Table/Structure Field  /RPM/TS_BUCKET_API - BUCKET_GUID Guid for application objects
12 Table/Structure Field  /RPM/TS_BUCKET_API - CNT_REVIEWS Review Count for Bucket
13 Table/Structure Field  /RPM/TS_BUCKET_API - CURRENCY Currency Key
14 Table/Structure Field  /RPM/TS_BUCKET_ATTR_INT - BUCKET_GUID Guid for application objects
15 Table/Structure Field  /RPM/TS_BUCKET_ATTR_INT - CURRENCY Currency Key
16 Table/Structure Field  /RPM/TS_BUCKET_DATA - CNT_REVIEWS Review Count for Bucket
17 Table/Structure Field  /RPM/TS_BUCKET_DATA_DER - CNT_REVIEWS Review Count for Bucket
18 Table/Structure Field  /RPM/TS_DECISION_ATTR_INCL - ACTUAL_FINISH Actual Finish Date
19 Table/Structure Field  /RPM/TS_DECISION_ATTR_INCL - ACTUAL_START Actual Start Date
20 Table/Structure Field  /RPM/TS_DECISION_ATTR_INCL - DECISION_ID ID
21 Table/Structure Field  /RPM/TS_DECISION_ATTR_INCL - FORECAST_FINISH Forecasted Finish Date
22 Table/Structure Field  /RPM/TS_DECISION_ATTR_INCL - FORECAST_START Forecasted Start
23 Table/Structure Field  /RPM/TS_DECISION_ATTR_INCL - ITEM_GUID Guid for application objects
24 Table/Structure Field  /RPM/TS_DECISION_ATTR_INCL - PLAN_FINISH Planned Finish Date
25 Table/Structure Field  /RPM/TS_DECISION_ATTR_INCL - PLAN_START Planned Start Date
26 Table/Structure Field  /RPM/TS_ITEM_D_API - COSTD Development Cost
27 Table/Structure Field  /RPM/TS_ITEM_D_API - COSTL Launch Cost
28 Table/Structure Field  /RPM/TS_ITEM_D_API - CURRENCY Currency key
29 Table/Structure Field  /RPM/TS_ITEM_D_API - DERIVED_RISK Derived Risk
30 Table/Structure Field  /RPM/TS_ITEM_D_API - GUID Guid for application objects
31 Table/Structure Field  /RPM/TS_ITEM_D_API - NPV Net Present Value (manual)
32 Table/Structure Field  /RPM/TS_ITEM_D_API - PROBC Probability of Commercial Success
33 Table/Structure Field  /RPM/TS_ITEM_D_API - PROBT Probability of Technical Success
34 Table/Structure Field  /RPM/TS_ITEM_D_API - STATUS Status
35 Table/Structure Field  /RPM/TS_ITEM_D_ATT_SAP - COSTD Development Cost
36 Table/Structure Field  /RPM/TS_ITEM_D_ATT_SAP - COSTL Launch Cost
37 Table/Structure Field  /RPM/TS_ITEM_D_ATT_SAP - CURRENCY Currency key
38 Table/Structure Field  /RPM/TS_ITEM_D_ATT_SAP - NPV Net Present Value (manual)
39 Table/Structure Field  /RPM/TS_ITEM_D_ATT_SAP - PROBC Probability of Commercial Success
40 Table/Structure Field  /RPM/TS_ITEM_D_ATT_SAP - PROBT Probability of Technical Success
41 Table/Structure Field  /RPM/TS_ITEM_D_ATT_SAP - STATUS Status
42 Table/Structure Field  /RPM/TS_ITEM_D_DATA - COSTD Development Cost
43 Table/Structure Field  /RPM/TS_ITEM_D_DATA - COSTL Launch Cost
44 Table/Structure Field  /RPM/TS_ITEM_D_DATA - CURRENCY Currency key
45 Table/Structure Field  /RPM/TS_ITEM_D_DATA - DERIVED_RISK Derived Risk
46 Table/Structure Field  /RPM/TS_ITEM_D_DATA - NPV Net Present Value (manual)
47 Table/Structure Field  /RPM/TS_ITEM_D_DATA - PROBC Probability of Commercial Success
48 Table/Structure Field  /RPM/TS_ITEM_D_DATA - PROBT Probability of Technical Success
49 Table/Structure Field  /RPM/TS_ITEM_D_DATA - STATUS Status
50 Table/Structure Field  /RPM/TS_ITEM_D_DERIVED_ATT - DERIVED_RISK Derived Risk
51 Table/Structure Field  /RPM/TS_PERIOD - PERIOD Field of type DATS
52 Table/Structure Field  /RPM/TS_VC_BASIC_ATTRIBUTES - COSTD Development Cost
53 Table/Structure Field  /RPM/TS_VC_BASIC_ATTRIBUTES - COSTL Launch Cost
54 Table/Structure Field  /RPM/TS_VC_BASIC_ATTRIBUTES - CURRENCY Currency Key
55 Table/Structure Field  /RPM/TS_VC_BASIC_ATTRIBUTES - DERIVED_RISK Project Derived Risk
56 Table/Structure Field  /RPM/TS_VC_BASIC_ATTRIBUTES - NPV Net Present Value (manual)
57 Table/Structure Field  /RPM/TS_VC_BASIC_ATTRIBUTES - PROBC Probability of commercial Success
58 Table/Structure Field  /RPM/TS_VC_BASIC_ATTRIBUTES - PROBT Probability of technical Success
