Table/Structure Field list used by SAP ABAP Function Module CX_INIT_SCHEDULING (Initialization of Scheduling)
SAP ABAP Function Module
CX_INIT_SCHEDULING (Initialization of Scheduling) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | CAUFVD - AUFNR | Order Number | ||
| 2 | CAUFVD - AUTYP | Order category | ||
| 3 | CAUFVD - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 4 | CAUFVD - FLG_AOB | Indicator: relationships | ||
| 5 | CAUFVD - FLG_ARBEI | Indicator: Default value work is relevant | ||
| 6 | CAUFVD - GASMG | Total scrap quantity in the order | ||
| 7 | CAUFVD - GLTPP | Finish date (forecast) | ||
| 8 | CAUFVD - GLTRP | Basic finish date | ||
| 9 | CAUFVD - GLTRS | Scheduled finish | ||
| 10 | CAUFVD - GLUPP | Forecast finish (time) | ||
| 11 | CAUFVD - GLUZP | Basic finish (time) | ||
| 12 | CAUFVD - GLUZS | Scheduled finish time | ||
| 13 | CAUFVD - GSTPP | Forecast start date | ||
| 14 | CAUFVD - GSTRP | Basic start date | ||
| 15 | CAUFVD - GSTRS | Scheduled start | ||
| 16 | CAUFVD - GSUPP | Forecast start (time) | ||
| 17 | CAUFVD - GSUZP | Basic start time | ||
| 18 | CAUFVD - GSUZS | Scheduled Start (Time) | ||
| 19 | CAUFVD - INDBT | Field defined as in SY-TABIX | ||
| 20 | CAUFVD - MATNR | Material Number for Order | ||
| 21 | CAUFVD - PLART | Basis for scheduling | ||
| 22 | CAUFVD - PLNTY | Task List Type | ||
| 23 | CAUFVD - PNETENDD | Outline finish of collective order (date) | ||
| 24 | CAUFVD - PNETENDT | Outline finish time | ||
| 25 | CAUFVD - PNETSTARTD | Outline start of collective network (date) | ||
| 26 | CAUFVD - PNETSTARTT | Start time of a collective order | ||
| 27 | CAUFVD - PRODNET | Indicator: Order is part of collective order | ||
| 28 | CAUFVD - REDKZ | Reduction indicator for scheduling | ||
| 29 | CAUFVD - SICHZ | Float after production (in days) | ||
| 30 | CAUFVD - TERKZ | Scheduling type | ||
| 31 | CAUFVD - TMBAS | Set of dates for network | ||
| 32 | CAUFVD - TRKZP | Scheduling type (forecast) | ||
| 33 | CAUFVD - TYPKZ | Type of object causing the load (order category) | ||
| 34 | CAUFVD - UPTER | Indicator: Change to Scheduled Dates | ||
| 35 | CAUFVD - VORGZ | Float before production (in days) | ||
| 36 | CAUFVD - WERKS | Plant | ||
| 37 | CAUFVTAB - AUFNR | Order Number | ||
| 38 | CAUFVTAB - AUTYP | Order category | ||
| 39 | CAUFVTAB - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 40 | CAUFVTAB - FLG_AOB | Indicator: relationships | ||
| 41 | CAUFVTAB - FLG_ARBEI | Indicator: Default value work is relevant | ||
| 42 | CAUFVTAB - GASMG | Total scrap quantity in the order | ||
| 43 | CAUFVTAB - GLTPP | Finish date (forecast) | ||
| 44 | CAUFVTAB - GLTRP | Basic finish date | ||
| 45 | CAUFVTAB - GLTRS | Scheduled finish | ||
| 46 | CAUFVTAB - GLUPP | Forecast finish (time) | ||
| 47 | CAUFVTAB - GLUZP | Basic finish (time) | ||
| 48 | CAUFVTAB - GLUZS | Scheduled finish time | ||
| 49 | CAUFVTAB - GSTPP | Forecast start date | ||
| 50 | CAUFVTAB - GSTRP | Basic start date | ||
| 51 | CAUFVTAB - GSTRS | Scheduled start | ||
| 52 | CAUFVTAB - GSUPP | Forecast start (time) | ||
| 53 | CAUFVTAB - GSUZP | Basic start time | ||
| 54 | CAUFVTAB - GSUZS | Scheduled Start (Time) | ||
| 55 | CAUFVTAB - PLART | Basis for scheduling | ||
| 56 | CAUFVTAB - PLNTY | Task List Type | ||
| 57 | CAUFVTAB - PNETENDD | Outline finish of collective order (date) | ||
| 58 | CAUFVTAB - PNETENDT | Outline finish time | ||
| 59 | CAUFVTAB - PNETSTARTD | Outline start of collective network (date) | ||
| 60 | CAUFVTAB - PNETSTARTT | Start time of a collective order | ||
| 61 | CAUFVTAB - PRODNET | Indicator: Order is part of collective order | ||
| 62 | CAUFVTAB - REDKZ | Reduction indicator for scheduling | ||
| 63 | CAUFVTAB - SICHZ | Float after production (in days) | ||
| 64 | CAUFVTAB - TERKZ | Scheduling type | ||
| 65 | CAUFVTAB - TRKZP | Scheduling type (forecast) | ||
| 66 | CAUFVTAB - UPTER | Indicator: Change to Scheduled Dates | ||
