Table/Structure Field list used by SAP ABAP Function Module CO_ZF_ORDER_SCHEDULE (Terminieren des Fertigungsauftrages)
SAP ABAP Function Module
CO_ZF_ORDER_SCHEDULE (Terminieren des Fertigungsauftrages) is using
pages: 1 2
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AFKO - AUFNR | Order Number | ||
| 2 | AFKO - RSNUM | Number of reservation/dependent requirements | ||
| 3 | AFKO_INC - RSNUM | Number of reservation/dependent requirements | ||
| 4 | AFPO - MATNR | Material Number for Order | ||
| 5 | AFPO - PLNUM | Planned order number | ||
| 6 | AFPO - POSNR | Order item number | ||
| 7 | AFPO - PROJN | Work breakdown structure element (WBS element) | ||
| 8 | AFPO - PSOBS | Special procurement type | ||
| 9 | AFPO - PWERK | Planning plant for the order | ||
| 10 | AFPO - QUNUM | Number of quota arrangement | ||
| 11 | AFPO - QUPOS | Quota arrangement item | ||
| 12 | AFPO - UMREN | Denominator for conversion to base units of measure | ||
| 13 | AFPO - UMREZ | Numerator for Conversion to Base Units of Measure | ||
| 14 | AFPO - VERID | Production Version | ||
| 15 | AFPOD - MATNR | Material Number for Order | ||
| 16 | AFPOD - PLNUM | Planned order number | ||
| 17 | AFPOD - PROJN | Work breakdown structure element (WBS element) | ||
| 18 | AFPOD - PSOBS | Special procurement type | ||
| 19 | AFPOD - PWERK | Planning plant for the order | ||
| 20 | AFPOD - QUNUM | Number of quota arrangement | ||
| 21 | AFPOD - QUPOS | Quota arrangement item | ||
| 22 | AFPOD - UMREN | Denominator for conversion to base units of measure | ||
| 23 | AFPOD - UMREZ | Numerator for Conversion to Base Units of Measure | ||
| 24 | AFPOD - USEQU | Quota arrangement usage | ||
| 25 | AFPOD - VERID | Production Version | ||
| 26 | AFPO_INC - MATNR | Material Number for Order | ||
| 27 | AFPO_INC - PLNUM | Planned order number | ||
| 28 | AFPO_INC - PROJN | Work breakdown structure element (WBS element) | ||
| 29 | AFPO_INC - PSOBS | Special procurement type | ||
| 30 | AFPO_INC - PWERK | Planning plant for the order | ||
| 31 | AFPO_INC - QUNUM | Number of quota arrangement | ||
| 32 | AFPO_INC - QUPOS | Quota arrangement item | ||
| 33 | AFPO_INC - UMREN | Denominator for conversion to base units of measure | ||
| 34 | AFPO_INC - UMREZ | Numerator for Conversion to Base Units of Measure | ||
| 35 | AFPO_INC - VERID | Production Version | ||
| 36 | AUFK - AUFNR | Order Number | ||
| 37 | CAUFVD - AUART | Order Type | ||
| 38 | CAUFVD - AUFNR | Order Number | SOURCE VALUE(AUFNR_ACT_IMP) LIKE CAUFVD-AUFNR DEFAULT SPACE |
|
| 39 | CAUFVD - AUFNR | Order Number | ||
| 40 | CAUFVD - AUTERM | Indicator: Schedule automatically | ||
| 41 | CAUFVD - AUTYP | Order category | ||
| 42 | CAUFVD - AUTYP | Order category | SOURCE VALUE(I_AUTYP_TO_SCHEDULE) LIKE CAUFVD-AUTYP DEFAULT SPACE |
|
| 43 | CAUFVD - FEVOR | Production Supervisor | ||
| 44 | CAUFVD - FLG_CALC | Indicator: Order (network etc.) still to be calculated | ||
| 45 | CAUFVD - FLG_TRME | Indicator: Scheduling is carried out at least once | ||
| 46 | CAUFVD - FTRMS | Scheduled release date | ||
| 47 | CAUFVD - GAMNG | Total order quantity | ||
| 48 | CAUFVD - GLTRP | Basic finish date | ||
| 49 | CAUFVD - GLTRS | Scheduled finish | ||
| 50 | CAUFVD - GLUZP | Basic finish (time) | ||
| 51 | CAUFVD - GROID | ID of the capacity requirements record | ||
| 52 | CAUFVD - GSTRP | Basic start date | ||
| 53 | CAUFVD - GSTRS | Scheduled start | ||
| 54 | CAUFVD - GSUZP | Basic start time | ||
| 55 | CAUFVD - KBED | Ind: do not create capacity requirements | ||
| 56 | CAUFVD - KDAUF_AUFK | Sales Order Number | ||
