Table/Structure Field list used by SAP ABAP Function Module RPM_DPR_PROJECT_MAPPING (CProjects to xRPM mapping.)
SAP ABAP Function Module
RPM_DPR_PROJECT_MAPPING (CProjects to xRPM mapping.) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
![]() |
![]() |
|||
1 | ![]() |
CGPL_ATTR_INCL - ACTUALFINISH | Actual Finish Date | |
2 | ![]() |
CGPL_ATTR_INCL - ACTUALSTART | Actual Start Date | |
3 | ![]() |
CGPL_ATTR_INCL - CALENDAR_ID | Factory Calendar | |
4 | ![]() |
CGPL_ATTR_INCL - CHANGED_BY | Name of Person Who Changed Object | |
5 | ![]() |
CGPL_ATTR_INCL - CHANGED_ON | Date on Which Object Was Last Changed | |
6 | ![]() |
CGPL_ATTR_INCL - COMPLETION | Percentage of Completion | |
7 | ![]() |
CGPL_ATTR_INCL - CREATED_BY | Name of Person Who Created Object | |
8 | ![]() |
CGPL_ATTR_INCL - CREATED_ON | Date on Which the Object was Created | |
9 | ![]() |
CGPL_ATTR_INCL - DURATION | Duration of Execution | |
10 | ![]() |
CGPL_ATTR_INCL - DURATION_UNIT | Time Unit for Execution Duration | |
11 | ![]() |
CGPL_ATTR_INCL - LATEST_FINISH | Latest finish date | |
12 | ![]() |
CGPL_ATTR_INCL - LATEST_START | Latest start | |
13 | ![]() |
CGPL_ATTR_INCL - MILESTONE | Milestone indicator | |
14 | ![]() |
CGPL_ATTR_INCL - PLANFINISH | Planned Finish Date | |
15 | ![]() |
CGPL_ATTR_INCL - PLANSTART | Planned start date | |
16 | ![]() |
CGPL_ATTR_INCL - PRIORITY | Priority | |
17 | ![]() |
CGPL_ATTR_INCL - TOTAL_FLOAT | Total Float | |
18 | ![]() |
RPM_TS_BPS_IDS - BPS_EXTERNAL_ID | ID | |
19 | ![]() |
RPM_TS_CHECKLIST_CHG - PRIORITY | Priority | |
20 | ![]() |
RPM_TS_CHECKLIST_DIS - CHANGED_BY | Last Changed By | |
21 | ![]() |
RPM_TS_CHECKLIST_DIS - CREATED_BY | Object creator | |
22 | ![]() |
RPM_TS_CHECKLIST_DIS - CREATED_ON | Created On | |
23 | ![]() |
RPM_TS_CHECKLIST_EXT - CHANGED_BY | Last Changed By | |
24 | ![]() |
RPM_TS_CHECKLIST_EXT - CREATED_BY | Object creator | |
25 | ![]() |
RPM_TS_CHECKLIST_EXT - CREATED_ON | Created On | |
26 | ![]() |
RPM_TS_CHECKLIST_EXT - PRIORITY | Priority | |
27 | ![]() |
RPM_TS_CHECKLIST_ITEM_CHG - ACTUAL_FINISH | Actual Finish Date | |
28 | ![]() |
RPM_TS_CHECKLIST_ITEM_CHG - FINISH_DATE_FIX | Set Finish Date | |
29 | ![]() |
RPM_TS_CHECKLIST_ITEM_CHG - PRIORITY | Priority | |
30 | ![]() |
RPM_TS_CHECKLIST_ITEM_DIS - CHANGED_BY | Name of Person Who Changed Object | |
31 | ![]() |
RPM_TS_CHECKLIST_ITEM_DIS - CHANGED_ON | Date on Which Object Was Last Changed | |
32 | ![]() |
RPM_TS_CHECKLIST_ITEM_DIS - CREATED_BY | Name of Person Who Created Object | |
33 | ![]() |
RPM_TS_CHECKLIST_ITEM_DIS - CREATED_ON | Date on Which the Object was Created | |
34 | ![]() |
RPM_TS_CHECKLIST_ITEM_DIS - SCHEDULED_FINISH | Calulated Finish Date | |
