SAP ABAP Table Field PSBWERB_WBS-GUID (UUID in X form (binary))
Hierarchy
☛ SAP_APPL (Software Component) Logistics and Accounting
   ⤷ PS-IS (Application Component) Information System
     ⤷ KAP8_45B (Package) Export Projects to BW (from Release 4.5B)
Basic Data
Table PSBWERB_WBS     Extract Structure: Inheritance Data for WBS Elements
Field GUID     UUID in X form (binary)
Position 35    
Field Attributes
Key    
Mandatory    
Data Element SYSUUID_X     UUID in X form (binary)
Check Table      
Nesting depth for includes 0    
Internal ABAP Type X     Byte Seq. (heXadecimal), in DDIC metadata also for INT1/2/4
Internal Length in Bytes 16    
Reference table      
Name of Include      
Reference Field (CURR or QTY)      
Check module    
NOT NULL forced       Any NULL or NOT NULL
Data Type in ABAP Dictionary RAW     Uninterpreted sequence of bytes
Length (No. of Characters) 16    
Number of Decimal Places 0    
Domain name SYSUUID     Universal Unique Identifier
Origin of an input help (F4)       No input help exists
DD: Flag if it is a table       No / FALSE
DD: Depth for structured types 0    
DD: Component Type E     Data element
Type of Object Referenced       No Information
DD: Indicator for a Language Field       Not selected as language field
Position of the field in the table 0    
History
Last changed by/on SAP  20130529 
SAP Release Created in