Table/Structure Field list used by SAP ABAP Class CL_PPH_HANA_ACCESS_MATERIAL (Get Material Master MT61D and CM61B)
SAP ABAP Class
CL_PPH_HANA_ACCESS_MATERIAL (Get Material Master MT61D and CM61B) is using
pages: 1 2
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | EMARA - ATTYP | Material Category | ||
| 2 | EMARA - BFLME | Generic Material with Logistical Variants | ||
| 3 | EMARA - BSTME | Order unit | ||
| 4 | EMARA - CUOBF | Internal object number | ||
| 5 | EMARA - DISST | Low-level code | ||
| 6 | EMARA - DISST | Low-level code | ||
| 7 | EMARA - KZEFF | Assign effectivity parameter values/ override change numbers | ||
| 8 | EMARA - KZKFG | Configurable Material | ||
| 9 | EMARA - KZREV | Indicator: revision level has been assigned to the material | ||
| 10 | EMARA - KZWSM | Units of measure usage | ||
| 11 | EMARA - MATKL | Material Group | ||
| 12 | EMARA - MEINS | Base Unit of Measure | ||
| 13 | EMARA - MEINS | Base Unit of Measure | ||
| 14 | EMARA - MFRNR | Manufacturer number | ||
| 15 | EMARA - MFRPN | Manufacturer Part Number | ||
| 16 | EMARA - MPROF | Mfr part profile | ||
| 17 | EMARA - MSTAE | Cross-Plant Material Status | ||
| 18 | EMARA - MSTAE | Cross-Plant Material Status | ||
| 19 | EMARA - MSTDE | Date from which the cross-plant material status is valid | ||
| 20 | EMARA - MTART | Material type | ||
| 21 | EMARA - SATNR | Cross-Plant Configurable Material | ||
| 22 | EMARA - SERLV | Level of Explicitness for Serial Number | ||
| 23 | EMARA - SPART | Division | ||
| 24 | EMARC - AHDIS | MRP relevancy for dependent requirements | ||
| 25 | EMARC - ALTSL | Method for Selecting Alternative Bills of Material | ||
| 26 | EMARC - APOKZ | Indicator: Is material relevant for APO | ||
| 27 | EMARC - AUFTL | Splitting Indicator | ||
| 28 | EMARC - AUSDT | Effective-out date | ||
| 29 | EMARC - AUSME | Unit of issue | ||
| 30 | EMARC - AUSSS | Assembly scrap in percent | ||
| 31 | EMARC - AUTRU | Reset forecast model automatically | ||
| 32 | EMARC - BASMG | Base quantity | ||
| 33 | EMARC - BASMG | Base quantity | ||
| 34 | EMARC - BEARZ | Processing time | ||
| 35 | EMARC - BEARZ | Processing time | ||
| 36 | EMARC - BESKZ | Procurement Type | ||
| 37 | EMARC - BESKZ | Procurement Type | ||
| 38 | EMARC - BSTFE | Fixed lot size | ||
| 39 | EMARC - BSTFE | Fixed lot size | ||
| 40 | EMARC - BSTMA | Maximum lot size | ||
| 41 | EMARC - BSTMA | Maximum lot size | ||
| 42 | EMARC - BSTMI | Minimum lot size | ||
| 43 | EMARC - BSTMI | Minimum lot size | ||
| 44 | EMARC - BSTRF | Rounding value for purchase order quantity | ||
| 45 | EMARC - BWESB | Valuated Goods Receipt Blocked Stock | ||
| 46 | EMARC - BWSCL | Source of Supply | ||
| 47 | EMARC - CUOBJ | Internal object number | ||
| 48 | EMARC - CUOBV | Internal object number of configurable material for planning | ||
| 49 | EMARC - DIBER | Indicator: MRP area exists | ||
| 50 | EMARC - DISGR | MRP Group | ||
| 51 | EMARC - DISLS | Lot size (materials planning) | ||
| 52 | EMARC - DISMM | MRP Type | ||
| 53 | EMARC - DISMM | MRP Type | ||
| 54 | EMARC - DISPO | MRP controller | ||
| 55 | EMARC - DISPO | MRP controller | ||
| 56 | EMARC - DISPO | MRP controller | ||
| 57 | EMARC - DPLFS | Fair share rule | ||
| 58 | EMARC - DPLHO | Deployment horizon in days | ||
| 59 | EMARC - DPLPU | Indicator: push distribution | ||
| 60 | EMARC - DZEIT | In-house production time | ||