35 | ![]() |
RPM_TS_CHECKLIST_ITEM_DIS - SCHEDULED_FINISH_LATE | Latest Finish Date | |
36 | ![]() |
RPM_TS_CHECKLIST_ITEM_EXT - ACTUAL_FINISH | Actual Finish Date | |
37 | ![]() |
RPM_TS_CHECKLIST_ITEM_EXT - CHANGED_BY | Name of Person Who Changed Object | |
38 | ![]() |
RPM_TS_CHECKLIST_ITEM_EXT - CHANGED_ON | Date on Which Object Was Last Changed | |
39 | ![]() |
RPM_TS_CHECKLIST_ITEM_EXT - CREATED_BY | Name of Person Who Created Object | |
40 | ![]() |
RPM_TS_CHECKLIST_ITEM_EXT - CREATED_ON | Date on Which the Object was Created | |
41 | ![]() |
RPM_TS_CHECKLIST_ITEM_EXT - FINISH_DATE_FIX | Set Finish Date | |
42 | ![]() |
RPM_TS_CHECKLIST_ITEM_EXT - PRIORITY | Priority | |
43 | ![]() |
RPM_TS_CHECKLIST_ITEM_EXT - SCHEDULED_FINISH | Calulated Finish Date | |
44 | ![]() |
RPM_TS_CHECKLIST_ITEM_EXT - SCHEDULED_FINISH_LATE | Latest Finish Date | |
45 | ![]() |
RPM_TS_PHASE_CHG - CALENDAR_ID | Calendar | |
46 | ![]() |
RPM_TS_PHASE_CHG - DURATION | Processing Time | |
47 | ![]() |
RPM_TS_PHASE_CHG - FINISH_DATE_FIX | Set Finish Date | |
48 | ![]() |
RPM_TS_PHASE_CHG - START_DATE_FIX | Set Start Date | |
49 | ![]() |
RPM_TS_PHASE_DIS - DURATION_UNIT | Time Unit for Execution Duration | |
50 | ![]() |
RPM_TS_PHASE_DIS - SCHEDULED_FINISH | Calulated Finish Date | |
51 | ![]() |
RPM_TS_PHASE_DIS - SCHEDULED_FINISH_LATE | Latest Finish Date | |
52 | ![]() |
RPM_TS_PHASE_DIS - SCHEDULED_START | Calulated Start Date | |
53 | ![]() |
RPM_TS_PHASE_DIS - SCHEDULED_START_LATE | Latest Start Date | |
54 | ![]() |
RPM_TS_PHASE_DIS - TOTAL_FLOAT | Total Float | |
55 | ![]() |
RPM_TS_PHASE_EXT - CALENDAR_ID | Calendar | |
56 | ![]() |
RPM_TS_PHASE_EXT - DURATION | Processing Time | |
57 | ![]() |
RPM_TS_PHASE_EXT - DURATION_UNIT | Time Unit for Execution Duration | |
58 | ![]() |
RPM_TS_PHASE_EXT - FINISH_DATE_FIX | Set Finish Date | |
59 | ![]() |
RPM_TS_PHASE_EXT - SCHEDULED_FINISH | Calulated Finish Date | |
60 | ![]() |
RPM_TS_PHASE_EXT - SCHEDULED_FINISH_LATE | Latest Finish Date | |
61 | ![]() |
RPM_TS_PHASE_EXT - SCHEDULED_START | Calulated Start Date | |
62 | ![]() |
RPM_TS_PHASE_EXT - SCHEDULED_START_LATE | Latest Start Date | |
63 | ![]() |
RPM_TS_PHASE_EXT - START_DATE_FIX | Set Start Date | |
64 | ![]() |
RPM_TS_PHASE_EXT - TOTAL_FLOAT | Total Float | |
65 | ![]() |
RPM_TS_PROJECT_ATT - PPRIO | Project Priority | |
66 | ![]() |
RPM_TS_PROJECT_ATT_SAP - PPRIO | Project Priority | |
67 | ![]() |
RPM_TS_PROJECT_CHG - CALENDAR_ID | Calendar | |
68 | ![]() |
RPM_TS_PROJECT_CHG - FINISH_DATE_FIX | Set Finish Date | |
69 | ![]() |
RPM_TS_PROJECT_CHG - PRIORITY | Priority | |
70 | ![]() |
RPM_TS_PROJECT_CHG - START_DATE_FIX | Set Start Date | |
