Table/Structure Field list used by SAP ABAP Class CL_DPR_DB_API_TASK (Proj. Mgmt DB API: Task (DB))
SAP ABAP Class
CL_DPR_DB_API_TASK (Proj. Mgmt DB API: Task (DB)) is using
| # | Object Type | Object Name | Object Description | Note |
|---|---|---|---|---|
| 1 | ACO_USER_ATTRIBUTES - FULLNAME | String | ||
| 2 | CGPL_ATTR_INCL - CONSTRAINT_TIME | Constraint Date | ||
| 3 | CGPL_ATTR_INCL - CONSTRAINT_TIME | Constraint Date | ||
| 4 | CGPL_ATTR_INCL - CONSTR_TIME_FIN | Constraint Date | ||
| 5 | CGPL_ATTR_INCL - CONSTR_TIME_FIN | Constraint Date | ||
| 6 | CGPL_ATTR_INCL - DURATION | Duration of Execution | ||
| 7 | CGPL_ATTR_INCL - DURATION | Duration of Execution | ||
| 8 | CGPL_ATTR_INCL - DURATION | Duration of Execution | ||
| 9 | CGPL_ATTR_INCL - LATEST_FINISH | Latest finish date | ||
| 10 | CGPL_ATTR_INCL - LATEST_FINISH | Latest finish date | ||
| 11 | CGPL_ATTR_INCL - LATEST_START | Latest start | ||
| 12 | CGPL_ATTR_INCL - LATEST_START | Latest start | ||
| 13 | CGPL_ATTR_INCL - OBJECT_TYPE | Object Type in Project Planning | ||
| 14 | CGPL_ATTR_INCL - PLANFINISH | Planned Finish Date | ||
| 15 | CGPL_ATTR_INCL - PLANFINISH | Planned Finish Date | ||
| 16 | CGPL_ATTR_INCL - PLANFINISH | Planned Finish Date | ||
| 17 | CGPL_ATTR_INCL - PLANSTART | Planned start date | ||
| 18 | CGPL_ENTITY - GUID | Project Planning: 16-Character GUID for Projects and Activts | ||
| 19 | CGPL_ENTITY - GUID | Project Planning: 16-Character GUID for Projects and Activts | ||
| 20 | CGPL_ENTITY - OBJECT_TYPE | Object Type in Project Planning | ||
| 21 | CGPL_ENTITY - OBJECT_TYPE | Object Type in Project Planning | ||
| 22 | CGPL_HIERARCHY - GUID | Project Planning: 16-Character GUID for Projects and Activts | ||
| 23 | CGPL_HIERARCHY - GUID | Project Planning: 16-Character GUID for Projects and Activts | ||
| 24 | CGPL_HIERARCHY - UP | Project Planning: 16-Character GUID for Projects and Activts | ||
| 25 | CGPL_HIERARCHY - UP | Project Planning: 16-Character GUID for Projects and Activts | ||
| 26 | CGPL_RELATION - CALENDAR_ID | Factory Calendar | ||
| 27 | CGPL_RELATION - CALENDAR_ID | Factory Calendar | ||
| 28 | CGPL_RELATION - LAG_UNIT | Unit of Interval of Time Between Project Elements | ||
| 29 | CGPL_RELATION - LAG_UNIT | Unit of Interval of Time Between Project Elements | ||
| 30 | CGPL_RELATION - PREDEC_PROJECT | Project Planning: 16-Character GUID for Projects and Activts | ||
| 31 | CGPL_RELATION - PREDEC_TASK | Project Planning: 16-Character GUID for Projects and Activts | ||
| 32 | CGPL_RELATION - PREDEC_TASK | Project Planning: 16-Character GUID for Projects and Activts | ||
| 33 | CGPL_RELATION - RELATION_TYPE | Link Type | ||
| 34 | CGPL_RELATION - RELATION_TYPE | Link Type | ||
| 35 | CGPL_RELATION - SUCC_PROJECT | Project Planning: 16-Character GUID for Projects and Activts | ||
| 36 | CGPL_RELATION - SUCC_TASK | Project Planning: 16-Character GUID for Projects and Activts | ||
