SAP ABAP Table Field BAPI_WBS_ELEMENT-WBS_BASIC_START_DATE (WBS element: Basic start date)
Hierarchy
☛ SAP_APPL (Software Component) Logistics and Accounting
   ⤷ PS-ST-OPR (Application Component) Operative Structures
     ⤷ CNIF (Package) External 'Interface for Project Management System (PS)'
Basic Data
Table BAPI_WBS_ELEMENT     BAPI Structure WBS Elements incl. some Date Fields PRTE
Field WBS_BASIC_START_DATE     WBS element: Basic start date
Position 67    
Field Attributes
Key    
Mandatory    
Data Element PS_PSTRT     WBS element: Basic start date
Check Table      
Nesting depth for includes 0    
Internal ABAP Type D     Date (Date: YYYYMMDD)
Internal Length in Bytes 8    
Reference table      
Name of Include      
Reference Field (CURR or QTY)      
Check module    
NOT NULL forced       Any NULL or NOT NULL
Data Type in ABAP Dictionary DATS     Date field (YYYYMMDD) stored as char(8)
Length (No. of Characters) 8    
Number of Decimal Places 0    
Domain name DATUM     Date
Origin of an input help (F4) T     Input help based on data type
DD: Flag if it is a table       No / FALSE
DD: Depth for structured types 0    
DD: Component Type E     Data element
Type of Object Referenced       No Information
DD: Indicator for a Language Field       Not selected as language field
Position of the field in the table 0    
History
Last changed by/on SAP  20130529 
SAP Release Created in