| 57 | CAUFVD - MATNR | Material Number for Order | ||
| 58 | CAUFVD - NAUTERM | Indicator: Do not schedule automatically | ||
| 59 | CAUFVD - OBJNR | Object number | ||
| 60 | CAUFVD - PRODNET | Indicator: Order is part of collective order | ||
| 61 | CAUFVD - PROJN | Work Breakdown Structure Element (WBS Element) | ||
| 62 | CAUFVD - RATID | ID of the capacity requirements record | ||
| 63 | CAUFVD - RSNUM | Number of reservation/dependent requirements | ||
| 64 | CAUFVD - TERKZ | Scheduling type | ||
| 65 | CAUFVD - TMBAS | Set of dates for network | ||
| 66 | CAUFVD - VSNMR | Number or description of a version | ||
| 67 | CAUFVD - WERKS | Plant | ||
| 68 | CAUFVDB - GAMNG | Total order quantity | ||
| 69 | CAUFVDB - GLTRP | Basic finish date | ||
| 70 | CAUFVDB - GLUZP | Basic finish (time) | ||
| 71 | CAUFVDB - GSTRP | Basic start date | ||
| 72 | CAUFVDB - GSUZP | Basic start time | ||
| 73 | CAUFVTAB - AUART | Order Type | ||
| 74 | CAUFVTAB - AUFNR | Order Number | SOURCE VALUE(AUFNR_ACT_IMP) LIKE CAUFVD-AUFNR DEFAULT SPACE |
|
| 75 | CAUFVTAB - AUFNR | Order Number | ||
| 76 | CAUFVTAB - AUTYP | Order category | ||
| 77 | CAUFVTAB - AUTYP | Order category | SOURCE VALUE(I_AUTYP_TO_SCHEDULE) LIKE CAUFVD-AUTYP DEFAULT SPACE |
|
| 78 | CAUFVTAB - FEVOR | Production Supervisor | ||
| 79 | CAUFVTAB - FTRMS | Scheduled release date | ||
| 80 | CAUFVTAB - GAMNG | Total order quantity | ||
| 81 | CAUFVTAB - GLTRP | Basic finish date | ||
| 82 | CAUFVTAB - GLTRS | Scheduled finish | ||
| 83 | CAUFVTAB - GLUZP | Basic finish (time) | ||
| 84 | CAUFVTAB - GROID | ID of the capacity requirements record | ||
| 85 | CAUFVTAB - GSTRP | Basic start date | ||
| 86 | CAUFVTAB - GSTRS | Scheduled start | ||
| 87 | CAUFVTAB - GSUZP | Basic start time | ||
| 88 | CAUFVTAB - KBED | Ind: do not create capacity requirements | ||
| 89 | CAUFVTAB - KDAUF_AUFK | Sales Order Number | ||
| 90 | CAUFVTAB - NAUTERM | Indicator: Do not schedule automatically | ||
| 91 | CAUFVTAB - OBJNR | Object number | ||
| 92 | CAUFVTAB - PRODNET | Indicator: Order is part of collective order | ||
| 93 | CAUFVTAB - RATID | ID of the capacity requirements record | ||
| 94 | CAUFVTAB - RSNUM | Number of reservation/dependent requirements | ||
| 95 | CAUFVTAB - TERKZ | Scheduling type | ||
| 96 | CAUFVTAB - WERKS | Plant | ||
| 97 | CMFMSG - ARBGB | Application Area | ||
| 98 | CMFMSG - MSGNR | Message number | ||
| 99 | COAFPOINF - USEQU | Quota arrangement usage | ||
| 100 | COCAUFVINF - AUTERM | Indicator: Schedule automatically | ||
| 101 | COCAUFVINF - FLG_CALC | Indicator: Order (network etc.) still to be calculated | ||
| 102 | COCAUFVINF - FLG_TRME | Indicator: Scheduling is carried out at least once | ||
| 103 | COCAUFVINF - MATNR | Material Number for Order | ||
| 104 | COCAUFVINF - PROJN | Work Breakdown Structure Element (WBS Element) | ||
| 105 | COCAUFVINF - TMBAS | Set of dates for network | ||
| 106 | CORESBINF - SBDKZ | Dependent requirements ind. for individual and coll. reqmts | ||
| 107 | COVERSINF - VSNMR | Number or description of a version | ||
| 108 | CX_MARC - MATNR | Material Number | ||
| 109 | CX_MARC - WERKS | Plant | ||
| 110 | JEST - STAT | Object status | ||
| 111 | KBED - TYPKZ | Type of object causing the load (order category) | ||
| 112 | KBEDI - TYPKZ | Type of object causing the load (order category) | ||
| 113 | MDPM - AENNR | Change Number | ||
| 114 | MDPM - ALPGR | Alternative Item: Group | ||
| 115 | MDPM - ALPRF | Alternative Item: Ranking Order | ||
| 116 | MDPM - ALPST | Alternative Item: Strategy | ||
| 117 | MDPM - ALTPS | Alternative item indicator | ||
