Table/Structure Field list used by SAP ABAP Class CL_PS_SCHEDULE (PSHLP: Scheduling Functions)
SAP ABAP Class
CL_PS_SCHEDULE (PSHLP: Scheduling Functions) is using
pages: 1 2 3
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | AFKO_INC - AUFPL | Routing number of operations in the order | ||
| 2 | AFKO_INC - AUFPL | Routing number of operations in the order | ||
| 3 | AFVGB - APLZL | General counter for order | ||
| 4 | AFVGB - APLZL | General counter for order | ||
| 5 | AFVGB - APLZL | General counter for order | ||
| 6 | AFVGB - APLZL | General counter for order | ||
| 7 | AFVGB - AUFNR_T | Order Number | ||
| 8 | AFVGB - AUFNR_T | Order Number | ||
| 9 | AFVGB - AUFPL | Routing number of operations in the order | ||
| 10 | AFVGB - AUFPL | Routing number of operations in the order | ||
| 11 | AFVGB - AUFPL | Routing number of operations in the order | ||
| 12 | AFVGB - AUFPL | Routing number of operations in the order | ||
| 13 | AFVGB - BANFN | Purchase requisition number | ||
| 14 | AFVGB - BANFN | Purchase requisition number | ||
| 15 | AFVGB - BNFPO | Item number of the purchase requisition in the order | ||
| 16 | AFVGB - EWEND | Forecast finish date | ||
| 17 | AFVGB - EWSTD | Forecasted start date for the activity | ||
| 18 | AFVGB - FPAVD | Earliest scheduled start date (forecast) | ||
| 19 | AFVGB - FPEDD | Earliest scheduled finish date (forecast) | ||
| 20 | AFVGB - FSAVD | Earliest scheduled start: Execution (date) | ||
| 21 | AFVGB - FSAVD | Earliest scheduled start: Execution (date) | ||
| 22 | AFVGB - FSEDD | Earliest scheduled finish: Execution (date) | ||
| 23 | AFVGB - FSEDD | Earliest scheduled finish: Execution (date) | ||
| 24 | AFVGB - IEDD | Actual finish: Execution (date) | ||
| 25 | AFVGB - ISDD | Actual start: Execution (date) | ||
| 26 | AFVGB - MATERIAL | Ind.: Authorization exists | ||
| 27 | AFVGB - NTANF | Constraint for activity start (Basic) | ||
| 28 | AFVGB - NTEND | Constraint for Finish of Activity (Basic) | ||
| 29 | AFVGB - OBJNR | Object number | ||
| 30 | AFVGB - OBJNR | Object number | ||
| 31 | AFVGB - SPAVD | Latest scheduled start date (forecast) | ||
| 32 | AFVGB - SPEDD | Latest scheduled finish date (forecast) | ||
| 33 | AFVGB - SSAVD | Latest scheduled start: Execution (date) | ||
| 34 | AFVGB - SSAVD | Latest scheduled start: Execution (date) | ||
| 35 | AFVGB - SSEDD | Latest scheduled finish: Execution (date) | ||
| 36 | AFVGB - SSEDD | Latest scheduled finish: Execution (date) | ||
| 37 | AFVGB - VBKZ | Update indicator | ||
| 38 | AFVGB - VORNR | Operation/Activity Number | ||
| 39 | AFVGD - APLZL | General counter for order | ||
| 40 | AFVGD - APLZL | General counter for order | ||
| 41 | AFVGD - ARBID | Object ID of the resource | ||
| 42 | AFVGD - AUFNRD | Order Number | ||
| 43 | AFVGD - AUFNRD | Order Number | ||
| 44 | AFVGD - AUFNRD | Order Number | ||
| 45 | AFVGD - AUFPL | Routing number of operations in the order | ||
| 46 | AFVGD - AUFPL | Routing number of operations in the order | ||
| 47 | AFVGD - DAUNE | Normal duration/unit | ||
| 48 | AFVGD - DAUNO | Normal duration of the activity | ||
| 49 | AFVGD - DAUNO | Normal duration of the activity | ||
| 50 | AFVGD - EINSA | Constraint on the basic start date for the activity | ||
| 51 | AFVGD - EINSA | Constraint on the basic start date for the activity | ||
| 52 | AFVGD - EINSE | Constraint on the finish date of the activity | ||
| 53 | AFVGD - EINSE | Constraint on the finish date of the activity | ||
| 54 | AFVGD - INDBT | Field defined as in SY-TABIX | ||
| 55 | AFVGD - INDBT | Field defined as in SY-TABIX | ||
| 56 | AFVGD - KALID | Factory Calendar | ||
| 57 | AFVGD - NTANF | Constraint for activity start (Basic) | ||
