Table/Structure Field list used by SAP ABAP Class CL_DPR_ENTITY_LINK (Development Projects: Link Between Role and Entity)
SAP ABAP Class
CL_DPR_ENTITY_LINK (Development Projects: Link Between Role and Entity) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | BAL_S_CONT - TABNAME | Application Log: Context: DDIC structure name | ||
| 2 | BAL_S_CONT - VALUE | Application Log: Context data | ||
| 3 | CGPL_ATTR_INCL - PLANFINISH | Planned Finish Date | ||
| 4 | CGPL_ATTR_INCL - PLANSTART | Planned start date | ||
| 5 | CGPL_MESSAGE_CONTEXT - GUID | CGPL_MESSAGE_CONTEXT-GUID | ||
| 6 | CGPL_MESSAGE_CONTEXT - OBJECT_TYPE | Object Type in Project Planning | ||
| 7 | DPR_ENTITY_LINK - CLIENT | Client | ||
| 8 | DPR_ENTITY_LINK - ENTITY_GUID | Application Object GUID | ||
| 9 | DPR_TS_BUPA_LINK_CHG - WORK_EFFORT | Assigned Effort | ||
| 10 | DPR_TS_BUPA_LINK_CHG - WORK_UNIT | Unit | ||
| 11 | DPR_TS_BUPA_LINK_DIS - SCHEDULED_FINISH | Calculated Finish Date | ||
| 12 | DPR_TS_BUPA_LINK_DIS - SCHEDULED_FINISH | Calculated Finish Date | ||
| 13 | DPR_TS_BUPA_LINK_DIS - SCHEDULED_START | Calculated Start Date | ||
| 14 | DPR_TS_BUPA_LINK_DIS - SCHEDULED_START | Calculated Start Date | ||
| 15 | DPR_TS_BUPA_LINK_EXT - SCHEDULED_FINISH | Calculated Finish Date | ||
| 16 | DPR_TS_BUPA_LINK_EXT - SCHEDULED_FINISH | Calculated Finish Date | ||
| 17 | DPR_TS_BUPA_LINK_EXT - SCHEDULED_START | Calculated Start Date | ||
| 18 | DPR_TS_BUPA_LINK_EXT - SCHEDULED_START | Calculated Start Date | ||
| 19 | DPR_TS_BUPA_LINK_EXT - WORK_EFFORT | Assigned Effort | ||
| 20 | DPR_TS_BUPA_LINK_EXT - WORK_UNIT | Unit | ||
| 21 | DPR_TS_BUPA_LINK_INT - PLANFINISH | Planned Finish Date | ||
| 22 | DPR_TS_BUPA_LINK_INT - PLANSTART | Planned start date | ||
| 23 | DPR_TS_BUPA_REF_ATTR - PLANFINISH | Planned Finish Date | ||
| 24 | DPR_TS_BUPA_REF_ATTR - PLANSTART | Planned start date | ||
| 25 | DPR_TS_BUPA_REF_ATTR_NS - PLANFINISH | Planned Finish Date | ||
| 26 | DPR_TS_BUPA_REF_ATTR_NS - PLANSTART | Planned start date | ||
| 27 | DPR_TS_ENTITY_LINK_CHG - BEG_DATE | Start Date | ||
| 28 | DPR_TS_ENTITY_LINK_CHG - BEG_DATE | Start Date | ||
| 29 | DPR_TS_ENTITY_LINK_CHG - BEG_DATE | Start Date | ||
| 30 | DPR_TS_ENTITY_LINK_CHG - BEG_DATE | Start Date | ||
| 31 | DPR_TS_ENTITY_LINK_CHG - BEG_DATE | Start Date | ||
| 32 | DPR_TS_ENTITY_LINK_CHG - BEG_DATE | Start Date | ||
| 33 | DPR_TS_ENTITY_LINK_CHG - BEG_DATE | Start Date | ||
| 34 | DPR_TS_ENTITY_LINK_CHG - BEG_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 35 | DPR_TS_ENTITY_LINK_CHG - BEG_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 36 | DPR_TS_ENTITY_LINK_CHG - END_DATE | End Date | ||
| 37 | DPR_TS_ENTITY_LINK_CHG - END_DATE | End Date | ||
| 38 | DPR_TS_ENTITY_LINK_CHG - END_DATE | End Date | ||
| 39 | DPR_TS_ENTITY_LINK_CHG - END_DATE | End Date | ||