| 118 | MDPM - APLZL | General counter for order | ||
| 119 | MDPM - AUFST | Order level | ||
| 120 | MDPM - AUFWG | Order path | ||
| 121 | MDPM - AVOAS | Operation Scrap | ||
| 122 | MDPM - AVONT | Indicator: Net Scrap | ||
| 123 | MDPM - BAUGR | Material number of higher-level assembly | ||
| 124 | MDPM - BAUST | Assembly order level | ||
| 125 | MDPM - BAUWG | Assembly order path | ||
| 126 | MDPM - BDART | Requirement type | ||
| 127 | MDPM - BDMNG | Requirement Quantity | ||
| 128 | MDPM - BDTER | Requirements date for the component | ||
| 129 | MDPM - BEIKZ | Material Provision Indicators | ||
| 130 | MDPM - CLAKZ | Indicator: classification exists | ||
| 131 | MDPM - CUOBJ | Configuration (internal object number) | ||
| 132 | MDPM - DBSKZ | Direct procurement indicator | ||
| 133 | MDPM - DUMPS | Phantom item indicator | ||
| 134 | MDPM - ENMNG | Quantity withdrawn | ||
| 135 | MDPM - EPOSN | BOM Item Number | ||
| 136 | MDPM - ERFME | Unit of entry | ||
| 137 | MDPM - ERFMG | Requirement quantity of the component | ||
| 138 | MDPM - ERSKZ | Indicator: Spare Part | ||
| 139 | MDPM - ESMNG | Usage quantity per order unit of measure | ||
| 140 | MDPM - EWAHR | Usage Probability in % (Alternative Item) | ||
| 141 | MDPM - FMENG | Quantity is fixed | ||
| 142 | MDPM - INPOS | Indicator: intra material | ||
| 143 | MDPM - KFPOS | Indicator: "configurable item" | ||
| 144 | MDPM - KMPAS | Component scrap in percent | ||
| 145 | MDPM - KMPKA | Indicator for Relevancy to Costing | ||
| 146 | MDPM - KNTTP | Account assignment category | ||
| 147 | MDPM - KZAUS | Discontinuation type | ||
| 148 | MDPM - KZBWS | Valuation of Special Stock | ||
| 149 | MDPM - KZEAR | Final issue for this reservation | ||
| 150 | MDPM - KZKUP | Indicator: Co-Product | ||
| 151 | MDPM - KZVBR | Consumption posting | ||
| 152 | MDPM - LAGME | Base Unit of Measure | ||
| 153 | MDPM - LGPRO | Issue storage location | ||
| 154 | MDPM - LIFNR | Account Number of Vendor or Creditor | ||
| 155 | MDPM - MATNR | Material Number | ||
| 156 | MDPM - NAFKZ | Indicator: follow-up material active/not active | ||
| 157 | MDPM - NFEAG | Discontinuation Group | ||
| 158 | MDPM - NFGRP | Follow-Up Group | ||
| 159 | MDPM - NFMAT | Follow-up material | ||
| 160 | MDPM - NFPKZ | Indicator: Follow-Up Item | ||
| 161 | MDPM - NLFMV | Unit for lead-time offset for operation | ||
| 162 | MDPM - NLFZT | Lead-Time Offset | ||
| 163 | MDPM - NLFZV | Lead-time offset for operation | ||
| 164 | MDPM - NOMNG | Required quantity | ||
| 165 | MDPM - POSNR | BOM Item Number | ||
| 166 | MDPM - POSTP | Item category (bill of material) | ||
| 167 | MDPM - PRVBE | Production Supply Area | ||
| 168 | MDPM - REVLV | Revision level | ||
| 169 | MDPM - RFORM | Formula Key | ||
| 170 | MDPM - ROANZ | Number of Variable-Size Items | ||
| 171 | MDPM - ROHPS | Variable-sized item indicator | ||
| 172 | MDPM - ROMEI | Unit of measure for sizes 1 to 3 | ||
| 173 | MDPM - ROMNG | VarSizeItem Qty | ||
| 174 | MDPM - ROMS1 | Size 1 | ||
| 175 | MDPM - ROMS2 | Size 2 | ||
| 176 | MDPM - ROMS3 | Size 3 | ||
| 177 | MDPM - RSART | Record type | ||
| 178 | MDPM - RSNUM | Number of reservation/dependent requirements | ||
| 179 | MDPM - RSPOS | Item Number of Reservation / Dependent Requirements | ||
| 180 | MDPM - SAKTO | Cost Element | ||
| 181 | MDPM - SBDKZ | Dependent requirements ind. for individual and coll. reqmts | ||
| 182 | MDPM - SBTER | Latest requirements date | ||
| 183 | MDPM - SERNR | BOM explosion number | ||
| 184 | MDPM - SGTPS | Bulk material indicator | ||
