SAP ABAP Table Field /ISDFPS/BAPI_WBS_ELEMENT-LOGSYSTEM (Logical System)
Hierarchy
☛ EA-DFPS (Software Component) SAP Enterprise Extension Defense Forces & Public Security
   ⤷ IS-DFS-PDR (Application Component) Master Data Distribution
     ⤷ /ISDFPS/UPS_EXTENSIONS_FI (Package) Accounting in UPS
Basic Data
Table /ISDFPS/BAPI_WBS_ELEMENT     BAPI Structure WBS Elements Incl. Some Date Fields PRTE
Field LOGSYSTEM     Logical System
Position 85    
Field Attributes
Key    
Mandatory    
Data Element LOGSYSTEM     Logical System
Check Table *    
Nesting depth for includes 0    
Internal ABAP Type C     Character String
Internal Length in Bytes 10    
Reference table      
Name of Include      
Reference Field (CURR or QTY)      
Check module    
NOT NULL forced       Any NULL or NOT NULL
Data Type in ABAP Dictionary CHAR     Character String
Length (No. of Characters) 10    
Number of Decimal Places 0    
Domain name LOGSYS     Logical system
Origin of an input help (F4)       No input help exists
DD: Flag if it is a table       No / FALSE
DD: Depth for structured types 0    
DD: Component Type E     Data element
Type of Object Referenced       No Information
DD: Indicator for a Language Field       Not selected as language field
Position of the field in the table 0    
History
Last changed by/on SAP  20130529 
SAP Release Created in 200