| 58 | AFVGD - NTANF | Constraint for activity start (Basic) | ||
| 59 | AFVGD - NTANZ | Constraint for activity start time (Basic) | ||
| 60 | AFVGD - NTANZ | Constraint for activity start time (Basic) | ||
| 61 | AFVGD - NTEND | Constraint for finish of activity (Basic) | ||
| 62 | AFVGD - NTEND | Constraint for finish of activity (Basic) | ||
| 63 | AFVGD - NTENZ | Basic finish time of the activity | ||
| 64 | AFVGD - NTENZ | Basic finish time of the activity | ||
| 65 | AFVGI - ARBID | Object ID of the resource | ||
| 66 | AFVGI - ARBID | Object ID of the resource | ||
| 67 | AFVGI - BANFN | Purchase requisition number | ||
| 68 | AFVGI - BANFN | Purchase requisition number | ||
| 69 | AFVGI - BEDID | ID of the capacity requirements record | ||
| 70 | AFVGI - BNFPO | Item number of the purchase requisition in the order | ||
| 71 | AFVGI - KALID | Factory Calendar | ||
| 72 | AFVGI - OBJNR | Object number | ||
| 73 | AFVGI - OBJNR | Object number | ||
| 74 | AFVGI - OBJNR | Object number | ||
| 75 | AFVGI - OBJNR | Object number | ||
| 76 | AFVGI - PROJN | Work breakdown structure element (WBS element) | ||
| 77 | AFVGI - PROJN | Work breakdown structure element (WBS element) | ||
| 78 | AFVGI - SUMNR | Node number of the superior operation | ||
| 79 | AFVGI - VORNR | Operation/Activity Number | ||
| 80 | AFVKI - APLZL | General counter for order | ||
| 81 | AFVKI - APLZL | General counter for order | ||
| 82 | AFVKI - APLZL | General counter for order | ||
| 83 | AFVKI - APLZL | General counter for order | ||
| 84 | AFVKI - APLZL | General counter for order | ||
| 85 | AFVKI - AUFPL | Routing number of operations in the order | ||
| 86 | AFVKI - AUFPL | Routing number of operations in the order | ||
| 87 | AFVKI - AUFPL | Routing number of operations in the order | ||
| 88 | AFVKI - AUFPL | Routing number of operations in the order | ||
| 89 | AFVKI - AUFPL | Routing number of operations in the order | ||
| 90 | AFVVI - DAUNE | Normal duration/unit | ||
| 91 | AFVVI - DAUNE | Normal duration/unit | ||
| 92 | AFVVI - DAUNO | Normal duration of the activity | ||
| 93 | AFVVI - DAUNO | Normal duration of the activity | ||
| 94 | AFVVI - DAUNO | Normal duration of the activity | ||
| 95 | AFVVI - EINSA | Constraint on the basic start date for the activity | ||
| 96 | AFVVI - EINSA | Constraint on the basic start date for the activity | ||
| 97 | AFVVI - EINSE | Constraint on the finish date of the activity | ||
| 98 | AFVVI - EINSE | Constraint on the finish date of the activity | ||
| 99 | AFVVI - EWEND | Forecast finish date | ||
| 100 | AFVVI - EWEND | Forecast finish date | ||
| 101 | AFVVI - EWEND | Forecast finish date | ||
| 102 | AFVVI - EWSTD | Forecasted start date for the activity | ||
| 103 | AFVVI - EWSTD | Forecasted start date for the activity | ||
| 104 | AFVVI - EWSTD | Forecasted start date for the activity | ||
| 105 | AFVVI - FPAVD | Earliest scheduled start date (forecast) | ||
| 106 | AFVVI - FPAVD | Earliest scheduled start date (forecast) | ||
| 107 | AFVVI - FPAVD | Earliest scheduled start date (forecast) | ||
| 108 | AFVVI - FPEDD | Earliest scheduled finish date (forecast) | ||
| 109 | AFVVI - FPEDD | Earliest scheduled finish date (forecast) | ||
| 110 | AFVVI - FPEDD | Earliest scheduled finish date (forecast) | ||
| 111 | AFVVI - FSAVD | Earliest scheduled start: Execution (date) | ||
| 112 | AFVVI - FSAVD | Earliest scheduled start: Execution (date) | ||
| 113 | AFVVI - FSAVD | Earliest scheduled start: Execution (date) | ||
| 114 | AFVVI - FSAVD | Earliest scheduled start: Execution (date) | ||
| 115 | AFVVI - FSEDD | Earliest scheduled finish: Execution (date) | ||
| 116 | AFVVI - FSEDD | Earliest scheduled finish: Execution (date) | ||
