SAP ABAP Table Field CNMASS_WBS_ELEMENT-DELETE (Indicator: Deletion flag has been set)
Hierarchy
☛ SAP_APPL (Software Component) Logistics and Accounting
   ⤷ PS-ST-OPR (Application Component) Operative Structures
     ⤷ CNMASS (Package) Mass processing in the Project System
Basic Data
Table CNMASS_WBS_ELEMENT     Mass changes for WBS elements
Field DELETE     Indicator: Deletion flag has been set
Position 87    
Field Attributes
Key    
Mandatory    
Data Element PS_DELETE     Indicator: Deletion flag has been set
Check Table      
Nesting depth for includes 0    
Internal ABAP Type C     Character String
Internal Length in Bytes 1    
Reference table      
Name of Include      
Reference Field (CURR or QTY)      
Check module    
NOT NULL forced       Any NULL or NOT NULL
Data Type in ABAP Dictionary CHAR     Character String
Length (No. of Characters) 1    
Number of Decimal Places 0    
Domain name XFELD     Yes/No field
Origin of an input help (F4) F     Input help with fixed values
DD: Flag if it is a table       No / FALSE
DD: Depth for structured types 0    
DD: Component Type E     Data element
Type of Object Referenced       No Information
DD: Indicator for a Language Field       Not selected as language field
Position of the field in the table 0    
History
Last changed by/on SAP  20130529 
SAP Release Created in