Table/Structure Field list used by SAP ABAP Function Module COCF_MD_GET_OPERATIONS (Extractor FM for operations datasource)
SAP ABAP Function Module COCF_MD_GET_OPERATIONS (Extractor FM for operations datasource) is using
# | Object Type | Object Name | Object Description | Note |
---|---|---|---|---|
1 | Table/Structure Field | AFVGD - ARBPL | Work center | |
2 | Table/Structure Field | AFVGD - AUFPL | Routing number of operations in the order | |
3 | Table/Structure Field | AFVGD - FSEDD | Earliest scheduled finish: Execution (date) | |
4 | Table/Structure Field | AFVGD - FSEDZ | Earliest scheduled finish: Execution (time) | |
5 | Table/Structure Field | AFVGD - IEDD | Actual finish: Execution (date) | |
6 | Table/Structure Field | AFVGD - IEDZ | Actual finish: Execution (time) | |
7 | Table/Structure Field | AFVGD - ISDD | Actual start: Execution (date) | |
8 | Table/Structure Field | AFVGD - ISDZ | Actual start: Execution/setup (time) | |
9 | Table/Structure Field | AFVGD - LMNGA | Total Yield Confirmed | |
10 | Table/Structure Field | AFVGD - LTXA1 | Operation short text | |
11 | Table/Structure Field | AFVGD - MEINH | Unit of measure for activity | |
12 | Table/Structure Field | AFVGD - MGVRG | Operation Quantity | |
13 | Table/Structure Field | AFVGD - PEDD | Forecast finish date of operation from confirmation | |
14 | Table/Structure Field | AFVGD - PEDZ | Forecast finish time of operation from confirmation | |
15 | Table/Structure Field | AFVGD - PLNFL | Sequence | |
16 | Table/Structure Field | AFVGD - SSAVD | Latest scheduled start: Execution (date) | |
17 | Table/Structure Field | AFVGD - SSAVZ | Latest scheduled start: Execution (time) | |
18 | Table/Structure Field | AFVGD - SSEDD | Latest scheduled finish: Execution (date) | |
19 | Table/Structure Field | AFVGD - SSEDZ | Latest scheduled finish: Execution (time) | |
20 | Table/Structure Field | AFVGD - VORNR | Operation/Activity Number | |
21 | Table/Structure Field | AFVGD - VSTTXT | System Status | |
22 | Table/Structure Field | AFVGI - LTXA1 | Operation short text | |
23 | Table/Structure Field | AFVGI - PLNFL | Sequence | |
24 | Table/Structure Field | AFVGI - VORNR | Operation/Activity Number | |
25 | Table/Structure Field | AFVKI - AUFPL | Routing number of operations in the order | |
26 | Table/Structure Field | AFVVI - FSEDD | Earliest scheduled finish: Execution (date) | |
27 | Table/Structure Field | AFVVI - FSEDZ | Earliest scheduled finish: Execution (time) | |
28 | Table/Structure Field | AFVVI - IEDD | Actual finish: Execution (date) | |
29 | Table/Structure Field | AFVVI - IEDZ | Actual finish: Execution (time) | |
30 | Table/Structure Field | AFVVI - ISDD | Actual start: Execution (date) | |
31 | Table/Structure Field | AFVVI - ISDZ | Actual start: Execution/setup (time) | |
32 | Table/Structure Field | AFVVI - LMNGA | Total Yield Confirmed | |
33 | Table/Structure Field | AFVVI - MEINH | Unit of measure for activity | |
34 | Table/Structure Field | AFVVI - MGVRG | Operation Quantity | |
35 | Table/Structure Field | AFVVI - PEDD | Forecast finish date of operation from confirmation | |
36 | Table/Structure Field | AFVVI - PEDZ | Forecast finish time of operation from confirmation | |
37 | Table/Structure Field | AFVVI - SSAVD | Latest scheduled start: Execution (date) | |
38 | Table/Structure Field | AFVVI - SSAVZ | Latest scheduled start: Execution (time) | |
39 | Table/Structure Field | AFVVI - SSEDD | Latest scheduled finish: Execution (date) | |
40 | Table/Structure Field | AFVVI - SSEDZ | Latest scheduled finish: Execution (time) | |
41 | Table/Structure Field | COCF_MD_ADM_SYST - APPLID | Application ID for Manufacturing Dashboard | |
42 | Table/Structure Field | COCF_MD_S_DATE_RANGE - FROM_DATE | (8-character) Date for SYST | |
43 | Table/Structure Field | COCF_MD_S_DATE_RANGE - NAME | Char 15 | |