| 40 | DPR_TS_ENTITY_LINK_CHG - END_DATE | End Date | ||
| 41 | DPR_TS_ENTITY_LINK_CHG - END_DATE | End Date | ||
| 42 | DPR_TS_ENTITY_LINK_CHG - END_DATE | End Date | ||
| 43 | DPR_TS_ENTITY_LINK_CHG - END_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 44 | DPR_TS_ENTITY_LINK_CHG - END_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 45 | DPR_TS_ENTITY_LINK_CHG - ENTITY_TYPE | Object Type in Project Planning | ||
| 46 | DPR_TS_ENTITY_LINK_CHG - RESPONSIBLE | Responsibility | ||
| 47 | DPR_TS_ENTITY_LINK_CHG - RESPONSIBLE | Responsibility | ||
| 48 | DPR_TS_ENTITY_LINK_CHG - RESPONSIBLE | Responsibility | ||
| 49 | DPR_TS_ENTITY_LINK_CHG - WORK_EFFORT | Assigned Work | ||
| 50 | DPR_TS_ENTITY_LINK_CHG - WORK_UNIT | Unit | ||
| 51 | DPR_TS_ENTITY_LINK_DIS - SCHEDULED_FINISH | Calculated Finish Date | ||
| 52 | DPR_TS_ENTITY_LINK_DIS - SCHEDULED_FINISH | Calculated Finish Date | ||
| 53 | DPR_TS_ENTITY_LINK_DIS - SCHEDULED_FINISH | Calculated Finish Date | ||
| 54 | DPR_TS_ENTITY_LINK_DIS - SCHEDULED_START | Calculated Start Date | ||
| 55 | DPR_TS_ENTITY_LINK_DIS - SCHEDULED_START | Calculated Start Date | ||
| 56 | DPR_TS_ENTITY_LINK_DIS - SCHEDULED_START | Calculated Start Date | ||
| 57 | DPR_TS_ENTITY_LINK_DIS - WORK_UNIT_TEXT | Unit of Measurement Text (Maximum 10 Characters) | ||
| 58 | DPR_TS_ENTITY_LINK_EXT - BEG_DATE | Start Date | ||
| 59 | DPR_TS_ENTITY_LINK_EXT - BEG_DATE | Start Date | ||
| 60 | DPR_TS_ENTITY_LINK_EXT - BEG_DATE | Start Date | ||
| 61 | DPR_TS_ENTITY_LINK_EXT - BEG_DATE | Start Date | ||
| 62 | DPR_TS_ENTITY_LINK_EXT - BEG_DATE | Start Date | ||
| 63 | DPR_TS_ENTITY_LINK_EXT - BEG_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 64 | DPR_TS_ENTITY_LINK_EXT - BEG_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 65 | DPR_TS_ENTITY_LINK_EXT - END_DATE | End Date | ||
| 66 | DPR_TS_ENTITY_LINK_EXT - END_DATE | End Date | ||
| 67 | DPR_TS_ENTITY_LINK_EXT - END_DATE | End Date | ||
| 68 | DPR_TS_ENTITY_LINK_EXT - END_DATE | End Date | ||
| 69 | DPR_TS_ENTITY_LINK_EXT - END_DATE | End Date | ||
| 70 | DPR_TS_ENTITY_LINK_EXT - END_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 71 | DPR_TS_ENTITY_LINK_EXT - END_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 72 | DPR_TS_ENTITY_LINK_EXT - ENTITY_TYPE | Object Type in Project Planning | ||
| 73 | DPR_TS_ENTITY_LINK_EXT - RESPONSIBLE | Responsibility | ||
| 74 | DPR_TS_ENTITY_LINK_EXT - RESPONSIBLE | Responsibility | ||
| 75 | DPR_TS_ENTITY_LINK_EXT - RESPONSIBLE | Responsibility | ||
| 76 | DPR_TS_ENTITY_LINK_EXT - SCHEDULED_FINISH | Calculated Finish Date | ||
| 77 | DPR_TS_ENTITY_LINK_EXT - SCHEDULED_FINISH | Calculated Finish Date | ||
| 78 | DPR_TS_ENTITY_LINK_EXT - SCHEDULED_FINISH | Calculated Finish Date | ||
| 79 | DPR_TS_ENTITY_LINK_EXT - SCHEDULED_START | Calculated Start Date | ||