71 | ![]() |
RPM_TS_PROJECT_DIS - CHANGED_BY | Last Changed By | |
72 | ![]() |
RPM_TS_PROJECT_DIS - CREATED_BY | Object creator | |
73 | ![]() |
RPM_TS_PROJECT_DIS - CREATED_ON | Created On | |
74 | ![]() |
RPM_TS_PROJECT_DIS - SCHEDULED_FINISH | Calulated Finish Date | |
75 | ![]() |
RPM_TS_PROJECT_DIS - SCHEDULED_START | Calulated Start Date | |
76 | ![]() |
RPM_TS_PROJECT_EXT - CALENDAR_ID | Calendar | |
77 | ![]() |
RPM_TS_PROJECT_EXT - CHANGED_BY | Last Changed By | |
78 | ![]() |
RPM_TS_PROJECT_EXT - CREATED_BY | Object creator | |
79 | ![]() |
RPM_TS_PROJECT_EXT - CREATED_ON | Created On | |
80 | ![]() |
RPM_TS_PROJECT_EXT - FINISH_DATE_FIX | Set Finish Date | |
81 | ![]() |
RPM_TS_PROJECT_EXT - PRIORITY | Priority | |
82 | ![]() |
RPM_TS_PROJECT_EXT - SCHEDULED_FINISH | Calulated Finish Date | |
83 | ![]() |
RPM_TS_PROJECT_EXT - SCHEDULED_START | Calulated Start Date | |
84 | ![]() |
RPM_TS_PROJECT_EXT - START_DATE_FIX | Set Start Date | |
85 | ![]() |
RPM_TS_PROJECT_INF - BPS_EXTERNAL_ID | ID | |
86 | ![]() |
RPM_TS_PROJECT_INF - CGPL_PROJECT | RPM_TS_PROJECT_INF-CGPL_PROJECT | |
87 | ![]() |
RPM_TS_PROJECT_INF - EXTERNAL_ID | ID | |
88 | ![]() |
RPM_TS_PROJECT_INF - RPM_PROJECT | RPM_TS_PROJECT_INF-RPM_PROJECT | |
89 | ![]() |
RPM_TS_PROJECT_INT - CGPL_PROJECT | RPM_TS_PROJECT_INT-CGPL_PROJECT | |
90 | ![]() |
RPM_TS_PROJECT_INT - EXTERNAL_ID | ID | |
91 | ![]() |
RPM_TS_PROJECT_INT - RPM_PROJECT | RPM_TS_PROJECT_INT-RPM_PROJECT | |
92 | ![]() |
RPM_TS_TASK_CHG - ACTUAL_FINISH | Actual Finish Date | |
93 | ![]() |
RPM_TS_TASK_CHG - ACTUAL_START | Actual Start Date | |
94 | ![]() |
RPM_TS_TASK_CHG - CALENDAR_ID | Calendar | |
95 | ![]() |
RPM_TS_TASK_CHG - COMPLETION | Percentage of Completion | |
96 | ![]() |
RPM_TS_TASK_CHG - DURATION | Processing Time | |
97 | ![]() |
RPM_TS_TASK_CHG - MILESTONE | Milestone Indicator | |
98 | ![]() |
RPM_TS_TASK_DIS - DURATION_UNIT | Time Unit for Execution Duration | |
99 | ![]() |
RPM_TS_TASK_DIS - SCHEDULED_FINISH | Calulated Finish Date | |
100 | ![]() |
RPM_TS_TASK_DIS - SCHEDULED_FINISH_LATE | Latest Finish Date | |
101 | ![]() |
RPM_TS_TASK_DIS - SCHEDULED_START | Calulated Start Date | |
102 | ![]() |
RPM_TS_TASK_DIS - SCHEDULED_START_LATE | Latest Start Date | |
103 | ![]() |
RPM_TS_TASK_DIS - TOTAL_FLOAT | Total Float | |
104 | ![]() |
RPM_TS_TASK_EXT - ACTUAL_FINISH | Actual Finish Date | |
105 | ![]() |
RPM_TS_TASK_EXT - ACTUAL_START | Actual Start Date | |
106 | ![]() |
RPM_TS_TASK_EXT - CALENDAR_ID | Calendar | |
107 | ![]() |
RPM_TS_TASK_EXT - COMPLETION | Percentage of Completion | |
108 | ![]() |
RPM_TS_TASK_EXT - DURATION | Processing Time | |
109 | ![]() |