| 61 | EMARC - DZEIT | In-house production time | ||
| 62 | EMARC - EISBE | Safety stock | ||
| 63 | EMARC - EISBE | Safety stock | ||
| 64 | EMARC - EISLO | Minimum Safety Stock | ||
| 65 | EMARC - EISLO | Minimum Safety Stock | ||
| 66 | EMARC - EKGRP | Purchasing group | ||
| 67 | EMARC - EPRIO | Stock determination group | ||
| 68 | EMARC - EXPME | Unit of measure for commodity code (foreign trade) | ||
| 69 | EMARC - FABKZ | Indicator: Item Relevant to JIT Delivery Schedules | ||
| 70 | EMARC - FEVOR | Production Supervisor | ||
| 71 | EMARC - FHORI | Scheduling Margin Key for Floats | ||
| 72 | EMARC - FRTME | Production unit | ||
| 73 | EMARC - FXHOR | Planning time fence | ||
| 74 | EMARC - INSMK | Post to Inspection Stock | ||
| 75 | EMARC - KZAUS | Discontinuation indicator | ||
| 76 | EMARC - KZBED | Indicator for Requirements Grouping | ||
| 77 | EMARC - KZDIE | Indicator: MRP controller is buyer (deactivated) | ||
| 78 | EMARC - KZKFK | Indicator: take correction factors into account | ||
| 79 | EMARC - KZPSP | Indicator for cross-project material | ||
| 80 | EMARC - LAGPR | Storage costs indicator | ||
| 81 | EMARC - LFRHY | Planning cycle | ||
| 82 | EMARC - LGFSB | Default storage location for external procurement | ||
| 83 | EMARC - LGPRO | Issue storage location | ||
| 84 | EMARC - LGRAD | Service level | ||
| 85 | EMARC - LOSFX | Ordering costs | ||
| 86 | EMARC - LVORM | Flag Material for Deletion at Plant Level | ||
| 87 | EMARC - MAABC | ABC indicator | ||
| 88 | EMARC - MABST | Maximum stock level | ||
| 89 | EMARC - MABST | Maximum stock level | ||
| 90 | EMARC - MDACH | Action control: planned order processing | ||
| 91 | EMARC - MINBE | Reorder point | ||
| 92 | EMARC - MINBE | Reorder point | ||
| 93 | EMARC - MISKZ | Mixed MRP indicator | ||
| 94 | EMARC - MMSTA | Plant-Specific Material Status | ||
| 95 | EMARC - MMSTA | Plant-Specific Material Status | ||
| 96 | EMARC - MMSTA | Plant-Specific Material Status | ||
| 97 | EMARC - MMSTD | Date from which the plant-specific material status is valid | ||
| 98 | EMARC - MRPPP | PPC planning calendar | ||
| 99 | EMARC - MTVFP | Checking Group for Availability Check | ||
| 100 | EMARC - NFMAT | Follow-up material | ||
| 101 | EMARC - PERIV | Fiscal Year Variant | ||
| 102 | EMARC - PERIV | Fiscal Year Variant | ||
| 103 | EMARC - PERKZ | Period indicator | ||
| 104 | EMARC - PERKZ | Period indicator | ||
| 105 | EMARC - PFREI | Indicator: automatic fixing of planned orders | ||
| 106 | EMARC - PLIFZ | Planned delivery time in days | ||
| 107 | EMARC - PLIFZ | Planned delivery time in days | ||
| 108 | EMARC - PRCTR | Profit Center | ||
| 109 | EMARC - PSTAT | Maintenance status | ||
| 110 | EMARC - PSTAT | Maintenance status | ||
| 111 | EMARC - QMATV | Inspection Setup Exists for Material/Plant | ||
| 112 | EMARC - RDPRF | Rounding Profile | ||
| 113 | EMARC - RESVP | Period of adjustment for planned independent requirements | ||
| 114 | EMARC - RUEZT | Setup and teardown time | ||
| 115 | EMARC - RUEZT | Setup and teardown time | ||
| 116 | EMARC - RWPRO | Range of coverage profile | ||
| 117 | EMARC - SAUFT | Ind.: Repetitive mfg allowed | ||
| 118 | EMARC - SBDKZ | Dependent requirements ind. for individual and coll. reqmts | ||
| 119 | EMARC - SCHGT | Indicator: bulk material | ||
| 120 | EMARC - SERNP | Serial Number Profile | ||
| 121 | EMARC - SFEPR | Repetitive manufacturing profile | ||