| 37 | CGPL_RELATION - SUCC_TASK | Project Planning: 16-Character GUID for Projects and Activts | ||
| 38 | CGPL_RELATION - TIME_LAG | Offset Between Project Elements | ||
| 39 | CGPL_RELATION - TIME_LAG | Offset Between Project Elements | ||
| 40 | CGPL_TEXT - GUID | Project Planning: 16-Character GUID for Projects and Activts | ||
| 41 | CGPL_TEXT - GUID | Project Planning: 16-Character GUID for Projects and Activts | ||
| 42 | CGPL_TEXT - GUID | Project Planning: 16-Character GUID for Projects and Activts | ||
| 43 | CGPL_TEXT - LANGU | Language Key | ||
| 44 | CGPL_TEXT - LANGU | Language Key | ||
| 45 | CGPL_TEXT - LANGU | Language Key | ||
| 46 | CGPL_TEXT - TEXT1 | Language-Dependent Short Text | ||
| 47 | CGPL_TEXT - TEXT1 | Language-Dependent Short Text | ||
| 48 | CGPL_TEXT - TEXT1 | Language-Dependent Short Text | ||
| 49 | DPR_OBJLINK_MPM - SOURCE_GUID_PROJ | Application Object GUID (Entity with Conversion Exit) | ||
| 50 | DPR_OBJLINK_MPM - SOURCE_GUID_PROJ | Application Object GUID (Entity with Conversion Exit) | ||
| 51 | DPR_OBJLINK_MPM - SOURCE_GUID_TASK | Application Object GUID (Entity with Conversion Exit) | ||
| 52 | DPR_OBJLINK_MPM - SOURCE_GUID_TASK | Application Object GUID (Entity with Conversion Exit) | ||
| 53 | DPR_OBJLINK_MPM - TARGET_GUID | Application Object GUID (Entity with Conversion Exit) | ||
| 54 | DPR_OBJLINK_MPM - TARGET_GUID | Application Object GUID (Entity with Conversion Exit) | ||
| 55 | DPR_TASK - GUID | Application Object GUID (Entity with Conversion Exit) | ||
| 56 | DPR_TASK - GUID | Application Object GUID (Entity with Conversion Exit) | ||
| 57 | DPR_TASK - GUID | Application Object GUID (Entity with Conversion Exit) | ||
| 58 | DPR_TASK - PROCESS | Process | ||
| 59 | DPR_TASK - SORT_NUMBER | Sort Number | ||
| 60 | DPR_TASK - SORT_NUMBER | Sort Number | ||
| 61 | DPR_TASK - TSK_TYPE | Task Type | ||
| 62 | DPR_TS_API_NAME_VALUE_PAIR - NAME | DPR_TS_API_NAME_VALUE_PAIR-NAME | ||
| 63 | DPR_TS_API_NAME_VALUE_PAIR - VALUE | DPR_TS_API_NAME_VALUE_PAIR-VALUE | ||
| 64 | DPR_TS_API_RELATIONSHIP - TARGET_TASK_GUID | Unique Object Key | ||
| 65 | DPR_TS_API_RELATIONSHIP - TARGET_TASK_GUID | Unique Object Key | ||
| 66 | DPR_TS_API_RELATIONSHIP - TASK_GUID | Unique Object Key | ||
| 67 | DPR_TS_API_RELATIONSHIP_KEY - TARGET_TASK_GUID | Unique Object Key | ||
| 68 | DPR_TS_API_RELATIONSHIP_KEY - TARGET_TASK_GUID | Unique Object Key | ||
| 69 | DPR_TS_API_RELATIONSHIP_KEY - TASK_GUID | Unique Object Key | ||
| 70 | DPR_TS_API_ROOT_OBJECT_KEY - GUID | Unique Object Key | ||
| 71 | DPR_TS_API_ROOT_OBJECT_KEY - GUID | Unique Object Key | ||
| 72 | DPR_TS_API_ROOT_OBJECT_KEY - GUID | Unique Object Key | ||
| 73 | DPR_TS_API_ROOT_OBJECT_KEY - GUID | Unique Object Key | ||
| 74 | DPR_TS_API_SEVERITY - MANUAL_SEVERITY_TEXT | Object Description (Long Text) | ||
| 75 | DPR_TS_API_SEVERITY - SEVERITY_GUID | Unique Object Key for Note | ||
| 76 | DPR_TS_API_SEVERITY_DATA - MANUAL_SEVERITY_TEXT | Object Description (Long Text) | ||