| 185 | MDPM - SGTX1 | Text, length 40 | ||
| 186 | MDPM - SGTX2 | Text, length 40 | ||
| 187 | MDPM - SHKZG | Debit/Credit Indicator | ||
| 188 | MDPM - SOBKZ | Special Stock Indicator | ||
| 189 | MDPM - STALT | Alternative BOM | ||
| 190 | MDPM - STKNR | BOM Item Node Number | ||
| 191 | MDPM - STKZA | Internal counter | ||
| 192 | MDPM - STLNR | Bill of Material | ||
| 193 | MDPM - STLTX | Language: The long text was stored in this language | ||
| 194 | MDPM - STLTY | BOM Category | ||
| 195 | MDPM - STSOR | Sort String | ||
| 196 | MDPM - STVKN | Inherited Node Number of BOM Item | ||
| 197 | MDPM - TECHS | Parameter Variant/Standard Variant | ||
| 198 | MDPM - TXTPS | Item text indicator | ||
| 199 | MDPM - UMREN | Denominator for conversion to base units of measure | ||
| 200 | MDPM - UMREZ | Numerator for Conversion to Base Units of Measure | ||
| 201 | MDPM - UPSKZ | Indicator: Subitems Exist | ||
| 202 | MDPM - VERTI | Distribution key for component consumption | ||
| 203 | MDPM - VMENG | Confirmed quantity for availability check in SKU | ||
| 204 | MDPM - VRPLA | Indicator: planning without final assembly | ||
| 205 | MDPM - WERKS | Plant | ||
| 206 | MDPM - XPOSN | BOM Item Number | ||
| 207 | MTCOM - KENNG | View ID | ||
| 208 | MTCOM - MATNR | Material Number | ||
| 209 | MTCOM - SPRAS | Language Key | ||
| 210 | MTCOM - WERKS | Plant | ||
| 211 | ORD_PRE - AUFNR | Order Number | ||
| 212 | RC27X - FLG_SEL | Selection indicator | SOURCE VALUE(ALWAYS_SCHEDULE) LIKE RC27X-FLG_SEL DEFAULT SPACE |
|
| 213 | RC27X - FLG_SEL | Selection indicator | ||
| 214 | RC27X - FLG_SEL | Selection indicator | SOURCE VALUE(OVERALL_NETW_IMP) LIKE RC27X-FLG_SEL DEFAULT SPACE |
|
| 215 | RC27X - FLG_SEL | Selection indicator | SOURCE VALUE(ONLY_QUANTITIES) LIKE RC27X-FLG_SEL DEFAULT SPACE |
|
| 216 | RC27X - FLG_SEL | Selection indicator | SOURCE VALUE(ONLY_CAPACITIES) LIKE RC27X-FLG_SEL DEFAULT SPACE |
|
| 217 | RC27X - FLG_SEL | Selection indicator | SOURCE VALUE(NO_QUOTA) LIKE RC27X-FLG_SEL DEFAULT SPACE |
|
| 218 | RC27X - FLG_SEL | Selection indicator | SOURCE VALUE(NO_GUI_MESSAGE) LIKE RC27X-FLG_SEL DEFAULT SPACE |
|
| 219 | RC27X - FLG_SEL | Selection indicator | SOURCE VALUE(FLG_SCHED_CANCEL) LIKE RC27X-FLG_SEL |
|
| 220 | RC27X - FLG_SEL | Selection indicator | SOURCE VALUE(FLG_PROTOCOL) LIKE RC27X-FLG_SEL |
|
| 221 | RC27X - FLG_SEL | Selection indicator | SOURCE VALUE(FLG_POST) LIKE RC27X-FLG_SEL DEFAULT SPACE |
|
| 222 | RC27X - FLG_SEL | Selection indicator | SOURCE VALUE(FLG_MESSAGE) LIKE RC27X-FLG_SEL |
|
| 223 | RC27X - FLG_SEL | Selection indicator | SOURCE VALUE(FLG_DATES_DET) LIKE RC27X-FLG_SEL DEFAULT SPACE |
|
| 224 | RC27X - FLG_SEL | Selection indicator | SOURCE VALUE(FLG_CHECK_DISP) LIKE RC27X-FLG_SEL DEFAULT SPACE |
|
| 225 | RCOTNR - RSNUM | Number of reservation/dependent requirements | ||
| 226 | RESB - AENNR | Change Number | ||
| 227 | RESB - ALPGR | Alternative Item: Group | ||
| 228 | RESB - ALPOS | Alternative item indicator | ||
| 229 | RESB - ALPRF | Alternative Item: Ranking Order | ||
| 230 | RESB - ALPST | Alternative Item: Strategy | ||
| 231 | RESB - APLZL | Internal counter | ||
| 232 | RESB - AUFST | Order level | ||
| 233 | RESB - AUFWG | Order path | ||
| 234 | RESB - AUSCH | Component scrap in percent | ||
| 235 | RESB - AVOAU | Operation Scrap | ||
| 236 | RESB - BAUGR | Material number of higher-level assembly | ||
| 237 | RESB - BAUST | Assembly order level | ||
| 238 | RESB - BAUWG | Assembly order path | ||
| 239 | RESB - BDART | Requirement type | ||
| 240 | RESB - BDMNG | Requirement Quantity | ||
