SAP ABAP Table Field BAPI_WBS_ELEMENT_EXP-DESCRIPTION (PS: Short description (first text line))
Hierarchy
☛ SAP_APPL (Software Component) Logistics and Accounting
   ⤷ PS-ST-OPR (Application Component) Operative Structures
     ⤷ CNIF (Package) External 'Interface for Project Management System (PS)'
Basic Data
Table BAPI_WBS_ELEMENT_EXP     BAPI structure WBS elements (export)
Field DESCRIPTION     PS: Short description (first text line)
Position 3    
Field Attributes
Key    
Mandatory    
Data Element PS_POST1     PS: Short description (first text line)
Check Table      
Nesting depth for includes 0    
Internal ABAP Type C     Character String
Internal Length in Bytes 40    
Reference table      
Name of Include      
Reference Field (CURR or QTY)      
Check module    
NOT NULL forced       Any NULL or NOT NULL
Data Type in ABAP Dictionary CHAR     Character String
Length (No. of Characters) 40    
Number of Decimal Places 0    
Domain name TEXT40     Text (40 characters)
Origin of an input help (F4)       No input help exists
DD: Flag if it is a table       No / FALSE
DD: Depth for structured types 0    
DD: Component Type E     Data element
Type of Object Referenced       No Information
DD: Indicator for a Language Field       Not selected as language field
Position of the field in the table 0    
History
Last changed by/on SAP  20130529 
SAP Release Created in