| 122 | EMARC - SHFLG | Safety time indicator (with or without safety time) | ||
| 123 | EMARC - SHPRO | Period profile for safety time | ||
| 124 | EMARC - SHZET | Safety time (in workdays) | ||
| 125 | EMARC - SOBSL | Special procurement type | ||
| 126 | EMARC - SOBSL | Special procurement type | ||
| 127 | EMARC - STDPD | Configurable material | ||
| 128 | EMARC - STRGR | Planning strategy group | ||
| 129 | EMARC - TAKZT | Takt time | ||
| 130 | EMARC - TRAME | Stock in transit | ||
| 131 | EMARC - TRANZ | Interoperation time | ||
| 132 | EMARC - TRANZ | Interoperation time | ||
| 133 | EMARC - UMLMC | Stock in transfer (plant to plant) | ||
| 134 | EMARC - USEQU | Quota arrangement usage | ||
| 135 | EMARC - VINT1 | Consumption period: backward | ||
| 136 | EMARC - VINT2 | Consumption period: forward | ||
| 137 | EMARC - VRBDT | To date of the material to be copied for consumption | ||
| 138 | EMARC - VRBFK | Multiplier for reference material for consumption | ||
| 139 | EMARC - VRBMT | Reference material for consumption | ||
| 140 | EMARC - VRBWK | Reference plant for consumption | ||
| 141 | EMARC - VRMOD | Consumption mode | ||
| 142 | EMARC - VSPVB | Proposed Supply Area in Material Master Record | ||
| 143 | EMARC - WEBAZ | Goods receipt processing time in days | ||
| 144 | EMARC - WEBAZ | Goods receipt processing time in days | ||
| 145 | EMARC - WZEIT | Total replenishment lead time (in workdays) | ||
| 146 | EMARC - XCHPF | Batch management requirement indicator | ||
| 147 | EMARC1 - ALTSL | Method for Selecting Alternative Bills of Material | ||
| 148 | EMARC1 - AUSDT | Effective-out date | ||
| 149 | EMARC1 - AUSME | Unit of issue | ||
| 150 | EMARC1 - AUSSS | Assembly scrap in percent | ||
| 151 | EMARC1 - BASMG | Base quantity | ||
| 152 | EMARC1 - BASMG | Base quantity | ||
| 153 | EMARC1 - BEARZ | Processing time | ||
| 154 | EMARC1 - BEARZ | Processing time | ||
| 155 | EMARC1 - BESKZ | Procurement Type | ||
| 156 | EMARC1 - BESKZ | Procurement Type | ||
| 157 | EMARC1 - BSTFE | Fixed lot size | ||
| 158 | EMARC1 - BSTFE | Fixed lot size | ||
| 159 | EMARC1 - BSTMA | Maximum lot size | ||
| 160 | EMARC1 - BSTMA | Maximum lot size | ||
| 161 | EMARC1 - BSTMI | Minimum lot size | ||
| 162 | EMARC1 - BSTMI | Minimum lot size | ||
| 163 | EMARC1 - BSTRF | Rounding value for purchase order quantity | ||
| 164 | EMARC1 - DISLS | Lot size (materials planning) | ||
| 165 | EMARC1 - DISMM | MRP Type | ||
| 166 | EMARC1 - DISMM | MRP Type | ||
| 167 | EMARC1 - DISPO | MRP controller | ||
| 168 | EMARC1 - DISPO | MRP controller | ||
| 169 | EMARC1 - DISPO | MRP controller | ||
| 170 | EMARC1 - DZEIT | In-house production time | ||
| 171 | EMARC1 - DZEIT | In-house production time | ||
| 172 | EMARC1 - EISBE | Safety stock | ||
| 173 | EMARC1 - EISBE | Safety stock | ||
| 174 | EMARC1 - EKGRP | Purchasing group | ||
| 175 | EMARC1 - FEVOR | Production Supervisor | ||
| 176 | EMARC1 - FHORI | Scheduling Margin Key for Floats | ||
| 177 | EMARC1 - INSMK | Post to Inspection Stock | ||
| 178 | EMARC1 - KZAUS | Discontinuation indicator | ||
| 179 | EMARC1 - KZBED | Indicator for Requirements Grouping | ||
| 180 | EMARC1 - KZDIE | Indicator: MRP controller is buyer (deactivated) | ||
| 181 | EMARC1 - LAGPR | Storage costs indicator | ||
| 182 | EMARC1 - LOSFX | Ordering costs | ||