| 67 | CAUFVTAB - VORGZ | Float before production (in days) | ||
| 68 | CAUFVTAB - WERKS | Plant | ||
| 69 | COCAUFVINF - INDBT | Field defined as in SY-TABIX | ||
| 70 | COCAUFVINF - MATNR | Material Number for Order | ||
| 71 | COCAUFVINF - TMBAS | Set of dates for network | ||
| 72 | COCAUFVINF - TYPKZ | Type of object causing the load (order category) | ||
| 73 | CXZEIT - FSAV | Earliest operation start date | ||
| 74 | CX_MARC - BASMG | Base quantity | ||
| 75 | CX_MARC - BEARZ | Processing time | ||
| 76 | CX_MARC - DZEIT | In-house production time | ||
| 77 | CX_MARC - FEVOR | Production Supervisor | ||
| 78 | CX_MARC - FHORI | Scheduling Margin Key for Floats | ||
| 79 | CX_MARC - MATNR | Material Number | ||
| 80 | CX_MARC - RUEZT | Setup and teardown time | ||
| 81 | CX_MARC - TRANZ | Interoperation time | ||
| 82 | CX_MARC - WERKS | Plant | ||
| 83 | EMARC - BASMG | Base quantity | ||
| 84 | EMARC - BEARZ | Processing time | ||
| 85 | EMARC - DZEIT | In-house production time | ||
| 86 | EMARC - FEVOR | Production Supervisor | ||
| 87 | EMARC - FHORI | Scheduling Margin Key for Floats | ||
| 88 | EMARC - RUEZT | Setup and teardown time | ||
| 89 | EMARC - TRANZ | Interoperation time | ||
| 90 | EMARC1 - BASMG | Base quantity | ||
| 91 | EMARC1 - BEARZ | Processing time | ||
| 92 | EMARC1 - DZEIT | In-house production time | ||
| 93 | EMARC1 - FEVOR | Production Supervisor | ||
| 94 | EMARC1 - FHORI | Scheduling Margin Key for Floats | ||
| 95 | EMARC1 - RUEZT | Setup and teardown time | ||
| 96 | EMARC1 - TRANZ | Interoperation time | ||
| 97 | KAKO - VERSA | Active version of available capacity | SOURCE VALUE(I_VERSA) LIKE KAKO-VERSA OPTIONAL |
|
| 98 | KAKO - VERSA | Active version of available capacity | ||
| 99 | KBED - TYPKZ | Type of object causing the load (order category) | ||
| 100 | KBEDI - TYPKZ | Type of object causing the load (order category) | ||
| 101 | MARC - BASMG | Base quantity | ||
| 102 | MARC - BEARZ | Processing time | ||
| 103 | MARC - DZEIT | In-house production time | ||
| 104 | MARC - FEVOR | Production Supervisor | ||
| 105 | MARC - FHORI | Scheduling Margin Key for Floats | ||
| 106 | MARC - MATNR | Material Number | ||
| 107 | MARC - RUEZT | Setup and teardown time | ||
| 108 | MARC - TRANZ | Interoperation time | ||
| 109 | MARC - WERKS | Plant | ||
| 110 | MDCPUTIME - EINZT | MRP run: Time for evaluating the operating time | SOURCE VALUE(I_TIME_EINZT) LIKE MDSTATS-EINZT OPTIONAL |
|
| 111 | MDCPUTIME - EINZT | MRP run: Time for evaluating the operating time | ||
| 112 | MDSTATS - EINZT | MRP run: Time for evaluating the operating time | SOURCE VALUE(I_TIME_EINZT) LIKE MDSTATS-EINZT OPTIONAL |
|
| 113 | MDSTATS - EINZT | MRP run: Time for evaluating the operating time | ||
| 114 | PLSC - PLSCN | Planning Scenario of Long-Term Planning | SOURCE REFERENCE(I_PLSCN) LIKE PLSC-PLSCN OPTIONAL |
|
| 115 | PLSC - PLSCN | Planning Scenario of Long-Term Planning | ||
| 116 | RCLST - OBJECT | Data objects of a task list | ||
| 117 | SYST - DATLO | ABAP System Field: Local Date of Current User | ||
| 118 | SYST - DATUM | ABAP System Field: Current Date of Application Server | ||
| 119 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 120 | SYST - TIMLO | ABAP System Field: Local Time of Current User | ||
| 121 | SYST - UZEIT | ABAP System Field: Current Time of Application Server | ||
| 122 | T001W - FABKL | Factory calendar key | ||
| 123 | T006 - MSEHI | Unit of Measurement | ||
| 124 | T482 - ECK_UHRZT | Basic dates with time of day | ||
| 125 | T482 - NTERM | Only calculate capacity requirements | ||
| 126 | T482 - TAGDT | Schedule from current date | ||
| 127 | T482 - VORWT | Forward scheduling | ||
| 128 | TCMF5 - OBJECT_ID | Object ID for Processing Within PPC Error Analysis | ||
| 129 | TCMF6 - APLID | Error Management in the Application | ||
| 130 | TCX00 - STVERG | Maximum number of days start date can be in the past | ||
| 131 | TCX00 - TERMKZ | Scheduling type |