44 | Table/Structure Field | COCF_MD_S_DATE_RANGE - TO_DATE | (8-character) Date for SYST | |
45 | Table/Structure Field | COCF_MD_S_OPR - ACT_FIN_DATE | Actual finish: Execution (date) | |
46 | Table/Structure Field | COCF_MD_S_OPR - ACT_FIN_TIME | Actual finish: Execution (time) | |
47 | Table/Structure Field | COCF_MD_S_OPR - ACT_OP_UOM | Unit of measure for activity | |
48 | Table/Structure Field | COCF_MD_S_OPR - ACT_STRT_DATE | Actual start: Execution (date) | |
49 | Table/Structure Field | COCF_MD_S_OPR - ACT_STRT_TIME | Actual start: Execution/setup (time) | |
50 | Table/Structure Field | COCF_MD_S_OPR - APPLICATION_ID | Application ID for Manufacturing Dashboard | |
51 | Table/Structure Field | COCF_MD_S_OPR - COMPONENT_NM | R/2 table | |
52 | Table/Structure Field | COCF_MD_S_OPR - CONF_IND | Single-Character Flag | |
53 | Table/Structure Field | COCF_MD_S_OPR - HEADER_MATERIAL | Material Number | |
54 | Table/Structure Field | COCF_MD_S_OPR - HEADER_MAT_DESC | Material description | |
55 | Table/Structure Field | COCF_MD_S_OPR - LATE_OPER_IND | Single-Character Flag | |
56 | Table/Structure Field | COCF_MD_S_OPR - MACH_AVAIL_IND | Single-Character Flag | |
57 | Table/Structure Field | COCF_MD_S_OPR - MAT_AVAIL_IND | Single-Character Flag | |
58 | Table/Structure Field | COCF_MD_S_OPR - MAT_AVAIL_STAT | Character field of 9 digits | |
59 | Table/Structure Field | COCF_MD_S_OPR - ONTIME_CONF_IND | Single-Character Flag | |
60 | Table/Structure Field | COCF_MD_S_OPR - OPERATION_DESC | Operation short text | |
61 | Table/Structure Field | COCF_MD_S_OPR - OPERATION_NUMBER | Operation/Activity Number | |
62 | Table/Structure Field | COCF_MD_S_OPR - OPER_SYS_STATUS | System Status | |
63 | Table/Structure Field | COCF_MD_S_OPR - OPER_USER_STATUS | Field displaying user status | |
64 | Table/Structure Field | COCF_MD_S_OPR - ORDER_NUMBER | Order Number | |
65 | Table/Structure Field | COCF_MD_S_OPR - PRED_IND | Single-Character Flag | |
66 | Table/Structure Field | COCF_MD_S_OPR - QUANTITY | Operation Quantity | |
67 | Table/Structure Field | COCF_MD_S_OPR - REFRESH_IND | Single-Character Flag | |
68 | Table/Structure Field | COCF_MD_S_OPR - ROUTING_NUMBER | Routing number of operations in the order | |
69 | Table/Structure Field | COCF_MD_S_OPR - SCHD_ELY_FI_DT | Earliest scheduled finish: Execution (date) | |
70 | Table/Structure Field | COCF_MD_S_OPR - SCHD_ELY_FI_TI | Earliest scheduled finish: Execution (time) | |
71 | Table/Structure Field | COCF_MD_S_OPR - SCHD_LTE_FI_DT | Latest scheduled finish: Execution (date) | |
72 | Table/Structure Field | COCF_MD_S_OPR - SCHD_LTE_FI_TI | Latest scheduled finish: Execution (time) | |
73 | Table/Structure Field | COCF_MD_S_OPR - SCHD_LTE_STR_DT | Latest scheduled start: Execution (date) | |
74 | Table/Structure Field | COCF_MD_S_OPR - SCHD_LTE_STR_TI | Latest scheduled start: Execution (time) | |
75 | Table/Structure Field | COCF_MD_S_OPR - SEQUENCE_NUMBER | Sequence | |
76 | Table/Structure Field | COCF_MD_S_OPR - STATUS | Single-Character Flag | |
77 | Table/Structure Field | COCF_MD_S_OPR - SUCC_IND | Single-Character Flag | |
78 | Table/Structure Field | COCF_MD_S_OPR - SYS_STAT_DESC | System Status Description for Manufacturing Dashboard | |
79 | Table/Structure Field | COCF_MD_S_OPR - TIME_BUCKET1 | Char 20 | |
80 | Table/Structure Field | COCF_MD_S_OPR - TIME_BUCKET2 | Char 20 | |
81 | Table/Structure Field | COCF_MD_S_OPR - TIME_BUCKET3 | Char 20 | |
82 | Table/Structure Field | COCF_MD_S_OPR - TIME_BUCKET4 | Char 20 | |
83 | Table/Structure Field | COCF_MD_S_OPR - TIME_BUCKET5 | Char 20 | |
84 | Table/Structure Field | COCF_MD_S_OPR - TIME_BUCKET6 | Char 20 | |
85 | Table/Structure Field | COCF_MD_S_OPR - TIME_BUCKET7 | Char 20 | |
86 | Table/Structure Field | COCF_MD_S_OPR - TIME_BUCKET8 | Char 20 | |