59 Table/Structure Field  /RPM/TS_VC_BUCKET - BUCKET_GUID_CHAR Guid in character type
60 Table/Structure Field  /RPM/TS_VC_BUCKET - PARENT_GUID_CHAR Guid in character type
61 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - ACTUAL_TD_1 Actual Total Duration to Finish (Lauch, in Months)
62 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - ACTUAL_TD_2 Actual Total Duration to Finish (Lauch, in Months)
63 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - ACTUAL_TD_3 Actual Total Duration to Finish (Lauch, in Months)
64 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - ACTUAL_TD_4 Actual Total Duration to Finish (Lauch, in Months)
65 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - ACTUAL_TD_5 Actual Total Duration to Finish (Lauch, in Months)
66 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - ACTUAL_TD_6 Actual Total Duration to Finish (Lauch, in Months)
67 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - ACTUAL_TD_7 Actual Total Duration to Finish (Lauch, in Months)
68 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - ACTUAL_TD_8 Actual Total Duration to Finish (Lauch, in Months)
69 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - BUCKET_GUID_CHAR Guid in character type
70 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - CNT_ITEMS_1 Number of Items
71 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - CNT_ITEMS_2 Number of Items
72 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - CNT_ITEMS_3 Number of Items
73 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - CNT_ITEMS_4 Number of Items
74 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - CNT_ITEMS_5 Number of Items
75 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - CNT_ITEMS_6 Number of Items
76 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - CNT_ITEMS_7 Number of Items
77 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - CNT_ITEMS_8 Number of Items
78 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - FORECASTED_TD_1 Forecasted Total Duration to Finish (Lauch, in Months)
79 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - FORECASTED_TD_2 Forecasted Total Duration to Finish (Lauch, in Months)
80 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - FORECASTED_TD_3 Forecasted Total Duration to Finish (Lauch, in Months)
81 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - FORECASTED_TD_4 Forecasted Total Duration to Finish (Lauch, in Months)
82 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - FORECASTED_TD_5 Forecasted Total Duration to Finish (Lauch, in Months)
83 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - FORECASTED_TD_6 Forecasted Total Duration to Finish (Lauch, in Months)
84 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - FORECASTED_TD_7 Forecasted Total Duration to Finish (Lauch, in Months)
85 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - FORECASTED_TD_8 Forecasted Total Duration to Finish (Lauch, in Months)
86 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - PARENT_GUID_CHAR Guid in character type
87 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - PLANNED_TD_1 Planned Total Duration to Finish (Lauch, in Months)
88 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - PLANNED_TD_2 Planned Total Duration to Finish (Lauch, in Months)
89 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - PLANNED_TD_3 Planned Total Duration to Finish (Lauch, in Months)
90 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - PLANNED_TD_4 Planned Total Duration to Finish (Lauch, in Months)
91 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - PLANNED_TD_5 Planned Total Duration to Finish (Lauch, in Months)
92 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - PLANNED_TD_6 Planned Total Duration to Finish (Lauch, in Months)