| 117 | AFVVI - FSEDD | Earliest scheduled finish: Execution (date) | ||
| 118 | AFVVI - FSEDD | Earliest scheduled finish: Execution (date) | ||
| 119 | AFVVI - IEDD | Actual finish: Execution (date) | ||
| 120 | AFVVI - IEDD | Actual finish: Execution (date) | ||
| 121 | AFVVI - IEDD | Actual finish: Execution (date) | ||
| 122 | AFVVI - ISDD | Actual start: Execution (date) | ||
| 123 | AFVVI - ISDD | Actual start: Execution (date) | ||
| 124 | AFVVI - ISDD | Actual start: Execution (date) | ||
| 125 | AFVVI - NTANF | Constraint for activity start (Basic) | ||
| 126 | AFVVI - NTANF | Constraint for activity start (Basic) | ||
| 127 | AFVVI - NTANF | Constraint for activity start (Basic) | ||
| 128 | AFVVI - NTANF | Constraint for activity start (Basic) | ||
| 129 | AFVVI - NTANZ | Constraint for activity start time (Basic) | ||
| 130 | AFVVI - NTANZ | Constraint for activity start time (Basic) | ||
| 131 | AFVVI - NTEND | Constraint for finish of activity (Basic) | ||
| 132 | AFVVI - NTEND | Constraint for finish of activity (Basic) | ||
| 133 | AFVVI - NTEND | Constraint for finish of activity (Basic) | ||
| 134 | AFVVI - NTEND | Constraint for finish of activity (Basic) | ||
| 135 | AFVVI - NTENZ | Basic finish time of the activity | ||
| 136 | AFVVI - NTENZ | Basic finish time of the activity | ||
| 137 | AFVVI - SPAVD | Latest scheduled start date (forecast) | ||
| 138 | AFVVI - SPAVD | Latest scheduled start date (forecast) | ||
| 139 | AFVVI - SPAVD | Latest scheduled start date (forecast) | ||
| 140 | AFVVI - SPEDD | Latest scheduled finish date (forecast) | ||
| 141 | AFVVI - SPEDD | Latest scheduled finish date (forecast) | ||
| 142 | AFVVI - SPEDD | Latest scheduled finish date (forecast) | ||
| 143 | AFVVI - SSAVD | Latest scheduled start: Execution (date) | ||
| 144 | AFVVI - SSAVD | Latest scheduled start: Execution (date) | ||
| 145 | AFVVI - SSAVD | Latest scheduled start: Execution (date) | ||
| 146 | AFVVI - SSAVD | Latest scheduled start: Execution (date) | ||
| 147 | AFVVI - SSEDD | Latest scheduled finish: Execution (date) | ||
| 148 | AFVVI - SSEDD | Latest scheduled finish: Execution (date) | ||
| 149 | AFVVI - SSEDD | Latest scheduled finish: Execution (date) | ||
| 150 | AFVVI - SSEDD | Latest scheduled finish: Execution (date) | ||
| 151 | AUFK - AUFNR | Order Number | ||
| 152 | AUFK - AUFNR | Order Number | ||
| 153 | AUFK - AUFNR | Order Number | ||
| 154 | AUFK - OBJNR | Object number | ||
| 155 | AUFK - OBJNR | Object number | ||
| 156 | AUFK - OBJNR | Object number | ||
| 157 | AUFK - PSPEL | Work breakdown structure element (WBS element) | ||
| 158 | BAL_S_MSG - MSGID | Message Class | ||
| 159 | BAL_S_MSG - MSGID | Message Class | ||
| 160 | BAL_S_MSG - MSGID | Message Class | ||
| 161 | BAL_S_MSG - MSGID | Message Class | ||
| 162 | BAL_S_MSG - MSGID | Message Class | ||
| 163 | BAL_S_MSG - MSGID | Message Class | ||
| 164 | BAL_S_MSG - MSGID | Message Class | ||
| 165 | BAL_S_MSG - MSGNO | Message Number | ||
| 166 | BAL_S_MSG - MSGNO | Message Number | ||
| 167 | BAL_S_MSG - MSGNO | Message Number | ||
| 168 | BAL_S_MSG - MSGNO | Message Number | ||
| 169 | BAL_S_MSG - MSGNO | Message Number | ||
| 170 | BAL_S_MSG - MSGNO | Message Number | ||
| 171 | BAL_S_MSG - MSGNO | Message Number | ||
| 172 | BAL_S_MSG - MSGTY | Message Type | ||
| 173 | BAL_S_MSG - MSGTY | Message Type | ||
| 174 | BAL_S_MSG - MSGTY | Message Type | ||
| 175 | BAL_S_MSG - MSGTY | Message Type | ||
| 176 | BAL_S_MSG - MSGTY | Message Type | ||
| 177 | BAL_S_MSG - MSGTY | Message Type | ||
| 178 | BAL_S_MSG - MSGTY | Message Type | ||
| 179 | BAL_S_MSG - MSGTY | Message Type | ||
| 180 | BAL_S_MSG - MSGTY | Message Type | ||