87 | Table/Structure Field | COCF_MD_S_OPR - TOOL_AVAIL_IND | Single-Character Flag | |
88 | Table/Structure Field | COCF_MD_S_OPR - VARIANT_ID | Selection variant | |
89 | Table/Structure Field | COCF_MD_S_OPR - WORK_CENTER | Work center | |
90 | Table/Structure Field | COCF_MD_S_OPR - WORK_CENTER_DESC | Work center description | |
91 | Table/Structure Field | COCF_MD_S_OPR - YIELD | Total Yield Confirmed | |
92 | Table/Structure Field | COCF_MD_TIM_BUKT - APPLID | Application ID for Manufacturing Dashboard | |
93 | Table/Structure Field | COCF_MD_TIM_BUKT - DURATION_FROM | Natural number | |
94 | Table/Structure Field | COCF_MD_TIM_BUKT - DURATION_TO | Natural number | |
95 | Table/Structure Field | COCF_MD_TIM_BUKT - TAB_NAME | Tab Number for Time Bucket | |
96 | Table/Structure Field | COCF_MD_TIM_BUKT - TIME_BUCK_NAME | Time bucket | |
97 | Table/Structure Field | COOPRINF - ARBPL | Work center | |
98 | Table/Structure Field | COOPRINF - VSTTXT | System Status | |
99 | Table/Structure Field | IOOPER - ARBPL | Work center | |
100 | Table/Structure Field | IOOPER - ARBTX | Work center description | |
101 | Table/Structure Field | IOOPER - ASTTX | Field displaying user status | |
102 | Table/Structure Field | IOOPER - AUFNR | Order Number | |
103 | Table/Structure Field | IOOPER - AUFPL | Routing number of operations in the order | |
104 | Table/Structure Field | IOOPER - FSEDD | Earliest scheduled finish: Execution (date) | |
105 | Table/Structure Field | IOOPER - FSEDZ | Earliest scheduled finish: Execution (time) | |
106 | Table/Structure Field | IOOPER - IEDD | Actual finish: Execution (date) | |
107 | Table/Structure Field | IOOPER - IEDZ | Actual finish: Execution (time) | |
108 | Table/Structure Field | IOOPER - ISDD | Actual start: Execution (date) | |
109 | Table/Structure Field | IOOPER - ISDZ | Actual start: Execution/setup (time) | |
110 | Table/Structure Field | IOOPER - LMNGA | Total Yield Confirmed | |
111 | Table/Structure Field | IOOPER - LTXA1 | Operation short text | |
112 | Table/Structure Field | IOOPER - MEINH | Unit of measure for activity | |
113 | Table/Structure Field | IOOPER - MGVRG | Operation Quantity | |
114 | Table/Structure Field | IOOPER - PEDD | Forecast finish date of operation from confirmation | |
115 | Table/Structure Field | IOOPER - PEDZ | Forecast finish time of operation from confirmation | |
116 | Table/Structure Field | IOOPER - PLNFL | Sequence | |
117 | Table/Structure Field | IOOPER - SSAVD | Latest scheduled start: Execution (date) | |
118 | Table/Structure Field | IOOPER - SSAVZ | Latest scheduled start: Execution (time) | |
119 | Table/Structure Field | IOOPER - SSEDD | Latest scheduled finish: Execution (date) | |
120 | Table/Structure Field | IOOPER - SSEDZ | Latest scheduled finish: Execution (time) | |
121 | Table/Structure Field | IOOPER - VORNR | Operation/Activity Number | |
122 | Table/Structure Field | IOOPER - VSTTXT | System Status | |
123 | Table/Structure Field | RMAN_PRSP_OPER_ADD_FIELDS - MACHINE_BREAKDOWN | Machine Breakdown Indicator | |
124 | Table/Structure Field | RMAN_PRSP_OPER_ADD_FIELDS - MATNR | Material Number | |
125 | Table/Structure Field | RMAN_PRSP_OPER_ADD_FIELDS - MATXT | Material description | |
126 | Table/Structure Field | RMAN_PRSP_OPER_ADD_FIELDS - MAT_SHORTAGE | Material Shortage | |
127 | Table/Structure Field | RMAN_PRSP_OPER_ADD_FIELDS - SYS_STAT_DESC | Character Field of Length 12 | |
128 | Table/Structure Field | RMAN_PRSP_OPER_ADD_FIELDS - TOOLS_PROBLEM | Tools Problem | |
129 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - ARBPL | Work center | |
130 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - ARBTX | Work center description | |
131 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - ASTTX | Field displaying user status | |