| 183 | EMARC1 - LVORM | Flag Material for Deletion at Plant Level | ||
| 184 | EMARC1 - MAABC | ABC indicator | ||
| 185 | EMARC1 - MABST | Maximum stock level | ||
| 186 | EMARC1 - MABST | Maximum stock level | ||
| 187 | EMARC1 - MINBE | Reorder point | ||
| 188 | EMARC1 - MINBE | Reorder point | ||
| 189 | EMARC1 - MISKZ | Mixed MRP indicator | ||
| 190 | EMARC1 - MMSTA | Plant-Specific Material Status | ||
| 191 | EMARC1 - MMSTA | Plant-Specific Material Status | ||
| 192 | EMARC1 - MMSTA | Plant-Specific Material Status | ||
| 193 | EMARC1 - MMSTD | Date from which the plant-specific material status is valid | ||
| 194 | EMARC1 - NFMAT | Follow-up material | ||
| 195 | EMARC1 - PERKZ | Period indicator | ||
| 196 | EMARC1 - PERKZ | Period indicator | ||
| 197 | EMARC1 - PFREI | Indicator: automatic fixing of planned orders | ||
| 198 | EMARC1 - PLIFZ | Planned delivery time in days | ||
| 199 | EMARC1 - PLIFZ | Planned delivery time in days | ||
| 200 | EMARC1 - PSTAT | Maintenance status | ||
| 201 | EMARC1 - PSTAT | Maintenance status | ||
| 202 | EMARC1 - RUEZT | Setup and teardown time | ||
| 203 | EMARC1 - RUEZT | Setup and teardown time | ||
| 204 | EMARC1 - SBDKZ | Dependent requirements ind. for individual and coll. reqmts | ||
| 205 | EMARC1 - SOBSL | Special procurement type | ||
| 206 | EMARC1 - SOBSL | Special procurement type | ||
| 207 | EMARC1 - TRANZ | Interoperation time | ||
| 208 | EMARC1 - TRANZ | Interoperation time | ||
| 209 | EMARC1 - WEBAZ | Goods receipt processing time in days | ||
| 210 | EMARC1 - WEBAZ | Goods receipt processing time in days | ||
| 211 | EMARC1 - WZEIT | Total replenishment lead time (in workdays) | ||
| 212 | EMARC2 - AUFTL | Splitting Indicator | ||
| 213 | EMARC2 - BWSCL | Source of Supply | ||
| 214 | EMARC2 - EXPME | Unit of measure for commodity code (foreign trade) | ||
| 215 | EMARC2 - KZKFK | Indicator: take correction factors into account | ||
| 216 | EMARC2 - LGRAD | Service level | ||
| 217 | EMARC2 - MTVFP | Checking Group for Availability Check | ||
| 218 | EMARC2 - PERIV | Fiscal Year Variant | ||
| 219 | EMARC2 - PERIV | Fiscal Year Variant | ||
| 220 | EMARC2 - PRCTR | Profit Center | ||
| 221 | EMARC2 - USEQU | Quota arrangement usage | ||
| 222 | EMARC2 - XCHPF | Batch management requirement indicator | ||
| 223 | EMARC3 - AUTRU | Reset forecast model automatically | ||
| 224 | EMARC3 - CUOBJ | Internal object number | ||
| 225 | EMARC3 - CUOBV | Internal object number of configurable material for planning | ||
| 226 | EMARC3 - DISGR | MRP Group | ||
| 227 | EMARC3 - EPRIO | Stock determination group | ||
| 228 | EMARC3 - FRTME | Production unit | ||
| 229 | EMARC3 - FXHOR | Planning time fence | ||
| 230 | EMARC3 - LFRHY | Planning cycle | ||
| 231 | EMARC3 - LGFSB | Default storage location for external procurement | ||
| 232 | EMARC3 - LGPRO | Issue storage location | ||
| 233 | EMARC3 - MDACH | Action control: planned order processing | ||
| 234 | EMARC3 - MRPPP | PPC planning calendar | ||
| 235 | EMARC3 - QMATV | Inspection Setup Exists for Material/Plant | ||
| 236 | EMARC3 - RDPRF | Rounding Profile | ||
| 237 | EMARC3 - RESVP | Period of adjustment for planned independent requirements | ||
| 238 | EMARC3 - RWPRO | Range of coverage profile | ||
| 239 | EMARC3 - SAUFT | Ind.: Repetitive mfg allowed | ||
| 240 | EMARC3 - SCHGT | Indicator: bulk material | ||
| 241 | EMARC3 - SERNP | Serial Number Profile | ||
