SAP ABAP Table Field WBS_ENQUEUE_STRU-OBJTYPE (Object Type)
Hierarchy
☛ SAP_BASIS (Software Component) SAP Basis Component
   ⤷ BC-DWB-TOO (Application Component) Workbench Tools: Editors, Painters, Modelers
     ⤷ SWB_TOOL (Package) Abstract Workbench Tool
Basic Data
Table WBS_ENQUEUE_STRU     Lock Object Structure for "Abstract" Workbench Object
Field OBJTYPE     Object Type
Position 1    
Field Attributes
Key    
Mandatory    
Data Element TROBJTYPE     Object Type
Check Table      
Nesting depth for includes 0    
Internal ABAP Type C     Character String
Internal Length in Bytes 4    
Reference table      
Name of Include      
Reference Field (CURR or QTY)      
Check module    
NOT NULL forced       Any NULL or NOT NULL
Data Type in ABAP Dictionary CHAR     Character String
Length (No. of Characters) 4    
Number of Decimal Places 0    
Domain name OBJECT     Object Type
Origin of an input help (F4) D     Explicit search help attachment to data element
DD: Flag if it is a table       No / FALSE
DD: Depth for structured types 0    
DD: Component Type E     Data element
Type of Object Referenced       No Information
DD: Indicator for a Language Field       Not selected as language field
Position of the field in the table 0    
History
Last changed by/on SAP  20100420 
SAP Release Created in