132 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - AUFNR | Order Number | |
133 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - AUFPL | Routing number of operations in the order | |
134 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - FSEDD | Earliest scheduled finish: Execution (date) | |
135 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - FSEDZ | Earliest scheduled finish: Execution (time) | |
136 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - IEDD | Actual finish: Execution (date) | |
137 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - IEDZ | Actual finish: Execution (time) | |
138 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - ISDD | Actual start: Execution (date) | |
139 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - ISDZ | Actual start: Execution/setup (time) | |
140 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - LMNGA | Total Yield Confirmed | |
141 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - LTXA1 | Operation short text | |
142 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - MACHINE_BREAKDOWN | Machine Breakdown Indicator | |
143 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - MATNR | Material Number | |
144 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - MATXT | Material description | |
145 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - MAT_PROBL_TAB | RMAN_PRSP_OPER_LIST_TYPE_ST-MAT_PROBL_TAB | |
146 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - MAT_SHORTAGE | Material Shortage | |
147 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - MEINH | Unit of measure for activity | |
148 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - MGVRG | Operation Quantity | |
149 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - PEDD | Forecast finish date of operation from confirmation | |
150 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - PEDZ | Forecast finish time of operation from confirmation | |
151 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - PLNFL | Sequence | |
152 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - PREDEC_PROBLEM_TAB | RMAN_PRSP_OPER_LIST_TYPE_ST-PREDEC_PROBLEM_TAB | |
153 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - PRESUC_TAB | RMAN_PRSP_OPER_LIST_TYPE_ST-PRESUC_TAB | |
154 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - SSAVD | Latest scheduled start: Execution (date) | |
155 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - SSAVZ | Latest scheduled start: Execution (time) | |
156 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - SSEDD | Latest scheduled finish: Execution (date) | |
157 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - SSEDZ | Latest scheduled finish: Execution (time) | |
158 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - SUCC_PROBLEM_TAB | RMAN_PRSP_OPER_LIST_TYPE_ST-SUCC_PROBLEM_TAB | |
159 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - SYS_STAT_DESC | Character Field of Length 12 | |
160 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - TOOLS_PROBLEM | Tools Problem | |
161 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - TOOLS_PROBLEM_TAB | RMAN_PRSP_OPER_LIST_TYPE_ST-TOOLS_PROBLEM_TAB | |
162 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - VORNR | Operation/Activity Number | |
163 | Table/Structure Field | RMAN_PRSP_OPER_LIST_TYPE_ST - VSTTXT | System Status | |
164 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - ARBPL | Work center | |
165 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - ARBTX | Work center description | |
166 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - ASTTX | Field displaying user status | |
167 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - AUFNR | Order Number | |
168 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - AUFPL | Routing number of operations in the order | |