93 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - PLANNED_TD_7 Planned Total Duration to Finish (Lauch, in Months)
94 Table/Structure Field  /RPM/TS_VC_HISTORY_BUCKET - PLANNED_TD_8 Planned Total Duration to Finish (Lauch, in Months)
95 Table/Structure Field  /RPM/TS_VC_ITEM - BUCKET_GUID_CHAR Guid in character type
96 Table/Structure Field  /RPM/TS_VC_ITEM - ITEM_GUID_CHAR Guid in character type
97 Table/Structure Field  /RPM/TS_VC_ITEM_MASTER_DATA - ACTUAL_FINISH Actual Finish Date
98 Table/Structure Field  /RPM/TS_VC_ITEM_MASTER_DATA - ACTUAL_START Actual Start Date
99 Table/Structure Field  /RPM/TS_VC_ITEM_MASTER_DATA - FORECASTED_FINISH Forecasted Finish Date
100 Table/Structure Field  /RPM/TS_VC_ITEM_MASTER_DATA - FORECASTED_START Forecasted Start
101 Table/Structure Field  /RPM/TS_VC_ITEM_MASTER_DATA - ITEM_STATUS_GROUP_ID Status
102 Table/Structure Field  /RPM/TS_VC_ITEM_MASTER_DATA - PLANNED_FINISH Planned Finish Date
103 Table/Structure Field  /RPM/TS_VC_ITEM_MASTER_DATA - PLANNED_START Planned Start Date
104 Table/Structure Field  /RPM/TS_VC_PERIOD_LABLES - PERIOD_ID_1 Period ID
105 Table/Structure Field  /RPM/TS_VC_PERIOD_LABLES - PERIOD_ID_2 Period ID
106 Table/Structure Field  /RPM/TS_VC_PERIOD_LABLES - PERIOD_ID_3 Period ID
107 Table/Structure Field  /RPM/TS_VC_PERIOD_LABLES - PERIOD_ID_4 Period ID
108 Table/Structure Field  /RPM/TS_VC_PERIOD_LABLES - PERIOD_ID_5 Period ID
109 Table/Structure Field  /RPM/TS_VC_PERIOD_LABLES - PERIOD_ID_6 Period ID
110 Table/Structure Field  /RPM/TS_VC_PERIOD_LABLES - PERIOD_ID_7 Period ID
111 Table/Structure Field  /RPM/TS_VC_PERIOD_LABLES - PERIOD_ID_8 Period ID
112 Table/Structure Field  /RPM/TS_VC_PERIOD_LABLES - PERIOD_NAME_1 Period
113 Table/Structure Field  /RPM/TS_VC_PERIOD_LABLES - PERIOD_NAME_2 Period
114 Table/Structure Field  /RPM/TS_VC_PERIOD_LABLES - PERIOD_NAME_3 Period
115 Table/Structure Field  /RPM/TS_VC_PERIOD_LABLES - PERIOD_NAME_4 Period
116 Table/Structure Field  /RPM/TS_VC_PERIOD_LABLES - PERIOD_NAME_5 Period
117 Table/Structure Field  /RPM/TS_VC_PERIOD_LABLES - PERIOD_NAME_6 Period
118 Table/Structure Field  /RPM/TS_VC_PERIOD_LABLES - PERIOD_NAME_7 Period
119 Table/Structure Field  /RPM/TS_VC_PERIOD_LABLES - PERIOD_NAME_8 Period
120 Table/Structure Field  /RPM/TS_VC_TIMELINE_ATT - ACTUAL_D2D Actual Duration to Date (in Months)
121 Table/Structure Field  /RPM/TS_VC_TIMELINE_ATT - ACTUAL_D2F Actual Duration to Finish (Lauch, in Months)
122 Table/Structure Field  /RPM/TS_VC_TIMELINE_ATT - ACTUAL_TD Actual Total Duration to Finish (Lauch, in Months)
123 Table/Structure Field  /RPM/TS_VC_TIMELINE_ATT - COSTD Development Cost
124 Table/Structure Field  /RPM/TS_VC_TIMELINE_ATT - COSTL Launch Cost
125 Table/Structure Field  /RPM/TS_VC_TIMELINE_ATT - CURRENCY Currency Key
126 Table/Structure Field  /RPM/TS_VC_TIMELINE_ATT - DERIVED_RISK Project Derived Risk
127 Table/Structure Field  /RPM/TS_VC_TIMELINE_ATT - FORECASTED_D2D Forecasted Duration to Date (in Months)
128 Table/Structure Field  /RPM/TS_VC_TIMELINE_ATT - FORECASTED_D2F Forecasted Duration to Finish (Lauch, in Months)
129 Table/Structure Field  /RPM/TS_VC_TIMELINE_ATT - FORECASTED_TD Forecasted Total Duration to Finish (Lauch, in Months)
130 Table/Structure Field  /RPM/TS_VC_TIMELINE_ATT - NPV Net Present Value (manual)
131 Table/Structure Field  /RPM/TS_VC_TIMELINE_ATT - PLANNED_D2D Planned Duration to Date (in Months)
132 Table/Structure Field  /RPM/TS_VC_TIMELINE_ATT - PLANNED_D2F Planned Duration to Finish (Lauch, in Months)
133 Table/Structure Field  /RPM/TS_VC_TIMELINE_ATT - PLANNED_TD Planned Total Duration to Finish (Lauch, in Months)
134 Table/Structure Field  /RPM/TS_VC_TIMELINE_ATT - PROBC Probability of commercial Success
135 Table/Structure Field  /RPM/TS_VC_TIMELINE_ATT - PROBT Probability of technical Success
