Table list used by SAP ABAP Function Module CNPB_H_SUBTREE_MOVE (Umhängen eines Teilbaumes)
SAP ABAP Function Module
CNPB_H_SUBTREE_MOVE (Umhängen eines Teilbaumes) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AFFHD | Structure of the PRTs in orders | ||
| 2 | AFRUD | Dialog table for completion confirmations | ||
| 3 | AFVGD | Order: Dialog table for Table AFVG (order operation) | ||
| 4 | CAUFVD | Dialog Structure for Order Headers and Items | ||
| 5 | CNPB_H_AFAB_MANDATORY_FIELDS | Fields from AFAB Required to Determine Hierarchy | ||
| 6 | CNPB_H_AFFH_MANDATORY_FIELDS | Fields Required from AFFH to Determine the Hierarchy | ||
| 7 | CNPB_H_AFVG_MANDATORY_FIELDS | Fields Required from AFV* to Determine the Hierarchy | ||
| 8 | CNPB_H_AUFK_MANDATORY_FIELDS | Fields Required from AUFK to Determine the Hierarchy | ||
| 9 | CNPB_H_DOCS_MANDATORY_FIELDS | Necessary Fields from DRAD, for Determining Hierarchy | ||
| 10 | CNPB_H_FILE_MANDATORY_FIELDS | Necessary Fields for Document Orig. to Determine Hierarchy | ||
| 11 | CNPB_H_MLST_MANDATORY_FIELDS | Fields Required from MLST to Determine the Hierarchy | ||
| 12 | CNPB_H_NPTX_MANDATORY_FIELDS | Fields Required from NPTX/PSTX to Determine the Hierarchy | ||
| 13 | CNPB_H_PROJ_MANDATORY_FIELDS | Fields Required from PROJ to Determine the Hierarchy | ||
| 14 | CNPB_H_PRPS_MANDATORY_FIELDS | Fields Required from PRPS to Determine the Hierarchy | ||
| 15 | CNPB_H_PRTX_MANDATORY_FIELDS | Fields Required from PRTX/PSTX to Determine the Hierarchy | ||
| 16 | CNPB_H_RESB_MANDATORY_FIELDS | Fields Required from RESB to Determine the Hierarchy | ||
| 17 | CNPB_OBJECT_KEYS | Key of an Object Used in PS | ||
| 18 | MLSTB | Milestone document table | ||
| 19 | NPTXB | Doc. Table for PS Texts in the Network (NPTX + PSTX) | ||
| 20 | PRHI | Work Breakdown Structure, Edges (Hierarchy Pointer) | ||
| 21 | PROJ | Project definition | ||
| 22 | PRPS | WBS (Work Breakdown Structure) Element Master Data | ||
| 23 | PRPS_BALK | PRPS structure for Gantt chart | ||
| 24 | PRTXD | PS text for WBS, Allocation and administration records | ||
| 25 | RCLST | Structure of the dialog table in CIM | ||
| 26 | RESBD | Reservation/Dependent requirements |