SAP ABAP Table RCJ_NZTAB (Network Dates for WBS Element)
Hierarchy
SAP_APPL (Software Component) Logistics and Accounting
   PS-ST-OPR-PPB (Application Component) Project Planning Board
     CN_PPT_GRAFIK (Package) Project Planning Board
Basic Data
Table Category INTTAB    Structure 
Structure RCJ_NZTAB   Table Relationship Diagram
Short Description Network Dates for WBS Element    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 PSPNR PS_POSNR PS_POSNR NUMC 8   0   WBS Element *
2 AUFNR NETZPLAN NETZPLAN CHAR 12   0   Network number  
3 AUFPL CO_AUFPL AUFPL NUMC 10   0   Routing number of operations in the order  
4 EEINH PS_EINHT EINHEIT UNIT 3   0   Unit for the length (duration) of the WBS element  
5 EWANF PS_EWANF VORGABESTR DATS 8   0   Fixed/desired date for the forecasted start (projects)  
6 EWFIN PS_ESTRT DATUM DATS 8   0   Forecasted start date of the WBS element  
7 INDEX SYINDEX SYST_LONG INT4 10   0   Loop Index  
8 KTEXT AUFTEXT TEXT40 CHAR 40   0   Description  
9 NTANF PS_PSTRT DATUM DATS 8   0   WBS element: Basic start date  
10 NTEND PS_PENDE DATUM DATS 8   0   WBS element: Basic finish date  
11 PEINH PS_EINHT EINHEIT UNIT 3   0   Unit for the length (duration) of the WBS element  
12 SELKZ SELKZ SELKZ CHAR 1   0   Selection flag  
13 ISTRT PS_ISTRT DATUM DATS 8   0   Actual start date for the WBS element  
14 IENDE PS_IENDE DATUM DATS 8   0   Actual finish date of the WBS element  
15 IEINH PS_EINHT EINHEIT UNIT 3   0   Unit for the length (duration) of the WBS element  
16 FLGLC SELKZ SELKZ CHAR 1   0   Selection flag  
17 FLG_READ PS_FLGREAD X CHAR 1   0   Indicator: Import activities  
18 FLG_ENQ FLG_ENQ KREUZ CHAR 1   0   Indicator: Order is locked  
History
Last changed by/on SAP  20130529 
SAP Release Created in