| 77 | DPR_TS_API_SEVERITY_KEY - SEVERITY_GUID | Unique Object Key for Note | ||
| 78 | DPR_TS_CGPL_ATTRIBUTES - GUID | Project Planning: 16-Character GUID for Projects and Activts | ||
| 79 | DPR_TS_CGPL_DATES_EXT - ACTUALFINISHDATE | Actual Finish | ||
| 80 | DPR_TS_CGPL_DATES_EXT - ACTUALSTARTDATE | Actual Start of the SAP ERP Object | ||
| 81 | DPR_TS_CGPL_DATES_EXT - CONSTRAINTDATE | Constraint Date | ||
| 82 | DPR_TS_CGPL_DATES_EXT - CONSTR_FINDATE | Constraint Date | ||
| 83 | DPR_TS_CGPL_DATES_EXT - FORECASTFINISHDATE | Forecasted Finish Date | ||
| 84 | DPR_TS_CGPL_DATES_EXT - FORECASTSTARTDATE | Forecasted Start Date | ||
| 85 | DPR_TS_GUID - GUID | Application Object GUID | ||
| 86 | DPR_TS_GUID - GUID | Application Object GUID | ||
| 87 | DPR_TS_GUID - GUID | Application Object GUID | ||
| 88 | DPR_TS_GUID - GUID | Application Object GUID | ||
| 89 | DPR_TS_GUID - GUID | Application Object GUID | ||
| 90 | DPR_TS_GUID - GUID | Application Object GUID | ||
| 91 | DPR_TS_GUID - GUID | Application Object GUID | ||
| 92 | DPR_TS_STATUS_EXT - ISTAT | System status | ||
| 93 | DPR_TS_STATUS_EXT - ISTAT | System status | ||
| 94 | DPR_TS_STATUS_EXT - OBJNR | GUID of a CRM Order Object | ||
| 95 | DPR_TS_STATUS_EXT - STATTXT | Concatenated Status Text of an Object | ||
| 96 | DPR_TS_TASK_ATTR - ACT_WRK_UNIT_EXT | Unit | ||
| 97 | DPR_TS_TASK_ATTR - PROCESS | Process | ||
| 98 | DPR_TS_TASK_ATTR - SORT_NUMBER | Sort Number | ||
| 99 | DPR_TS_TASK_ATTR - SORT_NUMBER | Sort Number | ||
| 100 | DPR_TS_TASK_ATTR - TSK_TYPE | Task Type | ||
| 101 | DPR_TS_TASK_ATTR - WORK_UNIT | Unit | ||
| 102 | DPR_TS_TASK_CHG - ACTUAL_FINISH | Actual Finish | ||
| 103 | DPR_TS_TASK_CHG - ACTUAL_START | Actual Start | ||
| 104 | DPR_TS_TASK_CHG - CALENDAR_ID | Calendar | ||
| 105 | DPR_TS_TASK_CHG - DESCRIPTION | Project Element Name | ||
| 106 | DPR_TS_TASK_CHG - FINISH_DATE_FIX | Fixed Predefined Finish Date | ||
| 107 | DPR_TS_TASK_CHG - FORECASTED_FINISH | Forecasted Finish Date | ||
| 108 | DPR_TS_TASK_CHG - FORECASTED_START | Forecasted Start Date | ||
| 109 | DPR_TS_TASK_CHG - START_DATE_FIX | Fixed Start Date | ||
| 110 | DPR_TS_TASK_DIS - ACT_WRK_UNIT_EXT_MSEHL | Description of Unit of Measurement for Confirmation | ||
| 111 | DPR_TS_TASK_DIS - ACT_WRK_UNIT_EXT_MSEHT | Unit of Measurement Text (Maximum 10 Characters) | ||
| 112 | DPR_TS_TASK_DIS - CALENDER_TEXT | Factory calendar name | ||
| 113 | DPR_TS_TASK_DIS - CHANGED_BY | Last Changed By | ||
| 114 | DPR_TS_TASK_DIS - CHANGED_BY_NAME | Name of Person Who Last Changed the Project Element | ||
| 115 | DPR_TS_TASK_DIS - CREATED_BY | Created By | ||
| 116 | DPR_TS_TASK_DIS - CREATED_BY_NAME | Name of Person Who Created the Project Element | ||
| 117 | DPR_TS_TASK_DIS - DURATION_UNIT | Time Unit for Execution Duration | ||
| 118 | DPR_TS_TASK_DIS - DURATION_UNIT_TEXT | Unit of Measurement Text (Maximum 10 Characters) | ||