RPM_TS_TASK_EXT - DURATION_UNIT | Time Unit for Execution Duration | |
110 | ![]() |
RPM_TS_TASK_EXT - MILESTONE | Milestone Indicator | |
111 | ![]() |
RPM_TS_TASK_EXT - SCHEDULED_FINISH | Calulated Finish Date | |
112 | ![]() |
RPM_TS_TASK_EXT - SCHEDULED_FINISH_LATE | Latest Finish Date | |
113 | ![]() |
RPM_TS_TASK_EXT - SCHEDULED_START | Calulated Start Date | |
114 | ![]() |
RPM_TS_TASK_EXT - SCHEDULED_START_LATE | Latest Start Date | |
115 | ![]() |
RPM_TS_TASK_EXT - TOTAL_FLOAT | Total Float | |
116 | ![]() |
RPM_TS_TASK_INF - ACTUALFINISH | Actual Finish Date | |
117 | ![]() |
RPM_TS_TASK_INF - ACTUALSTART | Actual Start Date | |
118 | ![]() |
RPM_TS_TASK_INF - BPS_EXTERNAL_ID | ID | |
119 | ![]() |
RPM_TS_TASK_INF - CALENDAR_ID | Factory Calendar | |
120 | ![]() |
RPM_TS_TASK_INF - CHANGED_BY | Name of Person Who Changed Object | |
121 | ![]() |
RPM_TS_TASK_INF - CHANGED_ON | Date on Which Object Was Last Changed | |
122 | ![]() |
RPM_TS_TASK_INF - COMPLETION | Percentage of Completion | |
123 | ![]() |
RPM_TS_TASK_INF - CREATED_BY | Name of Person Who Created Object | |
124 | ![]() |
RPM_TS_TASK_INF - CREATED_ON | Date on Which the Object was Created | |
125 | ![]() |
RPM_TS_TASK_INF - DURATION | Duration of Execution | |
126 | ![]() |
RPM_TS_TASK_INF - DURATION_UNIT | Time Unit for Execution Duration | |
127 | ![]() |
RPM_TS_TASK_INF - EXTERNAL_ID | ID | |
128 | ![]() |
RPM_TS_TASK_INF - LATEST_FINISH | Latest finish date | |
129 | ![]() |
RPM_TS_TASK_INF - LATEST_START | Latest start | |
130 | ![]() |
RPM_TS_TASK_INF - MILESTONE | Milestone indicator | |
131 | ![]() |
RPM_TS_TASK_INF - PLANFINISH | Planned Finish Date | |
132 | ![]() |
RPM_TS_TASK_INF - PLANSTART | Planned start date | |
133 | ![]() |
RPM_TS_TASK_INF - PRIORITY | Priority | |
134 | ![]() |
RPM_TS_TASK_INF - TOTAL_FLOAT | Total Float | |
135 | ![]() |
RPM_TS_TASK_INT - ACTUALFINISH | Actual Finish Date | |
136 | ![]() |
RPM_TS_TASK_INT - ACTUALSTART | Actual Start Date | |
137 | ![]() |
RPM_TS_TASK_INT - CALENDAR_ID | Factory Calendar | |
138 | ![]() |
RPM_TS_TASK_INT - CHANGED_BY | Name of Person Who Changed Object | |
139 | ![]() |
RPM_TS_TASK_INT - CHANGED_ON | Date on Which Object Was Last Changed | |
140 | ![]() |
RPM_TS_TASK_INT - COMPLETION | Percentage of Completion | |
141 | ![]() |
RPM_TS_TASK_INT - CREATED_BY | Name of Person Who Created Object | |
142 | ![]() |
RPM_TS_TASK_INT - CREATED_ON | Date on Which the Object was Created | |
143 | ![]() |
RPM_TS_TASK_INT - DURATION | Duration of Execution | |
144 | ![]() |
RPM_TS_TASK_INT - DURATION_UNIT | Time Unit for Execution Duration | |
145 | ![]() |
RPM_TS_TASK_INT - EXTERNAL_ID | ID | |
146 | ![]() |
RPM_TS_TASK_INT - LATEST_FINISH | Latest finish date | |
