SAP ABAP Table Field /ISDFPS/BAPI_WBS_PSTAB-CGPL_OBJTYPE (Generic project planning: object type from ext. R/3 system)
Hierarchy
☛ EA-DFPS (Software Component) SAP Enterprise Extension Defense Forces & Public Security
   ⤷ IS-DFS-PDR (Application Component) Master Data Distribution
     ⤷ /ISDFPS/UPS_EXTENSIONS_FI (Package) Accounting in UPS
Basic Data
Table /ISDFPS/BAPI_WBS_PSTAB     Internal Structure for BAdI /ISDFPS/PROJ_EXTPOST
Field CGPL_OBJTYPE     Generic project planning: object type from ext. R/3 system
Position 118    
Field Attributes
Key    
Mandatory    
Data Element CGPL_OBJECT_TYPE_R3     Generic project planning: object type from ext. R/3 system
Check Table      
Nesting depth for includes 4    
Internal ABAP Type C     Character String
Internal Length in Bytes 3    
Reference table      
Name of Include      
Reference Field (CURR or QTY)      
Check module    
NOT NULL forced       Any NULL or NOT NULL
Data Type in ABAP Dictionary CHAR     Character String
Length (No. of Characters) 3    
Number of Decimal Places 0    
Domain name CHAR3     Character field length 3
Origin of an input help (F4)       No input help exists
DD: Flag if it is a table       No / FALSE
DD: Depth for structured types 0    
DD: Component Type E     Data element
Type of Object Referenced       No Information
DD: Indicator for a Language Field       Not selected as language field
Position of the field in the table 0    
History
Last changed by/on SAP  20130529 
SAP Release Created in 470