SAP ABAP Table Field CLA_RES_HEADER_CHANGE-ORDERADM_H_DUMMY (Dummy function in length 1)
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷
CRM-CLA-RES (Application Component) Reservation
⤷
CRM_CLA_RES_API (Package) CRM Claims Management: Budget Reservation RFC API
⤷
⤷
Basic Data
| Table | CLA_RES_HEADER_CHANGE | Structure used in Reservation for Header Change |
| Field | ORDERADM_H_DUMMY | Dummy function in length 1 |
| Position | 18 |
Field Attributes
| Key | ||
| Mandatory | ||
| Data Element | DUMMY | Dummy function in length 1 |
| Check Table | ||
| Nesting depth for includes | 1 | |
| Internal ABAP Type | C | Character String |
| Internal Length in Bytes | 1 | |
| Reference table | ||
| Name of Include | ||
| Reference Field (CURR or QTY) | ||
| Check module | ||
| NOT NULL forced | Any NULL or NOT NULL | |
| Data Type in ABAP Dictionary | CHAR | Character String |
| Length (No. of Characters) | 1 | |
| Number of Decimal Places | 0 | |
| Domain name | DUMMY | Dummy function for table without function CHAR 1 |
| Origin of an input help (F4) | No input help exists | |
| DD: Flag if it is a table | No / FALSE | |
| DD: Depth for structured types | 0 | |
| DD: Component Type | E | Data element |
| Type of Object Referenced | No Information | |
| DD: Indicator for a Language Field | Not selected as language field | |
| Position of the field in the table | 0 |
History
| Last changed by/on | SAP | 20140117 |
| SAP Release Created in | 600 |