| 181 | BAL_S_MSG - MSGV1 | Message Variable | ||
| 182 | BAL_S_MSG - MSGV1 | Message Variable | ||
| 183 | BAL_S_MSG - MSGV2 | Message Variable | ||
| 184 | BAL_S_MSG - MSGV2 | Message Variable | ||
| 185 | BAL_S_MSG - MSGV3 | Message Variable | ||
| 186 | BAL_S_MSG - MSG_COUNT | Application Log: Cumulated message count | ||
| 187 | BAL_S_MSG - MSG_COUNT | Application Log: Cumulated message count | ||
| 188 | BAL_S_MSG - MSG_COUNT | Application Log: Cumulated message count | ||
| 189 | BAL_S_MSG - MSG_COUNT | Application Log: Cumulated message count | ||
| 190 | BAL_S_MSG - MSG_COUNT | Application Log: Cumulated message count | ||
| 191 | BAL_S_MSG - MSG_COUNT | Application Log: Cumulated message count | ||
| 192 | BAL_S_MSG - PARAMS | BAL_S_MSG-PARAMS | ||
| 193 | BAL_S_PAR - PARNAME | Application log: Parameters | ||
| 194 | BAL_S_PARM - T_PAR | BAL_S_PARM-T_PAR | ||
| 195 | BAPI_ALM_ORDER_HEADER_E - ACTUAL_FINISH_DATE | Confirmed Order Finish Date | ||
| 196 | BAPI_ALM_ORDER_HEADER_E - ACTUAL_START_DATE | Actual start date | ||
| 197 | BAPI_ALM_ORDER_HEADER_E - FINISH_DATE | Basic finish date | ||
| 198 | BAPI_ALM_ORDER_HEADER_E - FINISH_DATE | Basic finish date | ||
| 199 | BAPI_ALM_ORDER_HEADER_E - OBJECT_NO | Object number | ||
| 200 | BAPI_ALM_ORDER_HEADER_E - PRODUCTION_FINISH_DATE | Scheduled finish | ||
| 201 | BAPI_ALM_ORDER_HEADER_E - PRODUCTION_FINISH_DATE | Scheduled finish | ||
| 202 | BAPI_ALM_ORDER_HEADER_E - PRODUCTION_FINISH_TIME | Scheduled finish time | ||
| 203 | BAPI_ALM_ORDER_HEADER_E - PRODUCTION_START_DATE | Scheduled start | ||
| 204 | BAPI_ALM_ORDER_HEADER_E - PRODUCTION_START_DATE | Scheduled start | ||
| 205 | BAPI_ALM_ORDER_HEADER_E - PRODUCTION_START_TIME | Scheduled Start (Time) | ||
| 206 | BAPI_ALM_ORDER_HEADER_E - START_DATE | Basic start date | ||
| 207 | BAPI_ALM_ORDER_HEADER_E - START_DATE | Basic start date | ||
| 208 | BAPI_ALM_ORDER_HEADER_E - SUPERIOR_COUNTER | General counter for order | ||
| 209 | BAPI_ALM_ORDER_HEADER_E - SUPERIOR_COUNTER | General counter for order | ||
| 210 | BAPI_ALM_ORDER_HEADER_E - SUPERIOR_COUNTER | General counter for order | ||
| 211 | BAPI_ALM_ORDER_HEADER_E - SUPERIOR_COUNTER | General counter for order | ||
| 212 | BAPI_ALM_ORDER_HEADER_E - SUPERIOR_COUNTER | General counter for order | ||
| 213 | BAPI_ALM_ORDER_HEADER_E - SUPERIOR_NETWORK | Number of superior network | ||
| 214 | BAPI_ALM_ORDER_HEADER_E - SUPERIOR_NETWORK | Number of superior network | ||
| 215 | BAPI_ALM_ORDER_HEADER_E - SUPERIOR_NETWORK | Number of superior network | ||
| 216 | BAPI_ALM_ORDER_HEADER_E - SUPERIOR_NETWORK | Number of superior network | ||
| 217 | BAPI_ALM_ORDER_HEADER_E - SUPERIOR_NETWORK | Number of superior network | ||
| 218 | BAPI_ALM_ORDER_HEADER_E - SUPERIOR_ROUTING_NO | Routing number of operations in the order | ||
| 219 | BEDID_PRE - BEDID | ID of the capacity requirements record | ||
| 220 | CAUFV - AUFNR | Order Number | ||
| 221 | CAUFV - AUFNT | Number of superior network | ||
| 222 | CAUFV - AUTYP | Order category | ||
| 223 | CAUFVD - APLZT | General counter for order | ||
| 224 | CAUFVD - AUFNR | Order Number | ||
| 225 | CAUFVD - AUFNR | Order Number | ||
| 226 | CAUFVD - AUFNR | Order Number | ||
| 227 | CAUFVD - AUFNT | Number of superior network | ||
| 228 | CAUFVD - AUTYP | Order category | ||
| 229 | CAUFVD - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 230 | CAUFVD - FLG_TRME | Indicator: Scheduling is carried out at least once | ||
| 231 | CAUFVD - FLG_TRME | Indicator: Scheduling is carried out at least once | ||
| 232 | CAUFVD - FLG_TRME | Indicator: Scheduling is carried out at least once | ||
| 233 | CAUFVD - FTRMI | Actual release date | ||