| 80 | DPR_TS_ENTITY_LINK_EXT - SCHEDULED_START | Calculated Start Date | ||
| 81 | DPR_TS_ENTITY_LINK_EXT - SCHEDULED_START | Calculated Start Date | ||
| 82 | DPR_TS_ENTITY_LINK_EXT - WORK_EFFORT | Assigned Work | ||
| 83 | DPR_TS_ENTITY_LINK_EXT - WORK_UNIT | Unit | ||
| 84 | DPR_TS_ENTITY_LINK_EXT - WORK_UNIT_TEXT | Unit of Measurement Text (Maximum 10 Characters) | ||
| 85 | DPR_TS_ENTITY_LINK_INT - BEG_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 86 | DPR_TS_ENTITY_LINK_INT - BEG_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 87 | DPR_TS_ENTITY_LINK_INT - END_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 88 | DPR_TS_ENTITY_LINK_INT - END_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 89 | DPR_TS_ENTITY_LINK_INT - ENTITY_GUID | Application Object GUID | ||
| 90 | DPR_TS_ENTITY_LINK_INT - ENTITY_GUID | Application Object GUID | ||
| 91 | DPR_TS_ENTITY_LINK_INT - ENTITY_GUID | Application Object GUID | ||
| 92 | DPR_TS_ENTITY_LINK_INT - ENTITY_GUID | Application Object GUID | ||
| 93 | DPR_TS_ENTITY_LINK_INT - ENTITY_GUID | Application Object GUID | ||
| 94 | DPR_TS_ENTITY_LINK_INT - ENTITY_TYPE | Object Type in Project Planning | ||
| 95 | DPR_TS_ENTITY_LINK_INT - ENTITY_TYPE | Object Type in Project Planning | ||
| 96 | DPR_TS_ENTITY_LINK_INT - ENTITY_TYPE | Object Type in Project Planning | ||
| 97 | DPR_TS_ENTITY_LINK_INT - GUID | Application Object GUID | ||
| 98 | DPR_TS_ENTITY_LINK_INT - GUID | Application Object GUID | ||
| 99 | DPR_TS_ENTITY_LINK_INT - PLANFINISH | Planned Finish Date | ||
| 100 | DPR_TS_ENTITY_LINK_INT - PLANFINISH | Planned Finish Date | ||
| 101 | DPR_TS_ENTITY_LINK_INT - PLANFINISH | Planned Finish Date | ||
| 102 | DPR_TS_ENTITY_LINK_INT - PLANSTART | Planned start date | ||
| 103 | DPR_TS_ENTITY_LINK_INT - PLANSTART | Planned start date | ||
| 104 | DPR_TS_ENTITY_LINK_INT - PLANSTART | Planned start date | ||
| 105 | DPR_TS_ENTITY_LINK_INT - RESPONSIBLE | Responsibility | ||
| 106 | DPR_TS_ENTITY_LINK_INT - RESPONSIBLE | Responsibility | ||
| 107 | DPR_TS_ENTITY_LINK_INT - RESPONSIBLE | Responsibility | ||
| 108 | DPR_TS_ENTITY_LINK_INT - SORT_NUMBER | Sort Number | ||
| 109 | DPR_TS_ENTITY_LINK_INT - WORK_EFFORT | Assigned Work | ||
| 110 | DPR_TS_ENTITY_LINK_INT - WORK_UNIT | Unit | ||
| 111 | DPR_TS_ENTITY_LINK_INT - WORK_UNIT | Unit | ||
| 112 | DPR_TS_ENTITY_REF_ATTR - BEG_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 113 | DPR_TS_ENTITY_REF_ATTR - BEG_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 114 | DPR_TS_ENTITY_REF_ATTR - END_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 115 | DPR_TS_ENTITY_REF_ATTR - END_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 116 | DPR_TS_ENTITY_REF_ATTR - ENTITY_GUID | Application Object GUID | ||