| 241 | RESB - BDTER | Requirements date for the component | ||
| 242 | RESB - BEIKZ | Material Provision Indicators | ||
| 243 | RESB - CLAKZ | Indicator: classification exists | ||
| 244 | RESB - CUOBJ | Configuration (internal object number) | ||
| 245 | RESB - DBSKZ | Direct procurement indicator | ||
| 246 | RESB - DUMPS | Phantom item indicator | ||
| 247 | RESB - ENMNG | Quantity withdrawn | ||
| 248 | RESB - ERFME | Unit of entry | ||
| 249 | RESB - ERFMG | Quantity in unit of entry | ||
| 250 | RESB - ERSKZ | Indicator: Spare Part | ||
| 251 | RESB - ESMNG | Usage quantity per order unit of measure | ||
| 252 | RESB - EWAHR | Usage Probability in % (Alternative Item) | ||
| 253 | RESB - FMENG | Quantity is fixed | ||
| 254 | RESB - INPOS | Indicator: intra material | ||
| 255 | RESB - KFPOS | Indicator: "configurable item" | ||
| 256 | RESB - KNTTP | Account assignment category | ||
| 257 | RESB - KZAUS | Discontinuation type | ||
| 258 | RESB - KZBWS | Valuation of Special Stock | ||
| 259 | RESB - KZEAR | Final issue for this reservation | ||
| 260 | RESB - KZKUP | Indicator: Co-Product | ||
| 261 | RESB - KZVBR | Consumption posting | ||
| 262 | RESB - LGORT | Storage location | ||
| 263 | RESB - LIFNR | Account Number of Vendor or Creditor | ||
| 264 | RESB - LTXSP | Language: The long text was stored in this language | ||
| 265 | RESB - MATNR | Material Number | ||
| 266 | RESB - MEINS | Base Unit of Measure | ||
| 267 | RESB - NAFKZ | Indicator: follow-up material active/not active | ||
| 268 | RESB - NETAU | Indicator: Net Scrap | ||
| 269 | RESB - NFEAG | Discontinuation Group | ||
| 270 | RESB - NFGRP | Follow-Up Group | ||
| 271 | RESB - NFPKZ | Indicator: Follow-Up Item | ||
| 272 | RESB - NLFMV | Unit for lead-time offset for operation | ||
| 273 | RESB - NLFZT | Lead-Time Offset | ||
| 274 | RESB - NLFZV | Lead-time offset for operation | ||
| 275 | RESB - NOMAT | Follow-Up/Original Material | ||
| 276 | RESB - NOMNG | Required quantity | ||
| 277 | RESB - POSNR | BOM item number | ||
| 278 | RESB - POSTP | Item category (bill of material) | ||
| 279 | RESB - POTX1 | BOM Item Text (Line 1) | ||
| 280 | RESB - POTX2 | BOM Item Text (Line 2) | ||
| 281 | RESB - PRVBE | Production Supply Area | ||
| 282 | RESB - REVLV | Revision level | ||
| 283 | RESB - RFORM | Formula Key | ||
| 284 | RESB - ROANZ | Number of Variable-Size Items | ||
| 285 | RESB - ROHPS | Variable-sized item indicator | ||
| 286 | RESB - ROMEI | Unit of measure for sizes 1 to 3 | ||
| 287 | RESB - ROMEN | VarSizeItem Qty | ||
| 288 | RESB - ROMS1 | Size 1 | ||
| 289 | RESB - ROMS2 | Size 2 | ||
| 290 | RESB - ROMS3 | Size 3 | ||
| 291 | RESB - RSART | Record type | ||
| 292 | RESB - RSPOS | Item Number of Reservation / Dependent Requirements | ||
| 293 | RESB - SAKNR | G/L Account Number | ||
| 294 | RESB - SANKA | Indicator for Relevancy to Costing | ||
| 295 | RESB - SBTER | Latest requirements date | ||
| 296 | RESB - SCHGT | Indicator: bulk material | ||
| 297 | RESB - SERNR | BOM explosion number | ||
| 298 | RESB - SHKZG | Debit/Credit Indicator | ||
| 299 | RESB - SOBKZ | Special Stock Indicator | ||
| 300 | RESB - SORTF | Sort String | ||
| 301 | RESB - STLAL | Alternative BOM | ||
| 302 | RESB - STLKN | BOM Item Node Number | ||
| 303 | RESB - STLNR | Bill of Material | ||
| 304 | RESB - STLTY | BOM Category | ||
| 305 | RESB - STPOZ | Internal counter | ||
| 306 | RESB - STVKN | Inherited Node Number of BOM Item | ||
| 307 | RESB - TECHS | Parameter Variant/Standard Variant | ||
| 308 | RESB - TXTPS | Item text indicator | ||