136 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - ACTUAL_D2D Actual Duration to Date (in Months)
137 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - ACTUAL_D2F Actual Duration to Finish (Lauch, in Months)
138 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - ACTUAL_TD Actual Total Duration to Finish (Lauch, in Months)
139 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - BUCKET_GUID_CHAR Guid in character type
140 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - CNT_DIRECT_SUBBUCKETS Number of Direct Subbuckets
141 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - CNT_ITEMS Number of Items
142 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - CNT_REVIEWS Number of Reviews in a Bucket (including Subbuckets)
143 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - CNT_REVIEWS_DIRECT Number of Reviews in a Bucket
144 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - CNT_SUBBUCKETS Number of Subbucket(s)
145 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - COSTD Development Cost
146 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - COSTL Launch Cost
147 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - CURRENCY Currency Key
148 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - FORECASTED_D2D Forecasted Duration to Date (in Months)
149 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - FORECASTED_D2F Forecasted Duration to Finish (Lauch, in Months)
150 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - FORECASTED_TD Forecasted Total Duration to Finish (Lauch, in Months)
151 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - NPV Net Present Value (manual)
152 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - PARENT_GUID_CHAR Guid in character type
153 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - PLANNED_D2D Planned Duration to Date (in Months)
154 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - PLANNED_D2F Planned Duration to Finish (Lauch, in Months)
155 Table/Structure Field  /RPM/TS_VC_TIMELINE_BUCKET - PLANNED_TD Planned Total Duration to Finish (Lauch, in Months)
156 Table/Structure Field  /RPM/TS_VC_TIMELINE_HISTORY - ACTUAL_D2D Actual Duration to Date (in Months)
157 Table/Structure Field  /RPM/TS_VC_TIMELINE_HISTORY - ACTUAL_D2F Actual Duration to Finish (Lauch, in Months)
158 Table/Structure Field  /RPM/TS_VC_TIMELINE_HISTORY - ACTUAL_TD Actual Total Duration to Finish (Lauch, in Months)
159 Table/Structure Field  /RPM/TS_VC_TIMELINE_HISTORY - CNT_ITEMS Number of Items
160 Table/Structure Field  /RPM/TS_VC_TIMELINE_HISTORY - DERIVED_RISK Project Derived Risk
161 Table/Structure Field  /RPM/TS_VC_TIMELINE_HISTORY - FORECASTED_D2D Forecasted Duration to Date (in Months)
162 Table/Structure Field  /RPM/TS_VC_TIMELINE_HISTORY - FORECASTED_D2F Forecasted Duration to Finish (Lauch, in Months)
163 Table/Structure Field  /RPM/TS_VC_TIMELINE_HISTORY - FORECASTED_TD Forecasted Total Duration to Finish (Lauch, in Months)
164 Table/Structure Field  /RPM/TS_VC_TIMELINE_HISTORY - PERIOD_END Finish Date
165 Table/Structure Field  /RPM/TS_VC_TIMELINE_HISTORY - PERIOD_ID Period ID
166 Table/Structure Field  /RPM/TS_VC_TIMELINE_HISTORY - PERIOD_NAME Period
167 Table/Structure Field  /RPM/TS_VC_TIMELINE_HISTORY - PERIOD_START Start Date
168 Table/Structure Field  /RPM/TS_VC_TIMELINE_HISTORY - PLANNED_D2D Planned Duration to Date (in Months)
169 Table/Structure Field  /RPM/TS_VC_TIMELINE_HISTORY - PLANNED_D2F Planned Duration to Finish (Lauch, in Months)
170 Table/Structure Field  /RPM/TS_VC_TIMELINE_HISTORY - PLANNED_TD Planned Total Duration to Finish (Lauch, in Months)
171 Table/Structure Field  /RPM/TS_VC_TIMELINE_HISTORY - PROBC Probability of commercial Success