169 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - FSEDD | Earliest scheduled finish: Execution (date) | |
170 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - FSEDZ | Earliest scheduled finish: Execution (time) | |
171 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - IEDD | Actual finish: Execution (date) | |
172 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - IEDZ | Actual finish: Execution (time) | |
173 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - ISDD | Actual start: Execution (date) | |
174 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - ISDZ | Actual start: Execution/setup (time) | |
175 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - LMNGA | Total Yield Confirmed | |
176 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - LTXA1 | Operation short text | |
177 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - MEINH | Unit of measure for activity | |
178 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - MGVRG | Operation Quantity | |
179 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - PEDD | Forecast finish date of operation from confirmation | |
180 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - PEDZ | Forecast finish time of operation from confirmation | |
181 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - PLNFL | Sequence | |
182 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - SSAVD | Latest scheduled start: Execution (date) | |
183 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - SSAVZ | Latest scheduled start: Execution (time) | |
184 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - SSEDD | Latest scheduled finish: Execution (date) | |
185 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - SSEDZ | Latest scheduled finish: Execution (time) | |
186 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - VORNR | Operation/Activity Number | |
187 | Table/Structure Field | RMAN_PRSP_OPR_STANDARD_ST - VSTTXT | System Status | |
188 | Table/Structure Field | RMAN_PRSP_PRESUC_POWL_ST - PRESUC | Identification of Predecessor/Successor | |
189 | Table/Structure Field | RMAN_PRSP_PROBLEM_DETAILS_ST - STATUS_ICON | Comments on runtime measurement | |
190 | Table/Structure Field | RSAAPI_IF - DATAPAKID | Data packet number | |
191 | Table/Structure Field | RSAAPI_IF - INITFLAG | Flag: Callup of the extraction APIs for initialization | |
192 | Table/Structure Field | RSAAPI_IF - ISOURCE | InfoSource | |
193 | Table/Structure Field | RSAAPI_IF - REQUNR | Request number for the data transfer | |
194 | Table/Structure Field | RSAAPI_IF - UPDMODE | Mode of data update (Full, Delta, etc.) | |
195 | Table/Structure Field | RSEXSCRN - EXIT_NAME | Business Add-in Definition | |
196 | Table/Structure Field | RSLOGPARMS - MSGID | Message Class | |
197 | Table/Structure Field | RSLOGPARMS - MSGNO | Message Number | |
198 | Table/Structure Field | RSLOGPARMS - MSGTY | Message Type | |
199 | Table/Structure Field | RSLOGPARMS - MSGV1 | Message Variable | |
200 | Table/Structure Field | RSLOGPARMS - MSGV2 | Message Variable | |
201 | Table/Structure Field | RSPARAMS - HIGH | ABAP/4: Selection value (LOW or HIGH value, external format) | |
202 | Table/Structure Field | RSPARAMS - LOW | ABAP/4: Selection value (LOW or HIGH value, external format) | |
203 | Table/Structure Field | RSPARAMS - SELNAME | ABAP/4: Name of SELECT-OPTION / PARAMETER | |
204 | Table/Structure Field | RSSELECT - FIELDNM | Field name | |
205 | Table/Structure Field | RSSELECT - LOW | Selection criteria: From value | |
206 | Table/Structure Field | RSVAR - REPORT | Report Name | |
207 | Table/Structure Field | SYST - DATUM | ABAP System Field: Current Date of Application Server | |
208 | Table/Structure Field | SYST - UZEIT | ABAP System Field: Current Time of Application Server |