| 119 | DPR_TS_TASK_DIS - GUID | Application Object GUID | ||
| 120 | DPR_TS_TASK_DIS - GUID | Application Object GUID | ||
| 121 | DPR_TS_TASK_DIS - GUID | Application Object GUID | ||
| 122 | DPR_TS_TASK_DIS - GUID | Application Object GUID | ||
| 123 | DPR_TS_TASK_DIS - ISTAT | System status | ||
| 124 | DPR_TS_TASK_DIS - PROCESS_TEXT | Process Description | ||
| 125 | DPR_TS_TASK_DIS - SCHEDULED_FINISH | Calculated Finish Date | ||
| 126 | DPR_TS_TASK_DIS - SCHEDULED_FINISH | Calculated Finish Date | ||
| 127 | DPR_TS_TASK_DIS - SCHEDULED_FINISH | Calculated Finish Date | ||
| 128 | DPR_TS_TASK_DIS - SCHEDULED_FINISH_LATE | Latest Finish Date | ||
| 129 | DPR_TS_TASK_DIS - SCHEDULED_FINISH_LATE | Latest Finish Date | ||
| 130 | DPR_TS_TASK_DIS - SCHEDULED_START | Calculated Start Date | ||
| 131 | DPR_TS_TASK_DIS - SCHEDULED_START_LATE | Latest Start Date | ||
| 132 | DPR_TS_TASK_DIS - SEVERITY_TEXT | Severity of Threshold Value Description | ||
| 133 | DPR_TS_TASK_DIS - STATTXT | Concatenated Status Text of an Object | ||
| 134 | DPR_TS_TASK_DIS - TSK_TYPE_TEXT | Text for Task Type | ||
| 135 | DPR_TS_TASK_DIS - WORK_UNIT_MSEHL | Description of Unit of Measure for Work | ||
| 136 | DPR_TS_TASK_DIS - WORK_UNIT_MSEHT | Unit of Measurement Text (Maximum 10 Characters) | ||
| 137 | DPR_TS_TASK_EXT - ACTUAL_FINISH | Actual Finish | ||
| 138 | DPR_TS_TASK_EXT - ACTUAL_START | Actual Start | ||
| 139 | DPR_TS_TASK_EXT - ACT_WRK_UNIT_EXT_MSEHL | Description of Unit of Measurement for Confirmation | ||
| 140 | DPR_TS_TASK_EXT - ACT_WRK_UNIT_EXT_MSEHT | Unit of Measurement Text (Maximum 10 Characters) | ||
| 141 | DPR_TS_TASK_EXT - CALENDAR_ID | Calendar | ||
| 142 | DPR_TS_TASK_EXT - CALENDER_TEXT | Factory calendar name | ||
| 143 | DPR_TS_TASK_EXT - CHANGED_BY | Last Changed By | ||
| 144 | DPR_TS_TASK_EXT - CHANGED_BY_NAME | Name of Person Who Last Changed the Project Element | ||
| 145 | DPR_TS_TASK_EXT - CREATED_BY | Created By | ||
| 146 | DPR_TS_TASK_EXT - CREATED_BY_NAME | Name of Person Who Created the Project Element | ||
| 147 | DPR_TS_TASK_EXT - DESCRIPTION | Project Element Name | ||
| 148 | DPR_TS_TASK_EXT - DURATION_UNIT | Time Unit for Execution Duration | ||
| 149 | DPR_TS_TASK_EXT - DURATION_UNIT_TEXT | Unit of Measurement Text (Maximum 10 Characters) | ||
| 150 | DPR_TS_TASK_EXT - FINISH_DATE_FIX | Fixed Predefined Finish Date | ||
| 151 | DPR_TS_TASK_EXT - FORECASTED_FINISH | Forecasted Finish Date | ||
| 152 | DPR_TS_TASK_EXT - FORECASTED_START | Forecasted Start Date | ||
| 153 | DPR_TS_TASK_EXT - GUID | Application Object GUID | ||
| 154 | DPR_TS_TASK_EXT - GUID | Application Object GUID | ||
| 155 | DPR_TS_TASK_EXT - GUID | Application Object GUID | ||
| 156 | DPR_TS_TASK_EXT - GUID | Application Object GUID | ||
| 157 | DPR_TS_TASK_EXT - ISTAT | System status | ||
| 158 | DPR_TS_TASK_EXT - PROCESS_TEXT | Process Description | ||
| 159 | DPR_TS_TASK_EXT - SCHEDULED_FINISH | Calculated Finish Date | ||