| 242 | EMARC3 - SFEPR | Repetitive manufacturing profile | ||
| 243 | EMARC3 - SHFLG | Safety time indicator (with or without safety time) | ||
| 244 | EMARC3 - SHZET | Safety time (in workdays) | ||
| 245 | EMARC3 - STDPD | Configurable material | ||
| 246 | EMARC3 - STRGR | Planning strategy group | ||
| 247 | EMARC3 - TAKZT | Takt time | ||
| 248 | EMARC3 - VINT1 | Consumption period: backward | ||
| 249 | EMARC3 - VINT2 | Consumption period: forward | ||
| 250 | EMARC3 - VRBDT | To date of the material to be copied for consumption | ||
| 251 | EMARC3 - VRBFK | Multiplier for reference material for consumption | ||
| 252 | EMARC3 - VRBMT | Reference material for consumption | ||
| 253 | EMARC3 - VRBWK | Reference plant for consumption | ||
| 254 | EMARC3 - VRMOD | Consumption mode | ||
| 255 | EMARC4 - AHDIS | MRP relevancy for dependent requirements | ||
| 256 | EMARC4 - APOKZ | Indicator: Is material relevant for APO | ||
| 257 | EMARC4 - DIBER | Indicator: MRP area exists | ||
| 258 | EMARC4 - DPLFS | Fair share rule | ||
| 259 | EMARC4 - DPLHO | Deployment horizon in days | ||
| 260 | EMARC4 - DPLPU | Indicator: push distribution | ||
| 261 | EMARC4 - EISLO | Minimum Safety Stock | ||
| 262 | EMARC4 - EISLO | Minimum Safety Stock | ||
| 263 | EMARC4 - FABKZ | Indicator: Item Relevant to JIT Delivery Schedules | ||
| 264 | EMARC4 - KZPSP | Indicator for cross-project material | ||
| 265 | EMARC4 - SHPRO | Period profile for safety time | ||
| 266 | EMARC4 - VSPVB | Proposed Supply Area in Material Master Record | ||
| 267 | EMBEW - BKLAS | Valuation Class | ||
| 268 | EMBEW - PEINH | Price unit | ||
| 269 | EMBEW - STPRS | Standard price | ||
| 270 | EMBEW - VERPR | Moving Average Price/Periodic Unit Price | ||
| 271 | EMBEW - VPRSV | Price control indicator | ||
| 272 | EMBEW1 - BKLAS | Valuation Class | ||
| 273 | EMBEW1 - PEINH | Price unit | ||
| 274 | EMBEW1 - STPRS | Standard price | ||
| 275 | EMBEW1 - VERPR | Moving Average Price/Periodic Unit Price | ||
| 276 | EMBEW1 - VPRSV | Price control indicator | ||
| 277 | MA61V - DISGR | MRP Group | ||
| 278 | MA61V - MATNR | Material Number | ||
| 279 | MA61V - MTART | Material type | ||
| 280 | MA61V - WERKS | Plant | ||
| 281 | MAKT - MAKTX | Material description | ||
| 282 | MAKT - MAKTX | Material description | ||
| 283 | MAKT - MAKTX | Material description | ||
| 284 | MAKT - MANDT | Client | ||
| 285 | MAKT - MATNR | Material Number | ||
| 286 | MAKT - MATNR | Material Number | ||
| 287 | MAKT - MATNR | Material Number | ||
| 288 | MAKT - SPRAS | Language Key | ||
| 289 | MAKT - SPRAS | Language Key | ||
| 290 | MAPRO - MATNR | Material Number | ||
| 291 | MAPRO - MATNR | Material Number | ||
| 292 | MAPRO - WERKS | Plant | ||
| 293 | MAPRO - WERKS | Plant | ||
| 294 | MARA - ATTYP | Material Category | ||
| 295 | MARA - BFLME | Generic Material with Logistical Variants | ||
| 296 | MARA - BSTME | Order unit | ||
| 297 | MARA - CUOBF | Internal object number | ||
| 298 | MARA - DISST | Low-level code | ||
| 299 | MARA - DISST | Low-level code | ||
| 300 | MARA - KZEFF | Assign effectivity parameter values/ override change numbers | ||
| 301 | MARA - KZKFG | Configurable Material | ||
| 302 | MARA - KZREV | Indicator: revision level has been assigned to the material | ||
| 303 | MARA - KZWSM | Units of measure usage | ||
| 304 | MARA - MATKL | Material Group | ||
