Table/Structure Field list used by SAP ABAP Function Module REQUIREMENTS_SCHEDULE_MAINTAIN (Pflege Planprimärbedarfseinteilung)
SAP ABAP Function Module
REQUIREMENTS_SCHEDULE_MAINTAIN (Pflege Planprimärbedarfseinteilung) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AM60X - H_ENTLI | Date type (day, week, month, interval) | ||
| 2 | MT61D - MMSTA | Plant-Specific Material Status | ||
| 3 | MT61D - MMSTD | Date from which the plant-specific material status is valid | ||
| 4 | MT61D - MSTAE | Cross-Plant Material Status | ||
| 5 | MT61D - MSTDE | Date from which the cross-plant material status is valid | ||
| 6 | PBET - POSNR | Requirements plan item | ||
| 7 | PBET - UPDKZ | Update indicator | ||
| 8 | PBET - TXTET | Indicator: long text exists | ||
| 9 | PBET - STPKT | Supporting point for independent requirements | ||
| 10 | PBET - PLNMG | Planned quantity | ||
| 11 | PBET - PDATU | Delivery/order finish date | ||
| 12 | PBET - MEINS | Base Unit of Measure | ||
| 13 | PBET - LAEDA | Date of Last Change | ||
| 14 | PBET - ENTMG | Withdrawal quantity | ||
| 15 | PBET - ENTLI | Date type (day, week, month, interval) | ||
| 16 | PBET - CUOBJ | Configuration (internal object number) | ||
| 17 | PBET - AENAM | Name of Person Who Changed Object | ||
| 18 | PBPT - ANZET | Independent requirements - schedule line number | ||
| 19 | PBPT - EPMEH | Do multiple schedule lines exist? | ||
| 20 | PBPT - MEINS | Base Unit of Measure | ||
| 21 | PBPT - POSNR | Requirements plan item | ||
| 22 | RM60X - EDATV | Requirements date | ||
| 23 | SYST - DATLO | ABAP System Field: Local Date of Current User | ||
| 24 | SYST - DYNNR | ABAP System Field: Current Dynpro Number | ||
| 25 | SYST - STEPL | ABAP System Field: Current Step Loop or Table Control Line | ||
| 26 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 27 | SYST - UNAME | ABAP System Field: Name of Current User |