147 | ![]() |
RPM_TS_TASK_INT - LATEST_START | Latest start | |
148 | ![]() |
RPM_TS_TASK_INT - MILESTONE | Milestone indicator | |
149 | ![]() |
RPM_TS_TASK_INT - PLANFINISH | Planned Finish Date | |
150 | ![]() |
RPM_TS_TASK_INT - PLANSTART | Planned start date | |
151 | ![]() |
RPM_TS_TASK_INT - PRIORITY | Priority | |
152 | ![]() |
RPM_TS_TASK_INT - TOTAL_FLOAT | Total Float | |
153 | ![]() |
RPM_TS_XML_CHECKLISTITEM_TYPE - CHECKLISTITEMDATA | RPM_TS_XML_CHECKLISTITEM_TYPE-CHECKLISTITEMDATA | |
154 | ![]() |
RPM_TS_XML_CHECKLIST_DATA_TYPE - CHANGED_BY | Last Changed By | |
155 | ![]() |
RPM_TS_XML_CHECKLIST_DATA_TYPE - CREATED_BY | Object creator | |
156 | ![]() |
RPM_TS_XML_CHECKLIST_DATA_TYPE - CREATED_ON | Created On | |
157 | ![]() |
RPM_TS_XML_CHECKLIST_DATA_TYPE - NUMBER | Number | |
158 | ![]() |
RPM_TS_XML_CHECKLIST_DATA_TYPE - PRIORITY | Priority | |
159 | ![]() |
RPM_TS_XML_CHECKLIST_TYPE - CHECKLISTDATA | RPM_TS_XML_CHECKLIST_TYPE-CHECKLISTDATA | |
160 | ![]() |
RPM_TS_XML_CHECKLIST_TYPE - CHECKLISTITEMS | RPM_TS_XML_CHECKLIST_TYPE-CHECKLISTITEMS | |
161 | ![]() |
RPM_TS_XML_CHKLIST_I_DATA_TYPE - ACTUAL_FINISH | Actual Finish Date | |
162 | ![]() |
RPM_TS_XML_CHKLIST_I_DATA_TYPE - CHANGED_BY | Name of Person Who Changed Object | |
163 | ![]() |
RPM_TS_XML_CHKLIST_I_DATA_TYPE - CHANGED_ON | Date on Which Object Was Last Changed | |
164 | ![]() |
RPM_TS_XML_CHKLIST_I_DATA_TYPE - CREATED_BY | Name of Person Who Created Object | |
165 | ![]() |
RPM_TS_XML_CHKLIST_I_DATA_TYPE - CREATED_ON | Date on Which the Object was Created | |
166 | ![]() |
RPM_TS_XML_CHKLIST_I_DATA_TYPE - FINISH_DATE_FIX | Set Finish Date | |
167 | ![]() |
RPM_TS_XML_CHKLIST_I_DATA_TYPE - NUMBER | Number | |
168 | ![]() |
RPM_TS_XML_CHKLIST_I_DATA_TYPE - PRIORITY | Priority | |
169 | ![]() |
RPM_TS_XML_CHKLIST_I_DATA_TYPE - SCHEDULED_FINISH | Calulated Finish Date | |
170 | ![]() |
RPM_TS_XML_CHKLIST_I_DATA_TYPE - SCHEDULED_FINISH_LATE | Latest Finish Date | |
171 | ![]() |
RPM_TS_XML_PHASE_DATA_TYPE - CALENDAR_ID | Calendar | |
172 | ![]() |
RPM_TS_XML_PHASE_DATA_TYPE - DURATION | Processing Time | |
173 | ![]() |
RPM_TS_XML_PHASE_DATA_TYPE - DURATION_UNIT | Time Unit for Execution Duration | |
174 | ![]() |
RPM_TS_XML_PHASE_DATA_TYPE - FINISH_DATE_FIX | Set Finish Date | |
175 | ![]() |
RPM_TS_XML_PHASE_DATA_TYPE - NUMBER | Number | |
176 | ![]() |
RPM_TS_XML_PHASE_DATA_TYPE - SCHEDULED_FINISH | Calulated Finish Date | |
177 | ![]() |
RPM_TS_XML_PHASE_DATA_TYPE - SCHEDULED_FINISH_LATE | Latest Finish Date | |
178 | ![]() |
RPM_TS_XML_PHASE_DATA_TYPE - SCHEDULED_START | Calulated Start Date | |
179 | ![]() |
RPM_TS_XML_PHASE_DATA_TYPE - SCHEDULED_START_LATE | Latest Start Date | |