| 305 | MARA - MATNR | Material Number | ||
| 306 | MARA - MATNR | Material Number | ||
| 307 | MARA - MEINS | Base Unit of Measure | ||
| 308 | MARA - MEINS | Base Unit of Measure | ||
| 309 | MARA - MFRNR | Manufacturer number | ||
| 310 | MARA - MFRPN | Manufacturer Part Number | ||
| 311 | MARA - MPROF | Mfr part profile | ||
| 312 | MARA - MSTAE | Cross-Plant Material Status | ||
| 313 | MARA - MSTAE | Cross-Plant Material Status | ||
| 314 | MARA - MSTDE | Date from which the cross-plant material status is valid | ||
| 315 | MARA - MTART | Material type | ||
| 316 | MARA - SATNR | Cross-Plant Configurable Material | ||
| 317 | MARA - SERLV | Level of Explicitness for Serial Number | ||
| 318 | MARA - SPART | Division | ||
| 319 | MARC - AHDIS | MRP relevancy for dependent requirements | ||
| 320 | MARC - ALTSL | Method for Selecting Alternative Bills of Material | ||
| 321 | MARC - APOKZ | Indicator: Is material relevant for APO | ||
| 322 | MARC - AUFTL | Splitting Indicator | ||
| 323 | MARC - AUSDT | Effective-out date | ||
| 324 | MARC - AUSME | Unit of issue | ||
| 325 | MARC - AUSSS | Assembly scrap in percent | ||
| 326 | MARC - AUTRU | Reset forecast model automatically | ||
| 327 | MARC - BASMG | Base quantity | ||
| 328 | MARC - BASMG | Base quantity | ||
| 329 | MARC - BEARZ | Processing time | ||
| 330 | MARC - BEARZ | Processing time | ||
| 331 | MARC - BESKZ | Procurement Type | ||
| 332 | MARC - BESKZ | Procurement Type | ||
| 333 | MARC - BSTFE | Fixed lot size | ||
| 334 | MARC - BSTFE | Fixed lot size | ||
| 335 | MARC - BSTMA | Maximum lot size | ||
| 336 | MARC - BSTMA | Maximum lot size | ||
| 337 | MARC - BSTMI | Minimum lot size | ||
| 338 | MARC - BSTMI | Minimum lot size | ||
| 339 | MARC - BSTRF | Rounding value for purchase order quantity | ||
| 340 | MARC - BWESB | Valuated Goods Receipt Blocked Stock | ||
| 341 | MARC - BWSCL | Source of Supply | ||
| 342 | MARC - CUOBJ | Internal object number | ||
| 343 | MARC - CUOBV | Internal object number of configurable material for planning | ||
| 344 | MARC - DIBER | Indicator: MRP area exists | ||
| 345 | MARC - DISGR | MRP Group | ||
| 346 | MARC - DISLS | Lot size (materials planning) | ||
| 347 | MARC - DISMM | MRP Type | ||
| 348 | MARC - DISMM | MRP Type | ||
| 349 | MARC - DISPO | MRP controller | ||
| 350 | MARC - DISPO | MRP controller | ||
| 351 | MARC - DISPO | MRP controller | ||
| 352 | MARC - DPLFS | Fair share rule | ||
| 353 | MARC - DPLHO | Deployment horizon in days | ||
| 354 | MARC - DPLPU | Indicator: push distribution | ||
| 355 | MARC - DZEIT | In-house production time | ||
| 356 | MARC - DZEIT | In-house production time | ||
| 357 | MARC - EISBE | Safety stock | ||
| 358 | MARC - EISBE | Safety stock | ||
| 359 | MARC - EISLO | Minimum Safety Stock | ||
| 360 | MARC - EISLO | Minimum Safety Stock | ||
| 361 | MARC - EKGRP | Purchasing group | ||
| 362 | MARC - EPRIO | Stock determination group | ||
| 363 | MARC - EXPME | Unit of measure for commodity code (foreign trade) | ||
| 364 | MARC - FABKZ | Indicator: Item Relevant to JIT Delivery Schedules | ||
| 365 | MARC - FEVOR | Production Supervisor | ||
| 366 | MARC - FHORI | Scheduling Margin Key for Floats | ||
| 367 | MARC - FRTME | Production unit | ||
| 368 | MARC - FXHOR | Planning time fence | ||
| 369 | MARC - INSMK | Post to Inspection Stock | ||
| 370 | MARC - KZAUS | Discontinuation indicator | ||
