SAP ABAP Table Field BAPI_WBS_MILESTONE-FIXED_MILESTONE_DATE_BASIC (Fixed milestone date (basic))
Hierarchy
☛ SAP_APPL (Software Component) Logistics and Accounting
   ⤷ PS-ST-OPR (Application Component) Operative Structures
     ⤷ CNIF (Package) External 'Interface for Project Management System (PS)'
Basic Data
Table BAPI_WBS_MILESTONE     BAPI Structure for Milestones under WBS Elements
Field FIXED_MILESTONE_DATE_BASIC     Fixed milestone date (basic)
Position 9    
Field Attributes
Key    
Mandatory    
Data Element MLST_EDATU     Fixed milestone date (basic)
Check Table      
Nesting depth for includes 0    
Internal ABAP Type D     Date (Date: YYYYMMDD)
Internal Length in Bytes 8    
Reference table      
Name of Include      
Reference Field (CURR or QTY)      
Check module    
NOT NULL forced       Any NULL or NOT NULL
Data Type in ABAP Dictionary DATS     Date field (YYYYMMDD) stored as char(8)
Length (No. of Characters) 8    
Number of Decimal Places 0    
Domain name DATUM     Date
Origin of an input help (F4) T     Input help based on data type
DD: Flag if it is a table       No / FALSE
DD: Depth for structured types 0    
DD: Component Type E     Data element
Type of Object Referenced       No Information
DD: Indicator for a Language Field       Not selected as language field
Position of the field in the table 0    
History
Last changed by/on SAP  20130529 
SAP Release Created in