SAP ABAP Table BIW_PRTE (Generated Table for View)
Basic Data
Table Category VIEW    General view structure 
General view structure BIW_PRTE   Table Relationship Diagram
Short Description Generated Table for View    
Delivery and Maintenance
Pool/cluster      
Delivery Class      
Data Browser/Table View Maintenance     Display/Maintenance Allowed with Restrictions 
Components
     
Field Key Data Element Domain Data
Type
Length Decimal
Places
Short Description Check
table
1 MANDT MANDT MANDT CLNT 3   0   Client T000
2 PSPNR PS_INTNR PS_PSPNR NUMC 8   0   Current number for project or project item  
3 PSPID PS_PSPID PS_PSPID CHAR 24   0   Project definition  
4 PSPNR_PRPS PS_POSNR PS_POSNR NUMC 8   0   WBS Element  
5 POSNR PS_POSNR PS_POSNR NUMC 8   0   WBS Element PRPS
6 POSID PS_POSID PS_POSID CHAR 24   0   Work Breakdown Structure Element (WBS Element)  
7 ERDAT ERDAT DATUM DATS 8   0   Date on which the record was created  
8 AEDAT UPDAT DATUM DATS 8   0   Date on which object was last changed  
9 PSPHI PS_PSPHI PS_PSPNR NUMC 8   0   Current number of the appropriate project PROJ
10 PSTRT PS_PSTRT DATUM DATS 8   0   WBS element: Basic start date  
11 ESTRT PS_ESTRT DATUM DATS 8   0   Forecasted start date of the WBS element  
12 ISTRT PS_ISTRT DATUM DATS 8   0   Actual start date for the WBS element  
13 PENDE PS_PENDE DATUM DATS 8   0   WBS element: Basic finish date  
14 EENDE PS_EENDE DATUM DATS 8   0   Forecasted finish date of the WBS element  
15 IENDE PS_IENDE DATUM DATS 8   0   Actual finish date of the WBS element  
16 PDAUR PS_PDAUR DAUER_4_1 QUAN 5   1   Length (duration) of the basic dates in the WBS element  
17 EDAUR PS_EDAUR DAUER_4_1 QUAN 5   1   Forecasted length (duration) of the WBS element  
18 IDAUR PS_IDAUR DAUER_4_1 QUAN 5   1   Actual length (duration) of the WBS element  
19 IEINH PS_IEINH EINHEIT UNIT 3   0   Unit for duration of actual WBS element dates  
20 EEINH PS_EEINH EINHEIT UNIT 3   0   Unit for duration of WBS element planned dates  
21 PEINH PS_PEINH EINHEIT UNIT 3   0   Unit for duration of basic WBS element dates  
22 FLGVG PS_FLGVG X CHAR 1   0   Indicator: There are activities for the WBS elements  
23 FLGEW PS_FLGEW X CHAR 1   0   Indicator: Expected dates from the activities  
24 FLGEM PS_FLGEM X CHAR 1   0   Indicator: Forecast dates set manually  
25 FLGVM PS_FLGVM X CHAR 1   0   Indicator: Basic dates set manually  
26 FLGIM PS_FLGIM X CHAR 1   0   Indicator: Actual dates set manually  
27 FLGVI PS_FLGVI X CHAR 1   0   Indicator: Actual dates from the activities  
28 PSTRM PS_GSTRS DATUM DATS 8   0   Scheduled start (Basic)  
29 PETRM PS_GLTRS DATUM DATS 8   0   Scheduled finish (Basic)  
30 ESTRM PS_GSTPP DATUM DATS 8   0   Scheduled start date (Forecast)  
31 EETRM PS_GLTPP DATUM DATS 8   0   Scheduled finish date (Forecast)  
32 VISTR PS_ISTVORL DATUM DATS 8   0   Tentative actual start date for WBS element  
33 VIEND PS_IENVORL DATUM DATS 8   0   Tentative actual finish date for WBS element  
34 ESTRS PS_GSTRP DATUM DATS 8   0   Latest scheduled start date (forecast)  
35 PETRF PS_GETRE DATUM DATS 8   0   Earliest scheduled finish date (basic)  
36 OBJNR J_OBJNR J_OBJNR CHAR 22   0   Object number ONR00
37 EETRF PS_GLTRP DATUM DATS 8   0   Earliest scheduled finish date (forecast)  
38 PSTRS PS_GSTRE DATUM DATS 8   0   Latest scheduled start date (basic)  
Foreign Keys
Source Table Source Column Foreign Table Foreign Column Dependency Factor Cardinality left Cardinality right
1 BIW_PRTE MANDT T000 MANDT KEY 1 CN
2 BIW_PRTE OBJNR ONR00 OBJNR REF C C
3 BIW_PRTE POSNR PRPS PSPNR 1 1
4 BIW_PRTE PSPHI PROJ PSPNR KEY 1 1
History
Last changed by/on SAP  20130529 
SAP Release Created in