SAP ABAP Table Field PSB_GENIL_WBS_ATTR_ST-OBJNR (Object number)
Hierarchy
☛ EA-APPL (Software Component) SAP Enterprise Extension PLM, SCM, Financials
   ⤷ PS-ST (Application Component) Structures
     ⤷ PSB_GENIL (Package) PS Genil Layer
Basic Data
Table PSB_GENIL_WBS_ATTR_ST     WBS Element Attribute BOL Structure
Field OBJNR     Object number
Position 2    
Field Attributes
Key    
Mandatory    
Data Element J_OBJNR     Object number
Check Table *    
Nesting depth for includes 1    
Internal ABAP Type C     Character String
Internal Length in Bytes 22    
Reference table      
Name of Include      
Reference Field (CURR or QTY)      
Check module    
NOT NULL forced       Any NULL or NOT NULL
Data Type in ABAP Dictionary CHAR     Character String
Length (No. of Characters) 22    
Number of Decimal Places 0    
Domain name J_OBJNR     Object number
Origin of an input help (F4)       No input help exists
DD: Flag if it is a table       No / FALSE
DD: Depth for structured types 0    
DD: Component Type E     Data element
Type of Object Referenced       No Information
DD: Indicator for a Language Field       Not selected as language field
Position of the field in the table 0    
History
Last changed by/on SAP  20130529 
SAP Release Created in 605