| 371 | MARC - KZBED | Indicator for Requirements Grouping | ||
| 372 | MARC - KZDIE | Indicator: MRP controller is buyer (deactivated) | ||
| 373 | MARC - KZKFK | Indicator: take correction factors into account | ||
| 374 | MARC - KZPSP | Indicator for cross-project material | ||
| 375 | MARC - LAGPR | Storage costs indicator | ||
| 376 | MARC - LFRHY | Planning cycle | ||
| 377 | MARC - LGFSB | Default storage location for external procurement | ||
| 378 | MARC - LGPRO | Issue storage location | ||
| 379 | MARC - LGRAD | Service level | ||
| 380 | MARC - LOSFX | Ordering costs | ||
| 381 | MARC - LVORM | Flag Material for Deletion at Plant Level | ||
| 382 | MARC - MAABC | ABC indicator | ||
| 383 | MARC - MABST | Maximum stock level | ||
| 384 | MARC - MABST | Maximum stock level | ||
| 385 | MARC - MATNR | Material Number | ||
| 386 | MARC - MATNR | Material Number | ||
| 387 | MARC - MATNR | Material Number | ||
| 388 | MARC - MATNR | Material Number | ||
| 389 | MARC - MDACH | Action control: planned order processing | ||
| 390 | MARC - MINBE | Reorder point | ||
| 391 | MARC - MINBE | Reorder point | ||
| 392 | MARC - MISKZ | Mixed MRP indicator | ||
| 393 | MARC - MMSTA | Plant-Specific Material Status | ||
| 394 | MARC - MMSTA | Plant-Specific Material Status | ||
| 395 | MARC - MMSTA | Plant-Specific Material Status | ||
| 396 | MARC - MMSTD | Date from which the plant-specific material status is valid | ||
| 397 | MARC - MRPPP | PPC planning calendar | ||
| 398 | MARC - MTVFP | Checking Group for Availability Check | ||
| 399 | MARC - NFMAT | Follow-up material | ||
| 400 | MARC - PERIV | Fiscal Year Variant | ||
| 401 | MARC - PERIV | Fiscal Year Variant | ||
| 402 | MARC - PERKZ | Period indicator | ||
| 403 | MARC - PERKZ | Period indicator | ||
| 404 | MARC - PFREI | Indicator: automatic fixing of planned orders | ||
| 405 | MARC - PLIFZ | Planned delivery time in days | ||
| 406 | MARC - PLIFZ | Planned delivery time in days | ||
| 407 | MARC - PRCTR | Profit Center | ||
| 408 | MARC - PSTAT | Maintenance status | ||
| 409 | MARC - PSTAT | Maintenance status | ||
| 410 | MARC - QMATV | Inspection Setup Exists for Material/Plant | ||
| 411 | MARC - RDPRF | Rounding Profile | ||
| 412 | MARC - RESVP | Period of adjustment for planned independent requirements | ||
| 413 | MARC - RUEZT | Setup and teardown time | ||
| 414 | MARC - RUEZT | Setup and teardown time | ||
| 415 | MARC - RWPRO | Range of coverage profile | ||
| 416 | MARC - SAUFT | Ind.: Repetitive mfg allowed | ||
| 417 | MARC - SBDKZ | Dependent requirements ind. for individual and coll. reqmts | ||
| 418 | MARC - SCHGT | Indicator: bulk material | ||
| 419 | MARC - SERNP | Serial Number Profile | ||
| 420 | MARC - SFEPR | Repetitive manufacturing profile | ||
| 421 | MARC - SHFLG | Safety time indicator (with or without safety time) | ||
| 422 | MARC - SHPRO | Period profile for safety time | ||
| 423 | MARC - SHZET | Safety time (in workdays) | ||
| 424 | MARC - SOBSL | Special procurement type | ||
| 425 | MARC - SOBSL | Special procurement type | ||
| 426 | MARC - STDPD | Configurable material | ||
| 427 | MARC - STRGR | Planning strategy group | ||
| 428 | MARC - TAKZT | Takt time | ||
| 429 | MARC - TRAME | Stock in transit | ||
| 430 | MARC - TRANZ | Interoperation time | ||
| 431 | MARC - TRANZ | Interoperation time | ||