| 309 | RESB - UMREN | Denominator for conversion to base units of measure | ||
| 310 | RESB - UMREZ | Numerator for Conversion to Base Units of Measure | ||
| 311 | RESB - UPSKZ | Indicator: Subitems Exist | ||
| 312 | RESB - VERTI | MRP Distribution Key | ||
| 313 | RESB - VMENG | Confirmed quantity for availability check in SKU | ||
| 314 | RESB - VRPLA | Indicator: planning without final assembly | ||
| 315 | RESB - WERKS | Plant | ||
| 316 | RESBD - AENNR | Change Number | ||
| 317 | RESBD - ALPGR | Alternative Item: Group | ||
| 318 | RESBD - ALPOS | Alternative item indicator | ||
| 319 | RESBD - ALPRF | Alternative Item: Ranking Order | ||
| 320 | RESBD - ALPST | Alternative Item: Strategy | ||
| 321 | RESBD - APLZL | Internal counter | ||
| 322 | RESBD - AUFST | Order level | ||
| 323 | RESBD - AUFWG | Order path | ||
| 324 | RESBD - AUSCH | Component scrap in percent | ||
| 325 | RESBD - AVOAU | Operation Scrap | ||
| 326 | RESBD - BAUGR | Material number of higher-level assembly | ||
| 327 | RESBD - BAUST | Assembly order level | ||
| 328 | RESBD - BAUWG | Assembly order path | ||
| 329 | RESBD - BDART | Requirement type | ||
| 330 | RESBD - BDMNG | Requirement Quantity | ||
| 331 | RESBD - BDTER | Requirements date for the component | ||
| 332 | RESBD - BEIKZ | Material Provision Indicators | ||
| 333 | RESBD - CLAKZ | Indicator: classification exists | ||
| 334 | RESBD - CUOBJ | Configuration (internal object number) | ||
| 335 | RESBD - DBSKZ | Direct procurement indicator | ||
| 336 | RESBD - DUMPS | Phantom item indicator | ||
| 337 | RESBD - ENMNG | Quantity withdrawn | ||
| 338 | RESBD - ERFME | Unit of entry | ||
| 339 | RESBD - ERFMG | Quantity in unit of entry | ||
| 340 | RESBD - ERSKZ | Indicator: Spare Part | ||
| 341 | RESBD - ESMNG | Usage quantity per order unit of measure | ||
| 342 | RESBD - EWAHR | Usage Probability in % (Alternative Item) | ||
| 343 | RESBD - FMENG | Quantity is fixed | ||
| 344 | RESBD - INPOS | Indicator: intra material | ||
| 345 | RESBD - KFPOS | Indicator: "configurable item" | ||
| 346 | RESBD - KNTTP | Account assignment category | ||
| 347 | RESBD - KZAUS | Discontinuation type | ||
| 348 | RESBD - KZBWS | Valuation of Special Stock | ||
| 349 | RESBD - KZEAR | Final issue for this reservation | ||
| 350 | RESBD - KZKUP | Indicator: Co-Product | ||
| 351 | RESBD - KZVBR | Consumption posting | ||
| 352 | RESBD - LGORT | Storage location | ||
| 353 | RESBD - LIFNR | Account Number of Vendor or Creditor | ||
| 354 | RESBD - LTXSP | Language: The long text was stored in this language | ||
| 355 | RESBD - MATNR | Material Number | ||
| 356 | RESBD - MEINS | Base Unit of Measure | ||
| 357 | RESBD - NAFKZ | Indicator: follow-up material active/not active | ||
| 358 | RESBD - NETAU | Indicator: Net Scrap | ||
| 359 | RESBD - NFEAG | Discontinuation Group | ||
| 360 | RESBD - NFGRP | Follow-Up Group | ||
| 361 | RESBD - NFPKZ | Indicator: Follow-Up Item | ||
| 362 | RESBD - NLFMV | Unit for lead-time offset for operation | ||
| 363 | RESBD - NLFZT | Lead-Time Offset | ||
| 364 | RESBD - NLFZV | Lead-time offset for operation | ||
| 365 | RESBD - NOMAT | Follow-Up/Original Material | ||
| 366 | RESBD - NOMNG | Required quantity | ||
| 367 | RESBD - POSNR | BOM item number | ||
| 368 | RESBD - POSTP | Item category (bill of material) | ||
| 369 | RESBD - POTX1 | BOM Item Text (Line 1) | ||
| 370 | RESBD - POTX2 | BOM Item Text (Line 2) | ||
| 371 | RESBD - PRVBE | Production Supply Area | ||
| 372 | RESBD - REVLV | Revision level | ||
| 373 | RESBD - RFORM | Formula Key | ||
| 374 | RESBD - ROANZ | Number of Variable-Size Items | ||