| 234 | CAUFVD - FTRMI | Actual release date | ||
| 235 | CAUFVD - FTRMS | Scheduled release date | ||
| 236 | CAUFVD - FTRMS | Scheduled release date | ||
| 237 | CAUFVD - FTRPS | Scheduled release date (forecast) | ||
| 238 | CAUFVD - FTRPS | Scheduled release date (forecast) | ||
| 239 | CAUFVD - GETRI | Confirmed Order Finish Date | ||
| 240 | CAUFVD - GETRI | Confirmed Order Finish Date | ||
| 241 | CAUFVD - GLTPP | Finish date (forecast) | ||
| 242 | CAUFVD - GLTPP | Finish date (forecast) | ||
| 243 | CAUFVD - GLTPS | Scheduled forecast finish | ||
| 244 | CAUFVD - GLTPS | Scheduled forecast finish | ||
| 245 | CAUFVD - GLTRP | Basic finish date | ||
| 246 | CAUFVD - GLTRP | Basic finish date | ||
| 247 | CAUFVD - GLTRS | Scheduled finish | ||
| 248 | CAUFVD - GLTRS | Scheduled finish | ||
| 249 | CAUFVD - GLUZS | Scheduled finish time | ||
| 250 | CAUFVD - GSTPP | Forecast start date | ||
| 251 | CAUFVD - GSTPP | Forecast start date | ||
| 252 | CAUFVD - GSTPS | Scheduled forecast start | ||
| 253 | CAUFVD - GSTPS | Scheduled forecast start | ||
| 254 | CAUFVD - GSTRI | Actual start date | ||
| 255 | CAUFVD - GSTRI | Actual start date | ||
| 256 | CAUFVD - GSTRP | Basic start date | ||
| 257 | CAUFVD - GSTRP | Basic start date | ||
| 258 | CAUFVD - GSTRS | Scheduled start | ||
| 259 | CAUFVD - GSTRS | Scheduled start | ||
| 260 | CAUFVD - GSUZS | Scheduled Start (Time) | ||
| 261 | CAUFVD - INDBT | Field defined as in SY-TABIX | ||
| 262 | CAUFVD - OBJNR | Object number | ||
| 263 | CAUFVD - OBJNR | Object number | ||
| 264 | CAUFVD - PLART | Basis for scheduling | ||
| 265 | CAUFVD - TERKZ | Scheduling type | ||
| 266 | CAUFVD - TMBAS | Set of dates for network | ||
| 267 | CAUFVD - TMBAS | Set of dates for network | ||
| 268 | CAUFVD - TMBAS | Set of dates for network | ||
| 269 | CAUFVD - TMBAS | Set of dates for network | ||
| 270 | CAUFVD - TMBAS | Set of dates for network | ||
| 271 | CAUFVD - TRKZP | Scheduling type (forecast) | ||
| 272 | CAUFVDB - FTRMS | Scheduled release date | ||
| 273 | CAUFVDB - VBKZ | Update indicator | ||
| 274 | CAUFVDB - OBJNR | Object number | ||
| 275 | CAUFVDB - GSTRS | Scheduled start | ||
| 276 | CAUFVDB - GSTRP | Basic start date | ||
| 277 | CAUFVDB - GSTRI | Actual start date | ||
| 278 | CAUFVDB - GSTPS | Scheduled forecast start | ||
| 279 | CAUFVDB - GSTPP | Forecast start date | ||
| 280 | CAUFVDB - GLTRS | Scheduled finish | ||
| 281 | CAUFVDB - GLTRP | Basic finish date | ||
| 282 | CAUFVDB - GLTPS | Scheduled forecast finish | ||
| 283 | CAUFVDB - GLTPP | Finish date (forecast) | ||
| 284 | CAUFVDB - FTRPS | Scheduled release date (forecast) | ||
| 285 | CAUFVDB - AUFNR | Order Number | ||
| 286 | CAUFVDB - FTRMI | Actual release date | ||
| 287 | CAUFVDB - AUTYP | Order category | ||
| 288 | CAUFVDB - AUFPL | Routing number of operations in the order | ||
| 289 | CAUFVDB - AUFPL | Routing number of operations in the order | ||
| 290 | CAUFVDB - AUFNR | Order Number | ||
| 291 | CAUFVDB - GLTRI | Actual finish date | ||
| 292 | CAUFVDGET - AUTYP | Order category | ||
| 293 | CAUFVDGET - FTRMI | Actual release date | ||
| 294 | CAUFVDGET - FTRMS | Scheduled release date | ||
| 295 | CAUFVDGET - FTRPS | Scheduled release date (forecast) | ||
| 296 | CAUFVDGET - GETRI | Confirmed Order Finish Date | ||
| 297 | CAUFVDGET - GLTPP | Finish date (forecast) | ||
| 298 | CAUFVDGET - GLTPS | Scheduled forecast finish | ||
| 299 | CAUFVDGET - GLTRP | Basic finish date | ||
| 300 | CAUFVDGET - GLTRS | Scheduled finish | ||
| 301 | CAUFVDGET - GSTPP | Forecast start date | ||
| 302 | CAUFVDGET - GSTPS | Scheduled forecast start | ||
| 303 | CAUFVDGET - GSTRI | Actual start date | ||
| 304 | CAUFVDGET - GSTRP | Basic start date | ||