| 117 | DPR_TS_ENTITY_REF_ATTR - ENTITY_GUID | Application Object GUID | ||
| 118 | DPR_TS_ENTITY_REF_ATTR - ENTITY_GUID | Application Object GUID | ||
| 119 | DPR_TS_ENTITY_REF_ATTR - ENTITY_GUID | Application Object GUID | ||
| 120 | DPR_TS_ENTITY_REF_ATTR - ENTITY_GUID | Application Object GUID | ||
| 121 | DPR_TS_ENTITY_REF_ATTR - ENTITY_TYPE | Object Type in Project Planning | ||
| 122 | DPR_TS_ENTITY_REF_ATTR - ENTITY_TYPE | Object Type in Project Planning | ||
| 123 | DPR_TS_ENTITY_REF_ATTR - ENTITY_TYPE | Object Type in Project Planning | ||
| 124 | DPR_TS_ENTITY_REF_ATTR - RESPONSIBLE | Responsibility | ||
| 125 | DPR_TS_ENTITY_REF_ATTR - RESPONSIBLE | Responsibility | ||
| 126 | DPR_TS_ENTITY_REF_ATTR - RESPONSIBLE | Responsibility | ||
| 127 | DPR_TS_ENTITY_REF_ATTR - SORT_NUMBER | Sort Number | ||
| 128 | DPR_TS_ENTITY_REF_ATTR - WORK_EFFORT | Assigned Work | ||
| 129 | DPR_TS_ENTITY_REF_ATTR - WORK_UNIT | Unit | ||
| 130 | DPR_TS_ENTITY_REF_ATTR - WORK_UNIT | Unit | ||
| 131 | DPR_TS_ENTITY_REF_ATTR_NS - BEG_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 132 | DPR_TS_ENTITY_REF_ATTR_NS - BEG_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 133 | DPR_TS_ENTITY_REF_ATTR_NS - END_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 134 | DPR_TS_ENTITY_REF_ATTR_NS - END_TMSTMP | UTC Time Stamp in Short Form (YYYYMMDDhhmmss)(with Con.Exit) | ||
| 135 | DPR_TS_ENTITY_REF_ATTR_NS - ENTITY_GUID | Application Object GUID | ||
| 136 | DPR_TS_ENTITY_REF_ATTR_NS - ENTITY_GUID | Application Object GUID | ||
| 137 | DPR_TS_ENTITY_REF_ATTR_NS - ENTITY_GUID | Application Object GUID | ||
| 138 | DPR_TS_ENTITY_REF_ATTR_NS - ENTITY_GUID | Application Object GUID | ||
| 139 | DPR_TS_ENTITY_REF_ATTR_NS - ENTITY_GUID | Application Object GUID | ||
| 140 | DPR_TS_ENTITY_REF_ATTR_NS - ENTITY_TYPE | Object Type in Project Planning | ||
| 141 | DPR_TS_ENTITY_REF_ATTR_NS - ENTITY_TYPE | Object Type in Project Planning | ||
| 142 | DPR_TS_ENTITY_REF_ATTR_NS - ENTITY_TYPE | Object Type in Project Planning | ||
| 143 | DPR_TS_ENTITY_REF_ATTR_NS - RESPONSIBLE | Responsibility | ||
| 144 | DPR_TS_ENTITY_REF_ATTR_NS - RESPONSIBLE | Responsibility | ||
| 145 | DPR_TS_ENTITY_REF_ATTR_NS - RESPONSIBLE | Responsibility | ||
| 146 | DPR_TS_ENTITY_REF_ATTR_NS - SORT_NUMBER | Sort Number | ||
| 147 | DPR_TS_ENTITY_REF_ATTR_NS - WORK_EFFORT | Assigned Work | ||
| 148 | DPR_TS_ENTITY_REF_ATTR_NS - WORK_UNIT | Unit | ||
| 149 | DPR_TS_ENTITY_REF_ATTR_NS - WORK_UNIT | Unit | ||
| 150 | DPR_TS_PART_CHG - WORK_EFFORT | Demand or Assigned Effort | ||
| 151 | DPR_TS_PART_CHG - WORK_UNIT | Unit for Demand or Effort | ||
| 152 | DPR_TS_PART_DIS - SCHEDULED_FINISH | Calculated Finish Date | ||
| 153 | DPR_TS_PART_DIS - SCHEDULED_FINISH | Calculated Finish Date | ||
| 154 | DPR_TS_PART_DIS - SCHEDULED_START | Calculated Start Date | ||