| 375 | RESBD - ROHPS | Variable-sized item indicator | ||
| 376 | RESBD - ROMEI | Unit of measure for sizes 1 to 3 | ||
| 377 | RESBD - ROMEN | VarSizeItem Qty | ||
| 378 | RESBD - ROMS1 | Size 1 | ||
| 379 | RESBD - ROMS2 | Size 2 | ||
| 380 | RESBD - ROMS3 | Size 3 | ||
| 381 | RESBD - RSART | Record type | ||
| 382 | RESBD - RSPOS | Item Number of Reservation / Dependent Requirements | ||
| 383 | RESBD - SAKNR | G/L Account Number | ||
| 384 | RESBD - SANKA | Indicator for Relevancy to Costing | ||
| 385 | RESBD - SBDKZ | Dependent requirements ind. for individual and coll. reqmts | ||
| 386 | RESBD - SBTER | Latest requirements date | ||
| 387 | RESBD - SCHGT | Indicator: bulk material | ||
| 388 | RESBD - SERNR | BOM explosion number | ||
| 389 | RESBD - SHKZG | Debit/Credit Indicator | ||
| 390 | RESBD - SOBKZ | Special Stock Indicator | ||
| 391 | RESBD - SORTF | Sort String | ||
| 392 | RESBD - STLAL | Alternative BOM | ||
| 393 | RESBD - STLKN | BOM Item Node Number | ||
| 394 | RESBD - STLNR | Bill of Material | ||
| 395 | RESBD - STLTY | BOM Category | ||
| 396 | RESBD - STPOZ | Internal counter | ||
| 397 | RESBD - STVKN | Inherited Node Number of BOM Item | ||
| 398 | RESBD - TECHS | Parameter Variant/Standard Variant | ||
| 399 | RESBD - TXTPS | Item text indicator | ||
| 400 | RESBD - UMREN | Denominator for conversion to base units of measure | ||
| 401 | RESBD - UMREZ | Numerator for Conversion to Base Units of Measure | ||
| 402 | RESBD - UPSKZ | Indicator: Subitems Exist | ||
| 403 | RESBD - VERTI | MRP Distribution Key | ||
| 404 | RESBD - VMENG | Confirmed quantity for availability check in SKU | ||
| 405 | RESBD - VRPLA | Indicator: planning without final assembly | ||
| 406 | RESBD - WERKS | Plant | ||
| 407 | RESBDGET - AENNR | Change Number | ||
| 408 | RESBDGET - ALPGR | Alternative Item: Group | ||
| 409 | RESBDGET - ALPOS | Alternative item indicator | ||
| 410 | RESBDGET - ALPRF | Alternative Item: Ranking Order | ||
| 411 | RESBDGET - ALPST | Alternative Item: Strategy | ||
| 412 | RESBDGET - APLZL | Internal counter | ||
| 413 | RESBDGET - AUFST | Order level | ||
| 414 | RESBDGET - AUFWG | Order path | ||
| 415 | RESBDGET - AUSCH | Component scrap in percent | ||
| 416 | RESBDGET - AVOAU | Operation Scrap | ||
| 417 | RESBDGET - BAUGR | Material number of higher-level assembly | ||
| 418 | RESBDGET - BAUST | Assembly order level | ||
| 419 | RESBDGET - BAUWG | Assembly order path | ||
| 420 | RESBDGET - BDART | Requirement type | ||
| 421 | RESBDGET - BDMNG | Requirement Quantity | ||
| 422 | RESBDGET - BDTER | Requirements date for the component | ||
| 423 | RESBDGET - BEIKZ | Material Provision Indicators | ||
| 424 | RESBDGET - CLAKZ | Indicator: classification exists | ||
| 425 | RESBDGET - CUOBJ | Configuration (internal object number) | ||
| 426 | RESBDGET - DBSKZ | Direct procurement indicator | ||
| 427 | RESBDGET - DUMPS | Phantom item indicator | ||
| 428 | RESBDGET - ENMNG | Quantity withdrawn | ||
| 429 | RESBDGET - ERFME | Unit of entry | ||
| 430 | RESBDGET - ERFMG | Quantity in unit of entry | ||
| 431 | RESBDGET - ERSKZ | Indicator: Spare Part | ||
| 432 | RESBDGET - ESMNG | Usage quantity per order unit of measure | ||
| 433 | RESBDGET - EWAHR | Usage Probability in % (Alternative Item) | ||
| 434 | RESBDGET - FMENG | Quantity is fixed | ||
| 435 | RESBDGET - INPOS | Indicator: intra material | ||
| 436 | RESBDGET - KFPOS | Indicator: "configurable item" | ||
| 437 | RESBDGET - KNTTP | Account assignment category | ||
| 438 | RESBDGET - KZAUS | Discontinuation type | ||
