Table/Structure Field list used by SAP ABAP Function Module COMPONENT_DISMANTLE (Equipment Dismantling)
SAP ABAP Function Module
COMPONENT_DISMANTLE (Equipment Dismantling) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | BAL_S_PROF - END_COL | Application Log: Dialog box coordinates | ||
| 2 | BAL_S_PROF - END_ROW | Application Log: Dialog box coordinates | ||
| 3 | BAL_S_PROF - EXP_LEVEL | Application Log: Tree: Expand to level | ||
| 4 | BAL_S_PROF - HEAD_SIZE | Application Log: Tree: Hierarchy column width | ||
| 5 | BAL_S_PROF - HEAD_TEXT | Application Log: Tree: Hierarchy column heading text | ||
| 6 | BAL_S_PROF - LEV1_FCAT | BAL_S_PROF-LEV1_FCAT | ||
| 7 | BAL_S_PROF - LEV1_SORT | BAL_S_PROF-LEV1_SORT | ||
| 8 | BAL_S_PROF - LEV2_FCAT | BAL_S_PROF-LEV2_FCAT | ||
| 9 | BAL_S_PROF - LEV2_SORT | BAL_S_PROF-LEV2_SORT | ||
| 10 | BAL_S_PROF - START_COL | Application Log: Dialog box coordinates | ||
| 11 | BAL_S_PROF - START_ROW | Application Log: Dialog box coordinates | ||
| 12 | BAL_S_PROF - TREE_ADJST | Application Log: Tree: Adjust height if TREE_ONTOP = X | ||
| 13 | BAL_S_PROF - USE_GRID | Application Log: Use grid control for output | ||
| 14 | BAL_S_PROF - BYDETLEVEL | Application log: Construct hierachy by DETLEVEL | ||
| 15 | BAL_S_SCNT - MSG_CNT_A | Application Log: Number of A messages | ||
| 16 | BAL_S_SCNT - MSG_CNT_E | Application Log: Number of E messages | ||
| 17 | BAPI2017_GM_HEAD_RET - DOC_YEAR | Year of material document | ||
| 18 | BAPI2017_GM_HEAD_RET - MAT_DOC | Number of Material Document | ||
| 19 | EQUI - EQUNR | Equipment Number | ||
| 20 | EQUI - MATNR | Material Number | ||
| 21 | EQUI - SERNR | Serial Number | ||
| 22 | IFLO - TPLNR | Functional Location | ||
| 23 | IPW4_COM - CDATE | Date on which installation location of equipment was changed | ||
| 24 | IPW4_COM - UPRMV_IND | Unplanned Dismantling | ||
| 25 | IPW4_COM - SUPPRESS_DIALOG | Checkbox | ||
| 26 | IPW4_COM - QMNUM_CREATED | Message Number | ||
| 27 | IPW4_COM - PLRMV_IND | Planned Dismantling | ||
| 28 | IPW4_COM - NEW_VAL_TYPE | Valuation type | ||
| 29 | IPW4_COM - NEW_BATCH | Batch Number | ||
| 30 | IPW4_COM - MATYEAR_CREATED | Year of material document | ||
| 31 | IPW4_COM - MATDOC_CREATED | Number of Material Document | ||
| 32 | IPW4_COM - CTIME | Time at which the InstallLoc of the equipment was changed | ||
| 33 | IPW4_COM - NEW_BATCH_IND | Indicator: Batch | ||
| 34 | RIQS5 - QMNUM | Message Number | ||
| 35 | SYST - MSGTY | ABAP System Field: Message Type | ||
| 36 | SYST - MSGV4 | ABAP System Field: Message Variable | ||
| 37 | SYST - MSGV3 | ABAP System Field: Message Variable | ||
| 38 | SYST - MSGV2 | ABAP System Field: Message Variable | ||
| 39 | SYST - MSGV1 | ABAP System Field: Message Variable | ||
| 40 | SYST - MSGNO | ABAP System Field: Message Number | ||
| 41 | SYST - MSGID | ABAP System Field: Message ID | ||
| 42 | V_EQUI - EQUNR | Equipment Number | ||
| 43 | V_EQUI - HEQNR | Equipment position at InstallLoc (Superior Equip./FunctLoc) | ||
| 44 | V_EQUI - MATNR | Material Number | ||
| 45 | V_EQUI - SERNR | Serial Number |