| 155 | DPR_TS_PART_DIS - SCHEDULED_START | Calculated Start Date | ||
| 156 | DPR_TS_PART_EXT - SCHEDULED_FINISH | Calculated Finish Date | ||
| 157 | DPR_TS_PART_EXT - SCHEDULED_FINISH | Calculated Finish Date | ||
| 158 | DPR_TS_PART_EXT - SCHEDULED_START | Calculated Start Date | ||
| 159 | DPR_TS_PART_EXT - SCHEDULED_START | Calculated Start Date | ||
| 160 | DPR_TS_PART_EXT - WORK_EFFORT | Demand or Assigned Effort | ||
| 161 | DPR_TS_PART_EXT - WORK_UNIT | Unit for Demand or Effort | ||
| 162 | DPR_TS_PART_INT - PLANFINISH | Planned Finish Date | ||
| 163 | DPR_TS_PART_INT - PLANSTART | Planned start date | ||
| 164 | DPR_TS_PLAN_ATTR - PLANFINISH | Planned Finish Date | ||
| 165 | DPR_TS_PLAN_ATTR - PLANFINISH | Planned Finish Date | ||
| 166 | DPR_TS_PLAN_ATTR - PLANFINISH | Planned Finish Date | ||
| 167 | DPR_TS_PLAN_ATTR - PLANSTART | Planned start date | ||
| 168 | DPR_TS_PLAN_ATTR - PLANSTART | Planned start date | ||
| 169 | DPR_TS_PLAN_ATTR - PLANSTART | Planned start date | ||
| 170 | DPR_TS_TASK_CHG - WORK_UNIT | Unit for Work | ||
| 171 | DPR_TS_TASK_DIS - SCHEDULED_FINISH_LATE | Latest Finish Date | ||
| 172 | DPR_TS_TASK_DIS - SCHEDULED_FINISH_LATE | Latest Finish Date | ||
| 173 | DPR_TS_TASK_DIS - SCHEDULED_START | Calculated Start Date | ||
| 174 | DPR_TS_TASK_DIS - SCHEDULED_START | Calculated Start Date | ||
| 175 | DPR_TS_TASK_EXT - SCHEDULED_FINISH_LATE | Latest Finish Date | ||
| 176 | DPR_TS_TASK_EXT - SCHEDULED_FINISH_LATE | Latest Finish Date | ||
| 177 | DPR_TS_TASK_EXT - SCHEDULED_START | Calculated Start Date | ||
| 178 | DPR_TS_TASK_EXT - SCHEDULED_START | Calculated Start Date | ||
| 179 | DPR_TS_TASK_EXT - WORK_UNIT | Unit for Work | ||
| 180 | DPR_TS_TASK_INT - PLANFINISH | Planned Finish Date | ||
| 181 | DPR_TS_TASK_INT - PLANSTART | Planned start date | ||
| 182 | SYST - LANGU | ABAP System Field: Language Key of Text Environment | ||
| 183 | SYST - MSGID | ABAP System Field: Message ID | ||
| 184 | SYST - MSGID | ABAP System Field: Message ID | ||
| 185 | SYST - MSGNO | ABAP System Field: Message Number | ||
| 186 | SYST - MSGNO | ABAP System Field: Message Number | ||
| 187 | SYST - MSGTY | ABAP System Field: Message Type | ||
| 188 | SYST - MSGTY | ABAP System Field: Message Type | ||
| 189 | SYST - MSGV1 | ABAP System Field: Message Variable | ||
| 190 | SYST - MSGV1 | ABAP System Field: Message Variable | ||
| 191 | SYST - MSGV2 | ABAP System Field: Message Variable | ||
| 192 | SYST - MSGV2 | ABAP System Field: Message Variable | ||
| 193 | SYST - MSGV3 | ABAP System Field: Message Variable | ||
| 194 | SYST - MSGV4 | ABAP System Field: Message Variable | ||
| 195 | TEXTPOOL - ENTRY | Language-dependent text in ABAP/4 text pool | ||
| 196 | TEXTPOOL - KEY | Text element key (number/selection name) |