| 439 | RESBDGET - KZBWS | Valuation of Special Stock | ||
| 440 | RESBDGET - KZEAR | Final issue for this reservation | ||
| 441 | RESBDGET - KZKUP | Indicator: Co-Product | ||
| 442 | RESBDGET - KZVBR | Consumption posting | ||
| 443 | RESBDGET - LGORT | Storage location | ||
| 444 | RESBDGET - LIFNR | Account Number of Vendor or Creditor | ||
| 445 | RESBDGET - LTXSP | Language: The long text was stored in this language | ||
| 446 | RESBDGET - MATNR | Material Number | ||
| 447 | RESBDGET - MEINS | Base Unit of Measure | ||
| 448 | RESBDGET - NAFKZ | Indicator: follow-up material active/not active | ||
| 449 | RESBDGET - NETAU | Indicator: Net Scrap | ||
| 450 | RESBDGET - NFEAG | Discontinuation Group | ||
| 451 | RESBDGET - NFGRP | Follow-Up Group | ||
| 452 | RESBDGET - NFPKZ | Indicator: Follow-Up Item | ||
| 453 | RESBDGET - NLFMV | Unit for lead-time offset for operation | ||
| 454 | RESBDGET - NLFZT | Lead-Time Offset | ||
| 455 | RESBDGET - NLFZV | Lead-time offset for operation | ||
| 456 | RESBDGET - NOMAT | Follow-Up/Original Material | ||
| 457 | RESBDGET - NOMNG | Required quantity | ||
| 458 | RESBDGET - POSNR | BOM item number | ||
| 459 | RESBDGET - POSTP | Item category (bill of material) | ||
| 460 | RESBDGET - POTX1 | BOM Item Text (Line 1) | ||
| 461 | RESBDGET - POTX2 | BOM Item Text (Line 2) | ||
| 462 | RESBDGET - PRVBE | Production Supply Area | ||
| 463 | RESBDGET - REVLV | Revision level | ||
| 464 | RESBDGET - RFORM | Formula Key | ||
| 465 | RESBDGET - ROANZ | Number of Variable-Size Items | ||
| 466 | RESBDGET - ROHPS | Variable-sized item indicator | ||
| 467 | RESBDGET - ROMEI | Unit of measure for sizes 1 to 3 | ||
| 468 | RESBDGET - ROMEN | VarSizeItem Qty | ||
| 469 | RESBDGET - ROMS1 | Size 1 | ||
| 470 | RESBDGET - ROMS2 | Size 2 | ||
| 471 | RESBDGET - ROMS3 | Size 3 | ||
| 472 | RESBDGET - RSART | Record type | ||
| 473 | RESBDGET - RSPOS | Item Number of Reservation / Dependent Requirements | ||
| 474 | RESBDGET - SAKNR | G/L Account Number | ||
| 475 | RESBDGET - SANKA | Indicator for Relevancy to Costing | ||
| 476 | RESBDGET - SBDKZ | Dependent requirements ind. for individual and coll. reqmts | ||
| 477 | RESBDGET - SBTER | Latest requirements date | ||
| 478 | RESBDGET - SCHGT | Indicator: bulk material | ||
| 479 | RESBDGET - SERNR | BOM explosion number | ||
| 480 | RESBDGET - SHKZG | Debit/Credit Indicator | ||
| 481 | RESBDGET - SOBKZ | Special Stock Indicator | ||
| 482 | RESBDGET - SORTF | Sort String | ||
| 483 | RESBDGET - STLAL | Alternative BOM | ||
| 484 | RESBDGET - STLKN | BOM Item Node Number | ||
| 485 | RESBDGET - STLNR | Bill of Material | ||
| 486 | RESBDGET - STLTY | BOM Category | ||
| 487 | RESBDGET - STPOZ | Internal counter | ||
| 488 | RESBDGET - STVKN | Inherited Node Number of BOM Item | ||
| 489 | RESBDGET - TECHS | Parameter Variant/Standard Variant | ||
| 490 | RESBDGET - TXTPS | Item text indicator | ||
| 491 | RESBDGET - UMREN | Denominator for conversion to base units of measure | ||
| 492 | RESBDGET - UMREZ | Numerator for Conversion to Base Units of Measure | ||
| 493 | RESBDGET - UPSKZ | Indicator: Subitems Exist | ||
| 494 | RESBDGET - VERTI | MRP Distribution Key | ||
| 495 | RESBDGET - VMENG | Confirmed quantity for availability check in SKU | ||
| 496 | RESBDGET - VRPLA | Indicator: planning without final assembly | ||
| 497 | RESBDGET - WERKS | Plant | ||
| 498 | SYST - BINPT | ABAP System Field: Batch Input Processing Active | ||
| 499 | SYST - LANGU | ABAP System Field: Language Key of Text Environment | ||
| 500 | SYST - MSGID | ABAP System Field: Message ID |