172 Table/Structure Field  /RPM/TS_VC_TIMELINE_HISTORY - PROBT Probability of technical Success
173 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - ACTUAL_D2D Actual Duration to Date (in Months)
174 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - ACTUAL_D2F Actual Duration to Finish (Lauch, in Months)
175 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - ACTUAL_FINISH Actual Finish Date
176 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - ACTUAL_START Actual Start Date
177 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - ACTUAL_TD Actual Total Duration to Finish (Lauch, in Months)
178 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - BUCKET_GUID_CHAR Guid in character type
179 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - COSTD Development Cost
180 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - COSTL Launch Cost
181 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - CURRENCY Currency Key
182 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - DERIVED_RISK Project Derived Risk
183 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - FORECASTED_D2D Forecasted Duration to Date (in Months)
184 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - FORECASTED_D2F Forecasted Duration to Finish (Lauch, in Months)
185 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - FORECASTED_FINISH Forecasted Finish Date
186 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - FORECASTED_START Forecasted Start
187 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - FORECASTED_TD Forecasted Total Duration to Finish (Lauch, in Months)
188 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - ITEM_STATUS_GROUP_ID Status
189 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - NPV Net Present Value (manual)
190 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - PLANNED_D2D Planned Duration to Date (in Months)
191 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - PLANNED_D2F Planned Duration to Finish (Lauch, in Months)
192 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - PLANNED_FINISH Planned Finish Date
193 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - PLANNED_START Planned Start Date
194 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - PLANNED_TD Planned Total Duration to Finish (Lauch, in Months)
195 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - PROBC Probability of commercial Success
196 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - PROBT Probability of technical Success
197 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - TL_ACTUAL_FINISH Actual Finish Date
198 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - TL_ACTUAL_START Actual Start Date
199 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - TL_FORECASTED_FINISH Forecasted Finish Date
200 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - TL_FORECASTED_START Forecasted Start
201 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - TL_PLANNED_FINISH Planned Finish Date
202 Table/Structure Field  /RPM/TS_VC_TIMELINE_ITEM - TL_PLANNED_START Planned Start Date
203 Table/Structure Field  BAPI1093_0 - EXCH_RATE Direct Quoted Exchange Rate
204 Table/Structure Field  BAPI1093_3 - LOW From currency
205 Table/Structure Field  BAPI1093_3 - OPTION Selection operator OPTION for range tables
206 Table/Structure Field  BAPI1093_3 - SIGN Inclusion/exclusion criterion SIGN for range tables
207 Table/Structure Field  BAPI1093_4 - LOW To-currency
208 Table/Structure Field  BAPI1093_4 - OPTION Selection operator OPTION for range tables
209 Table/Structure Field  BAPI1093_4 - SIGN Inclusion/exclusion criterion SIGN for range tables
210 Table/Structure Field  SYST - DATUM ABAP System Field: Current Date of Application Server
211 Table/Structure Field  SYST - TABIX ABAP System Field: Row Index of Internal Tables