| 160 | DPR_TS_TASK_EXT - SCHEDULED_FINISH | Calculated Finish Date | ||
| 161 | DPR_TS_TASK_EXT - SCHEDULED_FINISH | Calculated Finish Date | ||
| 162 | DPR_TS_TASK_EXT - SCHEDULED_FINISH_LATE | Latest Finish Date | ||
| 163 | DPR_TS_TASK_EXT - SCHEDULED_FINISH_LATE | Latest Finish Date | ||
| 164 | DPR_TS_TASK_EXT - SCHEDULED_START | Calculated Start Date | ||
| 165 | DPR_TS_TASK_EXT - SCHEDULED_START_LATE | Latest Start Date | ||
| 166 | DPR_TS_TASK_EXT - SEVERITY_TEXT | Severity of Threshold Value Description | ||
| 167 | DPR_TS_TASK_EXT - START_DATE_FIX | Fixed Start Date | ||
| 168 | DPR_TS_TASK_EXT - STATTXT | Concatenated Status Text of an Object | ||
| 169 | DPR_TS_TASK_EXT - TSK_TYPE_TEXT | Text for Task Type | ||
| 170 | DPR_TS_TASK_EXT - WORK_UNIT_MSEHL | Description of Unit of Measure for Work | ||
| 171 | DPR_TS_TASK_EXT - WORK_UNIT_MSEHT | Unit of Measurement Text (Maximum 10 Characters) | ||
| 172 | DPR_TS_TASK_INT - ACT_WRK_UNIT_EXT | Unit | ||
| 173 | DPR_TS_TASK_INT - CONSTRAINT_TIME | Constraint Date | ||
| 174 | DPR_TS_TASK_INT - CONSTRAINT_TIME | Constraint Date | ||
| 175 | DPR_TS_TASK_INT - CONSTR_TIME_FIN | Constraint Date | ||
| 176 | DPR_TS_TASK_INT - CONSTR_TIME_FIN | Constraint Date | ||
| 177 | DPR_TS_TASK_INT - DURATION | Duration of Execution | ||
| 178 | DPR_TS_TASK_INT - DURATION | Duration of Execution | ||
| 179 | DPR_TS_TASK_INT - DURATION | Duration of Execution | ||
| 180 | DPR_TS_TASK_INT - GUID | Application Object GUID | ||
| 181 | DPR_TS_TASK_INT - GUID | Application Object GUID | ||
| 182 | DPR_TS_TASK_INT - GUID | Application Object GUID | ||
| 183 | DPR_TS_TASK_INT - LATEST_FINISH | Latest finish date | ||
| 184 | DPR_TS_TASK_INT - LATEST_FINISH | Latest finish date | ||
| 185 | DPR_TS_TASK_INT - LATEST_START | Latest start | ||
| 186 | DPR_TS_TASK_INT - LATEST_START | Latest start | ||
| 187 | DPR_TS_TASK_INT - OBJECT_TYPE | Object Type in Project Planning | ||
| 188 | DPR_TS_TASK_INT - PLANFINISH | Planned Finish Date | ||
| 189 | DPR_TS_TASK_INT - PLANFINISH | Planned Finish Date | ||
| 190 | DPR_TS_TASK_INT - PLANFINISH | Planned Finish Date | ||
| 191 | DPR_TS_TASK_INT - PLANSTART | Planned start date | ||
| 192 | DPR_TS_TASK_INT - WORK_UNIT | Unit | ||
| 193 | SCSTFACD - TXT_LONG | Factory calendar name | ||
| 194 | SCSTFACD - TXT_LONG | Factory calendar name | ||
| 195 | SCSTFACD - TXT_LONG | Factory calendar name | ||
| 196 | SYST - INDEX | ABAP System Field: Loop Index | ||
| 197 | SYST - LANGU | ABAP System Field: Language Key of Text Environment | ||
| 198 | SYST - LANGU | ABAP System Field: Language Key of Text Environment | ||
| 199 | SYST - LANGU | ABAP System Field: Language Key of Text Environment | ||
| 200 | SYST - LANGU | ABAP System Field: Language Key of Text Environment | ||
| 201 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables | ||
| 202 | SYST - TABIX | ABAP System Field: Row Index of Internal Tables |