| 305 | CAUFVDGET - GSTRS | Scheduled start | ||
| 306 | CAUFVDGET - OBJNR | Object number | ||
| 307 | CAUFVTAB - APLZT | General counter for order | ||
| 308 | CAUFVTAB - AUFNR | Order Number | ||
| 309 | CAUFVTAB - AUFNR | Order Number | ||
| 310 | CAUFVTAB - AUFNR | Order Number | ||
| 311 | CAUFVTAB - AUFNR | Order Number | ||
| 312 | CAUFVTAB - AUFNT | Number of superior network | ||
| 313 | CAUFVTAB - AUFPL | Routing number of operations in the order | ||
| 314 | CAUFVTAB - AUFPL | Routing number of operations in the order | ||
| 315 | CAUFVTAB - AUTYP | Order category | ||
| 316 | CAUFVTAB - AUTYP | Order category | ||
| 317 | CAUFVTAB - BREAKS | Indicator: Scheduling allowing for breaks | ||
| 318 | CAUFVTAB - FTRMI | Actual release date | ||
| 319 | CAUFVTAB - FTRMI | Actual release date | ||
| 320 | CAUFVTAB - FTRMI | Actual release date | ||
| 321 | CAUFVTAB - FTRMS | Scheduled release date | ||
| 322 | CAUFVTAB - FTRMS | Scheduled release date | ||
| 323 | CAUFVTAB - FTRMS | Scheduled release date | ||
| 324 | CAUFVTAB - FTRPS | Scheduled release date (forecast) | ||
| 325 | CAUFVTAB - FTRPS | Scheduled release date (forecast) | ||
| 326 | CAUFVTAB - FTRPS | Scheduled release date (forecast) | ||
| 327 | CAUFVTAB - GETRI | Confirmed Order Finish Date | ||
| 328 | CAUFVTAB - GETRI | Confirmed Order Finish Date | ||
| 329 | CAUFVTAB - GLTPP | Finish date (forecast) | ||
| 330 | CAUFVTAB - GLTPP | Finish date (forecast) | ||
| 331 | CAUFVTAB - GLTPP | Finish date (forecast) | ||
| 332 | CAUFVTAB - GLTPS | Scheduled forecast finish | ||
| 333 | CAUFVTAB - GLTPS | Scheduled forecast finish | ||
| 334 | CAUFVTAB - GLTPS | Scheduled forecast finish | ||
| 335 | CAUFVTAB - GLTRI | Actual finish date | ||
| 336 | CAUFVTAB - GLTRP | Basic finish date | ||
| 337 | CAUFVTAB - GLTRP | Basic finish date | ||
| 338 | CAUFVTAB - GLTRP | Basic finish date | ||
| 339 | CAUFVTAB - GLTRS | Scheduled finish | ||
| 340 | CAUFVTAB - GLTRS | Scheduled finish | ||
| 341 | CAUFVTAB - GLTRS | Scheduled finish | ||
| 342 | CAUFVTAB - GLUZS | Scheduled finish time | ||
| 343 | CAUFVTAB - GSTPP | Forecast start date | ||
| 344 | CAUFVTAB - GSTPP | Forecast start date | ||
| 345 | CAUFVTAB - GSTPP | Forecast start date | ||
| 346 | CAUFVTAB - GSTPS | Scheduled forecast start | ||
| 347 | CAUFVTAB - GSTPS | Scheduled forecast start | ||
| 348 | CAUFVTAB - GSTPS | Scheduled forecast start | ||
| 349 | CAUFVTAB - GSTRI | Actual start date | ||
| 350 | CAUFVTAB - GSTRI | Actual start date | ||
| 351 | CAUFVTAB - GSTRI | Actual start date | ||
| 352 | CAUFVTAB - GSTRP | Basic start date | ||
| 353 | CAUFVTAB - GSTRP | Basic start date | ||
| 354 | CAUFVTAB - GSTRP | Basic start date | ||
| 355 | CAUFVTAB - GSTRS | Scheduled start | ||
| 356 | CAUFVTAB - GSTRS | Scheduled start | ||
| 357 | CAUFVTAB - GSTRS | Scheduled start | ||
| 358 | CAUFVTAB - GSUZS | Scheduled Start (Time) | ||
| 359 | CAUFVTAB - OBJNR | Object number | ||
| 360 | CAUFVTAB - OBJNR | Object number | ||
| 361 | CAUFVTAB - OBJNR | Object number | ||
| 362 | CAUFVTAB - PLART | Basis for scheduling | ||
| 363 | CAUFVTAB - TERKZ | Scheduling type | ||
| 364 | CAUFVTAB - TRKZP | Scheduling type (forecast) | ||
| 365 | CMFMSG - ARBGB | Application Area | ||
| 366 | CMFMSG - MSGNR | Message number | ||
| 367 | CMFMSG - MSGTY | Message Type | ||
| 368 | CMFMSG - MSGV1 | Message Variable | ||
| 369 | CMFMSG - MSGV2 | Message Variable | ||
| 370 | CMFMSG - MSGV3 | Message Variable | ||
| 371 | COAUTHINF - CHANGE | Ind.: Authorization exists | ||
| 372 | COAUTHINF - MATERIAL | Ind.: Authorization exists | ||
| 373 | COCAUFVINF - FLG_TRME | Indicator: Scheduling is carried out at least once | ||
