SAP ABAP Table Field PSHLP_WBS_CREATE_ST-CGPL_OBJTYPE (Generic project planning: object type from ext. R/3 system)
Hierarchy
☛
EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
⤷
PS-ST (Application Component) Structures
⤷
PSB_API (Package) PS API Package
⤷
⤷
Basic Data
| Table | PSHLP_WBS_CREATE_ST | WBS Create Structure |
| Field | CGPL_OBJTYPE | Generic project planning: object type from ext. R/3 system |
| Position | 118 |
Field Attributes
| Key | ||
| Mandatory | ||
| Data Element | CGPL_OBJECT_TYPE_R3 | Generic project planning: object type from ext. R/3 system |
| Check Table | ||
| Nesting depth for includes | 4 | |
| Internal ABAP Type | C | Character String |
| Internal Length in Bytes | 3 | |
| Reference table | ||
| Name of Include | ||
| Reference Field (CURR or QTY) | ||
| Check module | ||
| NOT NULL forced | Any NULL or NOT NULL | |
| Data Type in ABAP Dictionary | CHAR | Character String |
| Length (No. of Characters) | 3 | |
| Number of Decimal Places | 0 | |
| Domain name | CHAR3 | Character field length 3 |
| Origin of an input help (F4) | No input help exists | |
| DD: Flag if it is a table | No / FALSE | |
| DD: Depth for structured types | 0 | |
| DD: Component Type | E | Data element |
| Type of Object Referenced | No Information | |
| DD: Indicator for a Language Field | Not selected as language field | |
| Position of the field in the table | 0 |
History
| Last changed by/on | SAP | 20130529 |
| SAP Release Created in | 606 |