Table list used by SAP ABAP Function Module CNIF_PROJECT_VERSION_TRANSFER (Maintain Project Objects via interface)
SAP ABAP Function Module
CNIF_PROJECT_VERSION_TRANSFER (Maintain Project Objects via interface) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | ACT01_REF | Reference structure for source and target network activity | SOURCE IMP_ACT01_REF STRUCTURE ACT01_REF OPTIONAL |
|
| 2 | AFABD | Network: Dialog table for AFAB | SOURCE IMP_AFABD STRUCTURE AFABD OPTIONAL |
|
| 3 | AFFLD | Order: Dialog table for order sequences (AFFL) | SOURCE IMP_AFFLD STRUCTURE AFFLD OPTIONAL |
|
| 4 | AFPOD | Order item dialog structure | SOURCE IMP_AFPOD STRUCTURE AFPOD OPTIONAL |
|
| 5 | AFVGD | Order: Dialog table for Table AFVG (order operation) | SOURCE IMP_AFVGD STRUCTURE AFVGD OPTIONAL |
|
| 6 | AUFK_REF | Reference structure for source and target network | SOURCE IMP_AUFK_REF STRUCTURE AUFK_REF OPTIONAL |
|
| 7 | BAPI_METH_MESSAGE | Message table for BAPIs (Project System) | ||
| 8 | CAUFVD | Dialog Structure for Order Headers and Items | ||
| 9 | CAUFVD | Dialog Structure for Order Headers and Items | SOURCE IMP_CAUFVD STRUCTURE CAUFVD OPTIONAL |
|
| 10 | IFHIERIM | Interface structure for hierarchy -> import only | SOURCE IMP_HIERARCHY STRUCTURE IFHIERIM OPTIONAL |
|
| 11 | IFOBJMETHD | Interface structure for transferring object methods | SOURCE IMP_METHODS STRUCTURE IFOBJMETHD |
|
| 12 | IFOBJ_REFERENCE | Structure for reference table in simulation interface | SOURCE EXP_OBJ_REFERENCE STRUCTURE IFOBJ_REFERENCE OPTIONAL |
|
| 13 | IONRC | Temporary and definitive object number | ||
| 14 | KBEDD | Capacity requirements: dialog table for KBED | SOURCE IMP_KBEDD STRUCTURE KBEDD OPTIONAL |
|
| 15 | KBKO | Header Record for Capacity Requirements | SOURCE IMP_KBKO STRUCTURE KBKO OPTIONAL |
|
| 16 | METHOD_LOG | Log: method with object and indicator to messages | SOURCE EXP_METHOD_LOG STRUCTURE METHOD_LOG OPTIONAL |
|
| 17 | METHOD_LOG | Log: method with object and indicator to messages | ||
| 18 | MLSTD | Milestone I/O Table | SOURCE IMP_MLSTD STRUCTURE MLSTD OPTIONAL |
|
| 19 | MLST_REF | Reference structure for source and target milestones | SOURCE IMP_MLST_REF STRUCTURE MLST_REF OPTIONAL |
|
| 20 | MSG_LOG | Messages for method log | SOURCE EXP_MSG_LOG STRUCTURE MSG_LOG OPTIONAL |
|
| 21 | MSG_LOG | Messages for method log | ||
| 22 | MSG_TEXT | Message texts for method log | SOURCE EXP_MSG_TEXT STRUCTURE MSG_TEXT OPTIONAL |
|
| 23 | MSG_TEXT | Message texts for method log | ||
| 24 | NPTXD | PS Text: Network (Tables NPTX and PSTX) | SOURCE IMP_NPTX STRUCTURE NPTXD OPTIONAL |
|
| 25 | NPTXD | PS Text: Network (Tables NPTX and PSTX) | ||
| 26 | PROJ_REF | Reference structure for source and target project definition | SOURCE IMP_PROJ_REF STRUCTURE PROJ_REF OPTIONAL |
|
| 27 | PRPS | WBS (Work Breakdown Structure) Element Master Data | SOURCE VALUE(IMP_POSID) LIKE PRPS-POSID OPTIONAL |
|
| 28 | PRPS_REF | Reference structurte for source and target WBS element | SOURCE IMP_PRPS_REF STRUCTURE PRPS_REF OPTIONAL |
|
| 29 | PRTEE | Document Structure of Table PRTE | SOURCE IMP_PRTEE STRUCTURE PRTEE OPTIONAL |
|
| 30 | PRTXD | PS text for WBS, Allocation and administration records | ||
| 31 | PRTXD | PS text for WBS, Allocation and administration records | SOURCE IMP_PRTX STRUCTURE PRTXD OPTIONAL |
|
| 32 | PSTX | PS Texts (Header) | SOURCE IMP_PSTX STRUCTURE PSTX OPTIONAL |
|
| 33 | RC27X | Auxiliary fields for list processing in routings | SOURCE VALUE(IMP_TEXT_MAINTAIN) LIKE RC27X-FLG_SEL DEFAULT 'X' |
|
| 34 | RC27X | Auxiliary fields for list processing in routings | SOURCE VALUE(IMP_DOC_MAINTAIN) LIKE RC27X-FLG_SEL DEFAULT 'X' |
|
| 35 | RCJDW_NEWN | Table for Assigning Temp.Itm No. to Act.Itm No. (new PRPS) | ||
| 36 | RESBD | Reservation/Dependent requirements | SOURCE IMP_RESBD STRUCTURE RESBD OPTIONAL |
|
| 37 | RESB_REF | Reference structure for source and target mat. components | SOURCE IMP_RESB_REF STRUCTURE RESB_REF OPTIONAL |
|
| 38 | VSKOPF | Version: Header - general data for a version - | SOURCE VALUE(IMP_VERSION_SOURCE) LIKE VSKOPF-VSNMR OPTIONAL |
|
| 39 | VSKOPFD | Version: Dialog table for VSKOPF | SOURCE IMP_VSKOPFD STRUCTURE VSKOPFD OPTIONAL |
|
| 40 | VSPROJ_CN | Version: Project definition | SOURCE IMP_PROJ STRUCTURE VSPROJ_CN OPTIONAL |
|
| 41 | VSPROJ_CN | Version: Project definition | ||
| 42 | VSPRPS_CN | Version: WBS element master data | SOURCE IMP_PRPS STRUCTURE VSPRPS_CN OPTIONAL |