| 374 | COCAUFVINF - FLG_TRME | Indicator: Scheduling is carried out at least once | ||
| 375 | COCAUFVINF - FLG_TRME | Indicator: Scheduling is carried out at least once | ||
| 376 | COCAUFVINF - INDBT | Field defined as in SY-TABIX | ||
| 377 | COCAUFVINF - TMBAS | Set of dates for network | ||
| 378 | COCAUFVINF - TMBAS | Set of dates for network | ||
| 379 | COCAUFVINF - TMBAS | Set of dates for network | ||
| 380 | COCAUFVINF - TMBAS | Set of dates for network | ||
| 381 | COCAUFVINF - TMBAS | Set of dates for network | ||
| 382 | COOPRINF - AUFNRD | Order Number | ||
| 383 | COOPRINF - AUFNRD | Order Number | ||
| 384 | COOPRINF - AUFNRD | Order Number | ||
| 385 | COOPRINF - INDBT | Field defined as in SY-TABIX | ||
| 386 | COOPRINF - INDBT | Field defined as in SY-TABIX | ||
| 387 | COUPDINF - AUFNR_T | Order Number | ||
| 388 | COUPDINF - AUFNR_T | Order Number | ||
| 389 | COUPDINF - VBKZ | Update indicator | ||
| 390 | CRID - MANDT | Client | ||
| 391 | CRID - OBJID | Object ID of the resource | ||
| 392 | EAMS_S_BO_ORD_HEADER - ACTUAL_FINISH_DATE | Confirmed Order Finish Date | ||
| 393 | EAMS_S_BO_ORD_HEADER - ACTUAL_START_DATE | Actual start date | ||
| 394 | EAMS_S_BO_ORD_HEADER - EAMS_AUFNR | Order Number | ||
| 395 | EAMS_S_BO_ORD_HEADER - FINISH_DATE | Basic finish date | ||
| 396 | EAMS_S_BO_ORD_HEADER - FINISH_DATE | Basic finish date | ||
| 397 | EAMS_S_BO_ORD_HEADER - OBJECT_NO | Object number | ||
| 398 | EAMS_S_BO_ORD_HEADER - PRODUCTION_FINISH_DATE | Scheduled finish | ||
| 399 | EAMS_S_BO_ORD_HEADER - PRODUCTION_FINISH_DATE | Scheduled finish | ||
| 400 | EAMS_S_BO_ORD_HEADER - PRODUCTION_FINISH_TIME | Scheduled finish time | ||
| 401 | EAMS_S_BO_ORD_HEADER - PRODUCTION_START_DATE | Scheduled start | ||
| 402 | EAMS_S_BO_ORD_HEADER - PRODUCTION_START_DATE | Scheduled start | ||
| 403 | EAMS_S_BO_ORD_HEADER - PRODUCTION_START_TIME | Scheduled Start (Time) | ||
| 404 | EAMS_S_BO_ORD_HEADER - START_DATE | Basic start date | ||
| 405 | EAMS_S_BO_ORD_HEADER - START_DATE | Basic start date | ||
| 406 | EAMS_S_BO_ORD_HEADER - SUPERIOR_COUNTER | General counter for order | ||
| 407 | EAMS_S_BO_ORD_HEADER - SUPERIOR_COUNTER | General counter for order | ||
| 408 | EAMS_S_BO_ORD_HEADER - SUPERIOR_COUNTER | General counter for order | ||
| 409 | EAMS_S_BO_ORD_HEADER - SUPERIOR_COUNTER | General counter for order | ||
| 410 | EAMS_S_BO_ORD_HEADER - SUPERIOR_COUNTER | General counter for order | ||
| 411 | EAMS_S_BO_ORD_HEADER - SUPERIOR_NETWORK | Number of superior network | ||
| 412 | EAMS_S_BO_ORD_HEADER - SUPERIOR_NETWORK | Number of superior network | ||
| 413 | EAMS_S_BO_ORD_HEADER - SUPERIOR_NETWORK | Number of superior network | ||
| 414 | EAMS_S_BO_ORD_HEADER - SUPERIOR_NETWORK | Number of superior network | ||
| 415 | EAMS_S_BO_ORD_HEADER - SUPERIOR_NETWORK | Number of superior network | ||
| 416 | EAMS_S_BO_ORD_HEADER - SUPERIOR_ROUTING_NO | Routing number of operations in the order | ||
| 417 | EAMS_S_BO_ORD_ID - EAMS_AUFNR | Order Number | ||
| 418 | EAMS_S_BO_ORD_ID - EAMS_AUFNR | Order Number | ||
| 419 | EAMS_S_BO_ORD_ID - EAMS_AUFNR | Order Number | ||
| 420 | IONR - OBART | Object Type | ||
| 421 | IONR - OBART | Object Type | ||
| 422 | IONR - OBART | Object Type | ||
| 423 | IONR - OBART | Object Type | ||
| 424 | IONR - OBART | Object Type | ||
| 425 | IONR - OBART | Object Type | ||
| 426 | IONR - OBART | Object Type | ||
| 427 | IONR - OBART | Object Type | ||
| 428 | IONR - OBART | Object Type | ||
| 429 | IONR - OBART | Object Type | ||
| 430 | IONR - OBART | Object Type | ||
| 431 | IONR - OBART | Object Type | ||
| 432 | IONR - OBART | Object Type | ||
| 433 | IONR - OBART | Object Type | ||
| 434 | IONR - OBART | Object Type | ||