| 432 | MARC - UMLMC | Stock in transfer (plant to plant) | ||
| 433 | MARC - USEQU | Quota arrangement usage | ||
| 434 | MARC - VINT1 | Consumption period: backward | ||
| 435 | MARC - VINT2 | Consumption period: forward | ||
| 436 | MARC - VRBDT | To date of the material to be copied for consumption | ||
| 437 | MARC - VRBFK | Multiplier for reference material for consumption | ||
| 438 | MARC - VRBMT | Reference material for consumption | ||
| 439 | MARC - VRBWK | Reference plant for consumption | ||
| 440 | MARC - VRMOD | Consumption mode | ||
| 441 | MARC - VSPVB | Proposed Supply Area in Material Master Record | ||
| 442 | MARC - WEBAZ | Goods receipt processing time in days | ||
| 443 | MARC - WEBAZ | Goods receipt processing time in days | ||
| 444 | MARC - WERKS | Plant | ||
| 445 | MARC - WERKS | Plant | ||
| 446 | MARC - WERKS | Plant | ||
| 447 | MARC - WERKS | Plant | ||
| 448 | MARC - WZEIT | Total replenishment lead time (in workdays) | ||
| 449 | MARC - XCHPF | Batch management requirement indicator | ||
| 450 | MBEW - BKLAS | Valuation Class | ||
| 451 | MBEW - BWKEY | Valuation area | ||
| 452 | MBEW - MATNR | Material Number | ||
| 453 | MBEW - PEINH | Price unit | ||
| 454 | MBEW - STPRS | Standard price | ||
| 455 | MBEW - VERPR | Moving Average Price/Periodic Unit Price | ||
| 456 | MBEW - VPRSV | Price control indicator | ||
| 457 | MDLG - BERID | MRP Area | ||
| 458 | MDLG - LGORT | MRP Area Location | ||
| 459 | MDLG - WERKS | Plant | ||
| 460 | MDLL - BERID | MRP Area | ||
| 461 | MDLL - LBEAR | MRP area: Subcontractor | ||
| 462 | MDLL - WERKS | Plant | ||
| 463 | MDLV - BERID | MRP Area | ||
| 464 | MDLV - BERID | MRP Area | ||
| 465 | MDLV - BERTX | MRP area text | ||
| 466 | MDLV - BERTY | Type of MRP area | ||
| 467 | MDLV - BERTY | Type of MRP area | ||
| 468 | MDLV - ORTZG | Receiving storage location | ||
| 469 | MDLV - WERZG | Plant | ||
| 470 | MDLV - WERZG | Plant | ||
| 471 | MDMA - AHDIS | MRP relevancy for dependent requirements | ||
| 472 | MDMA - AUSSS | Assembly scrap in percent | ||
| 473 | MDMA - BERID | MRP Area | ||
| 474 | MDMA - BERID | MRP Area | ||
| 475 | MDMA - BSTFE | Fixed lot size | ||
| 476 | MDMA - BSTMA | Maximum lot size | ||
| 477 | MDMA - BSTMI | Minimum lot size | ||
| 478 | MDMA - BSTRF | Rounding value for purchase order quantity | ||
| 479 | MDMA - DISGR | MRP Group | ||
| 480 | MDMA - DISLS | Lot size (materials planning) | ||
| 481 | MDMA - DISMM | MRP Type | ||
| 482 | MDMA - DISPO | MRP controller | ||
| 483 | MDMA - DISPO | MRP controller | ||
| 484 | MDMA - EISBE | Safety stock | ||
| 485 | MDMA - FXHOR | Planning time fence | ||
| 486 | MDMA - LAGPR | Storage costs indicator | ||
| 487 | MDMA - LFRHY | Planning cycle | ||
| 488 | MDMA - LGFSB | Default storage location for external procurement | ||
| 489 | MDMA - LGPRO | Issue storage location | ||
| 490 | MDMA - LOEKZ | Deletion Indicator | ||
| 491 | MDMA - LOSFX | Ordering costs | ||
| 492 | MDMA - MABST | Maximum stock level | ||
| 493 | MDMA - MATNR | Material Number | ||
| 494 | MDMA - MATNR | Material Number | ||
| 495 | MDMA - MINBE | Reorder point | ||
| 496 | MDMA - MRPPP | PPC planning calendar | ||
| 497 | MDMA - PLIFZ | Planned delivery time in days | ||
| 498 | MDMA - PLIFZX | Consider Planned Delivery Time of the MRP Area | ||
| 499 | MDMA - PSTAT | Maintenance status | ||
| 500 | MDMA - RDPRF | Rounding Profile |