Message Number list used by SAP ABAP Function Module CM_DI_PROCEED_MAT_PROV (Materialbereitstellung durchführen)
SAP ABAP Function Module
CM_DI_PROCEED_MAT_PROV (Materialbereitstellung durchführen) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | C5 - 642 | BOM is missing in production version | ||
| 2 | C5 - 608 | You cannot branch to another material list | ||
| 3 | CM - 021 | Change no. & is not valid for component allocation. | ||
| 4 | CM - 115 | Multiple allocations are not allowed in the std. seq. or parallel seq. | ||
| 5 | CM - 114 | No material components are allocated to operation | ||
| 6 | CM - 112 | No valid operation found. | ||
| 7 | CM - 111 | No valid routing found. | ||
| 8 | CM - 109 | BOM maintained with serial number. | ||
| 9 | CM - 105 | No material component allocation exists | ||
| 10 | CM - 100 | No valid bill of material found. | ||
| 11 | CM - 030 | The BOM used up to now is kept | ||
| 12 | CM - 022 | Component overview for routing cannot be called up | ||
| 13 | CM - 019 | Change number & is not valid for task list changes. | ||
| 14 | CM - 018 | The routing is locked by another user (only display). | ||
| 15 | CM - 017 | BOM status does not allow use in routings. | ||
| 16 | CM - 013 | No further alternative bill of material found | ||
| 17 | CM - 012 | Bill of material locked by another user (only display possible). | ||
| 18 | CM - 011 | A change number is required for maintaining the bill of material. | ||
| 19 | CM - 010 | You have no authorization for maintaining bills of material. | ||
| 20 | CM - 001 | You cannot allocate material components to sub-operations. | ||
| 21 | CP - 602 | No sequence selected (please select) |