| 435 | IONR - OBART | Object Type | ||
| 436 | MLST - EDATU | Fixed milestone date (basic) | ||
| 437 | MLST - EDATU | Fixed milestone date (basic) | ||
| 438 | MLST - EDATU | Fixed milestone date (basic) | ||
| 439 | MLST - LST_ACTDT | Actual date (Milestone met) | ||
| 440 | MLST - LST_ACTDT | Actual date (Milestone met) | ||
| 441 | MLST - LST_ACTDT | Actual date (Milestone met) | ||
| 442 | MLST - MLST_ZAEHL | Number of milestone | ||
| 443 | MLST - MLST_ZAEHL | Number of milestone | ||
| 444 | MLST - PDATU | Fixed milestone date (F) | ||
| 445 | MLST - PDATU | Fixed milestone date (F) | ||
| 446 | MLST - PDATU | Fixed milestone date (F) | ||
| 447 | MLST - TEDAT | Scheduled milestone date (Basic) | ||
| 448 | MLST - TEDAT | Scheduled milestone date (Basic) | ||
| 449 | MLST - TEDAT | Scheduled milestone date (Basic) | ||
| 450 | MLST - TPDAT | Scheduled milestone date (Forecast) | ||
| 451 | MLST - TPDAT | Scheduled milestone date (Forecast) | ||
| 452 | MLST - TPDAT | Scheduled milestone date (Forecast) | ||
| 453 | MLST - ZAEHL | Internal counter | ||
| 454 | MLST - ZAEHL | Internal counter | ||
| 455 | MLST_INC - EDATU | Fixed milestone date (basic) | ||
| 456 | MLST_INC - EDATU | Fixed milestone date (basic) | ||
| 457 | MLST_INC - EDATU | Fixed milestone date (basic) | ||
| 458 | MLST_INC - LST_ACTDT | Actual date (Milestone met) | ||
| 459 | MLST_INC - LST_ACTDT | Actual date (Milestone met) | ||
| 460 | MLST_INC - LST_ACTDT | Actual date (Milestone met) | ||
| 461 | MLST_INC - PDATU | Fixed milestone date (F) | ||
| 462 | MLST_INC - PDATU | Fixed milestone date (F) | ||
| 463 | MLST_INC - PDATU | Fixed milestone date (F) | ||
| 464 | MLST_INC - TEDAT | Scheduled milestone date (Basic) | ||
| 465 | MLST_INC - TEDAT | Scheduled milestone date (Basic) | ||
| 466 | MLST_INC - TEDAT | Scheduled milestone date (Basic) | ||
| 467 | MLST_INC - TPDAT | Scheduled milestone date (Forecast) | ||
| 468 | MLST_INC - TPDAT | Scheduled milestone date (Forecast) | ||
| 469 | MLST_INC - TPDAT | Scheduled milestone date (Forecast) | ||
| 470 | ORD_PRE - AUFNR | Order Number | ||
| 471 | ORD_PRE - AUFNR | Order Number | ||
| 472 | PROJ - EPROG | PROJ-EPROG | ||
| 473 | PROJ - OBJNR | Object number | ||
| 474 | PROJ - OBJNR | Object number | ||
| 475 | PROJ - PLFAZ | Project planned start date | ||
| 476 | PROJ - PLFAZ | Project planned start date | ||
| 477 | PROJ - PLSEZ | Project planned finish date | ||
| 478 | PROJ - PLSEZ | Project planned finish date | ||
| 479 | PROJ - PROFL | Project profile | ||
| 480 | PROJ - PSPNR | Current number for project or project item | ||
| 481 | PROJ - SCPRF | Profile for WBS scheduling | ||
| 482 | PROJ - SCPRF | Profile for WBS scheduling | ||
| 483 | PROJ - SCPRF | Profile for WBS scheduling | ||
| 484 | PROJ - SPROG | PROJ-SPROG | ||
| 485 | PROJ - ZTEHT | Time unit in time scheduling | ||
| 486 | PROJ2_INC - OBJNR | Object number | ||
| 487 | PROJ2_INC - ZTEHT | Time unit in time scheduling | ||
| 488 | PROJ2_INC - SPROG | PROJ2_INC-SPROG | ||
| 489 | PROJ2_INC - SCPRF | Profile for WBS scheduling | ||
| 490 | PROJ2_INC - SCPRF | Profile for WBS scheduling | ||
| 491 | PROJ2_INC - SCPRF | Profile for WBS scheduling | ||
| 492 | PROJ2_INC - PROFL | Project profile | ||
| 493 | PROJ2_INC - PLSEZ | Project planned finish date | ||
| 494 | PROJ2_INC - PLSEZ | Project planned finish date | ||
| 495 | PROJ2_INC - EPROG | PROJ2_INC-EPROG | ||
| 496 | PROJ2_INC - OBJNR | Object number | ||
| 497 | PROJ2_INC - PLFAZ | Project planned start date | ||
| 498 | PROJ2_INC - PLFAZ | Project planned start date | ||
| 499 | PROJ_INC - PROFL | Project profile | ||
| 500 | PROJ_INC - SCPRF | Profile for WBS scheduling |