180 | ![]() |
RPM_TS_XML_PHASE_DATA_TYPE - START_DATE_FIX | Set Start Date | |
181 | ![]() |
RPM_TS_XML_PHASE_DATA_TYPE - TOTAL_FLOAT | Total Float | |
182 | ![]() |
RPM_TS_XML_PHASE_TYPE - CHECKLISTS | RPM_TS_XML_PHASE_TYPE-CHECKLISTS | |
183 | ![]() |
RPM_TS_XML_PHASE_TYPE - PHASEDATA | RPM_TS_XML_PHASE_TYPE-PHASEDATA | |
184 | ![]() |
RPM_TS_XML_PHASE_TYPE - TASKS | RPM_TS_XML_PHASE_TYPE-TASKS | |
185 | ![]() |
RPM_TS_XML_PROJECT_DATA_TYPE - CALENDAR_ID | Calendar | |
186 | ![]() |
RPM_TS_XML_PROJECT_DATA_TYPE - CHANGED_BY | Last Changed By | |
187 | ![]() |
RPM_TS_XML_PROJECT_DATA_TYPE - CREATED_BY | Object creator | |
188 | ![]() |
RPM_TS_XML_PROJECT_DATA_TYPE - CREATED_ON | Created On | |
189 | ![]() |
RPM_TS_XML_PROJECT_DATA_TYPE - FINISH_DATE_FIX | Set Finish Date | |
190 | ![]() |
RPM_TS_XML_PROJECT_DATA_TYPE - NUMBER | Number | |
191 | ![]() |
RPM_TS_XML_PROJECT_DATA_TYPE - PRIORITY | Priority | |
192 | ![]() |
RPM_TS_XML_PROJECT_DATA_TYPE - SCHEDULED_FINISH | Calulated Finish Date | |
193 | ![]() |
RPM_TS_XML_PROJECT_DATA_TYPE - SCHEDULED_START | Calulated Start Date | |
194 | ![]() |
RPM_TS_XML_PROJECT_DATA_TYPE - START_DATE_FIX | Set Start Date | |
195 | ![]() |
RPM_TS_XML_PROJECT_TYPE - PHASES | RPM_TS_XML_PROJECT_TYPE-PHASES | |
196 | ![]() |
RPM_TS_XML_PROJECT_TYPE - PROJECTDATA | RPM_TS_XML_PROJECT_TYPE-PROJECTDATA | |
197 | ![]() |
RPM_TS_XML_PROJECT_TYPE - PROJECT_ROLES | RPM_TS_XML_PROJECT_TYPE-PROJECT_ROLES | |
198 | ![]() |
RPM_TS_XML_PROJECT_TYPE - RESOURCES | RPM_TS_XML_PROJECT_TYPE-RESOURCES | |
199 | ![]() |
RPM_TS_XML_TASK_DATA_TYPE - ACTUAL_FINISH | Actual Finish Date | |
200 | ![]() |
RPM_TS_XML_TASK_DATA_TYPE - ACTUAL_START | Actual Start Date | |
201 | ![]() |
RPM_TS_XML_TASK_DATA_TYPE - CALENDAR_ID | Calendar | |
202 | ![]() |
RPM_TS_XML_TASK_DATA_TYPE - COMPLETION | Percentage of Completion | |
203 | ![]() |
RPM_TS_XML_TASK_DATA_TYPE - DURATION | Processing Time | |
204 | ![]() |
RPM_TS_XML_TASK_DATA_TYPE - DURATION_UNIT | Time Unit for Execution Duration | |
205 | ![]() |
RPM_TS_XML_TASK_DATA_TYPE - MILESTONE | Milestone Indicator | |
206 | ![]() |
RPM_TS_XML_TASK_DATA_TYPE - NUMBER | Number | |
207 | ![]() |
RPM_TS_XML_TASK_DATA_TYPE - SCHEDULED_FINISH | Calulated Finish Date | |
208 | ![]() |
RPM_TS_XML_TASK_DATA_TYPE - SCHEDULED_FINISH_LATE | Latest Finish Date | |
209 | ![]() |
RPM_TS_XML_TASK_DATA_TYPE - SCHEDULED_START | Calulated Start Date | |
210 | ![]() |
RPM_TS_XML_TASK_DATA_TYPE - SCHEDULED_START_LATE | Latest Start Date | |
211 | ![]() |
RPM_TS_XML_TASK_DATA_TYPE - TOTAL_FLOAT | Total Float | |
212 | ![]() |
RPM_TS_XML_TASK_TYPE - TASKDATA | RPM_TS_XML_TASK_TYPE-TASKDATA |