Table/Structure Field list used by SAP ABAP Function Module CX_SCHEDULE (Scheduling with range and float determination)
SAP ABAP Function Module
CX_SCHEDULE (Scheduling with range and float determination) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AFVGD - RSTUF | Reduction level which reduces operation lead time | ||
| 2 | AFVGD - ARBID | Object ID of the resource | ||
| 3 | AFVGI - ARBID | Object ID of the resource | ||
| 4 | AFVGI - RSTUF | Reduction level which reduces operation lead time | ||
| 5 | CAUFVD - KAPVERSA | Version of Available Capacity | ||
| 6 | CAUFVD - VORGZ_TRM | Scheduled float before production in days | ||
| 7 | CAUFVD - UPTER | Indicator: Change to Scheduled Dates | ||
| 8 | CAUFVD - SICHZ_TRM | Scheduled float after production in days | ||
| 9 | CAUFVD - REDKZ | Reduction indicator for scheduling | ||
| 10 | CAUFVD - INDBT | Field defined as in SY-TABIX | ||
| 11 | CAUFVD - GSUZP | Basic start time | ||
| 12 | CAUFVD - GSTRP | Basic start date | ||
| 13 | CAUFVD - GLUZP | Basic finish (time) | ||
| 14 | CAUFVD - GLTRP | Basic finish date | ||
| 15 | CAUFVD - AUTYP | Order category | ||
| 16 | CAUFVD - AUFNR | Order Number | ||
| 17 | CAUFVTAB - AUTYP | Order category | ||
| 18 | CAUFVTAB - VORGZ_TRM | Scheduled float before production in days | ||
| 19 | CAUFVTAB - UPTER | Indicator: Change to Scheduled Dates | ||
| 20 | CAUFVTAB - SICHZ_TRM | Scheduled float after production in days | ||
| 21 | CAUFVTAB - REDKZ | Reduction indicator for scheduling | ||
| 22 | CAUFVTAB - KAPVERSA | Version of Available Capacity | ||
| 23 | CAUFVTAB - GSUZP | Basic start time | ||
| 24 | CAUFVTAB - GSTRP | Basic start date | ||
| 25 | CAUFVTAB - GLUZP | Basic finish (time) | ||
| 26 | CAUFVTAB - GLTRP | Basic finish date | ||
| 27 | CAUFVTAB - AUFNR | Order Number | ||
| 28 | COCAUFVINF - INDBT | Field defined as in SY-TABIX | ||
| 29 | CRHD - OBJID | Object ID of the resource | ||
| 30 | CXZEIT - FSEL | Earliest finish of wait time | ||
| 31 | CXZEIT - SSSL | Latest start date for wait time | ||
| 32 | CXZEIT - SSSB | Latest start for processing | ||
| 33 | CXZEIT - SSSA | Latest start date for teardown | ||
| 34 | CXZEIT - SSEL | Latest finish of wait time | ||
| 35 | CXZEIT - SSED | Latest finish of execution | ||
| 36 | CXZEIT - FSSL | Earliest start for wait time | ||
| 37 | CXZEIT - FSSB | Earliest start for processing | ||
| 38 | CXZEIT - FSSA | Earliest start for teardown | ||
| 39 | CXZEIT - FSED | Earliest finish of execution time | ||
| 40 | CXZEIT - FSAV | Earliest operation start date | ||
| 41 | CXZEIT - SSAV | Latest start date of operation | ||
| 42 | MDSCT - OLTRS | Scheduled finish - planning operation | ||
| 43 | MDSCT - OLUZS | Finish time of planning operation | ||
| 44 | MDSCT - OSTRS | Scheduled start - planning operation | ||
| 45 | MDSCT - OSUZS | Start time of planning operation | ||
| 46 | MDSCT - PLARB | Work center | ||
| 47 | RCLST - OBJECT | Data objects of a task list | ||
| 48 | SYST - DATUM | ABAP System Field: Current Date of Application Server | ||
| 49 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 50 | SYST - DATLO | ABAP System Field: Local Date of Current User | ||
| 51 | T001W - WERKS | Plant | ||
| 52 | T430 - KAPA | Indicator: Determine capacity requirements | ||
| 53 | T430 - TERM | Indicator: Scheduling | ||
| 54 | T482 - ECK_UHRZT | Basic dates with time of day | ||
| 55 | T482 - NTERM | Only calculate capacity requirements | ||
| 56 | T482 - RUEKT | Backward scheduling | ||
| 57 | T482 - TAGDT | Schedule from current date | ||
| 58 | T482 - VORWT | Forward scheduling | ||
| 59 | TCX00 - AUF_SHIFT | Indicator: Shift order/network | ||
| 60 | TCX00 - DADJ2 | Adjust dates in lead time scheduling | ||
| 61 | TCX00 - REDST_MAX | Maximum reduction level | ||
| 62 | TCX00 - RED_ART | Reduction type |