SAP ABAP Table Field CRMS_MDM_MATERIAL_DATAEXCHANGE-ORDER_UNIT (Units of Measure of Product)
Hierarchy
☛ BBPCRM (Software Component) BBPCRM
   ⤷ WEC-APP-PCT (Application Component) Web Channel Product Catalog
     ⤷ CRM_DATAEXCHANGE_MDM_PRODUCT (Package) Product Data Exchange to MDM
Basic Data
Table CRMS_MDM_MATERIAL_DATAEXCHANGE     Interface Structure for CRM to MDM Material Data Exchange
Field ORDER_UNIT     Units of Measure of Product
Position 23    
Field Attributes
Key    
Mandatory    
Data Element COMT_UNIT     Units of Measure of Product
Check Table *    
Nesting depth for includes 0    
Internal ABAP Type C     Character String
Internal Length in Bytes 3    
Reference table      
Name of Include      
Reference Field (CURR or QTY)      
Check module    
NOT NULL forced       Any NULL or NOT NULL
Data Type in ABAP Dictionary UNIT     Unit key for QUAN fields
Length (No. of Characters) 3    
Number of Decimal Places 0    
Domain name MEINS     Units of Measurement of Various Types
Origin of an input help (F4)       No input help exists
DD: Flag if it is a table       No / FALSE
DD: Depth for structured types 0    
DD: Component Type E     Data element
Type of Object Referenced       No Information
DD: Indicator for a Language Field       Not selected as language field
Position of the field in the table 0    
History
Last changed by/on SAP  20140117 
SAP Release Created in 701