| # |
GUI Status |
Short Description |
| 1 |
00525** |
Relationship overview - Display |
| 2 |
01000*V |
Operation detail |
| 3 |
01000MD |
Milestone details |
| 4 |
01001*H |
Add object from project using detail screens |
| 5 |
02000*A |
Overviews - Display |
| 6 |
02000*V |
Overviews - Change |
| 7 |
02000A* |
Initial screen - Display |
| 8 |
02000H* |
Initial screen - Create |
| 9 |
02000HD |
Status for Call Screen 2000 (SAPLCOKO) |
| 10 |
02000K* |
Status for Call Screen 2000 (SAPLCOKO) |
| 11 |
02000V* |
Initial screen - Change |
| 12 |
02005A |
Initial Screen - Display |
| 13 |
02010H* |
Dialog Box for Entering Your Own Network Numbers |
| 14 |
02040** |
Dialog box for entering your own network numbers |
| 15 |
02100HZ |
Network header: ZUOR must run first |
| 16 |
02120A* |
Header data - General - Display |
| 17 |
02120H* |
Header data - General - Create |
| 18 |
02120HD |
Call screen 2120 (SAPLCOKO) |
| 19 |
02120P* |
Call screen 2120 (SAPLCOKO) |
| 20 |
02120V* |
Header data - General - Change |
| 21 |
02125A* |
Header data - Supplement - Display |
| 22 |
02125H* |
Header data - Supplement - Create |
| 23 |
02125V* |
Header data - Supplements - Change |
| 24 |
02130X |
Assign sales document |
| 25 |
02130X* |
Copy from... |
| 26 |
02140X* |
Sub-network overview |
| 27 |
02150A* |
Overview header data/Sales order - Display |
| 28 |
02150H* |
Overview header data/Sales order - Insert |
| 29 |
02150V* |
Overview header data/Sales order - Change |
| 30 |
02200*A |
Overview header data/Sales order - Change |
| 31 |
02200H* |
Overview header data/Sales order - Change |
| 32 |
02200VV |
Overview header data/Sales order - Change |
| 33 |
02250*A |
Overview header data/Sales order - Change |
| 34 |
02250*H |
Overview header data/Sales order - Change |
| 35 |
02250*V |
Overview header data/Sales order - Change |
| 36 |
02300*A |
Basic data overview - Activities - Display |
| 37 |
02300*H |
Basic data overview - Activities - Create |
| 38 |
02300*V |
Basic data overview - Activities - Change |
| 39 |
02301*A |
Status overview - Activity - Display |
| 40 |
02301*V |
Status overview - Activity - Change |
| 41 |
02301PA |
Status overview - Activity - Display (Planning board) |
| 42 |
02301PH |
Status overview - Activity - Create (Planning board) |
| 43 |
02301PV |
Status overview - Activity - Change (Planning board) |
| 44 |
02302*A |
Status overview - Element - Display |
| 45 |
02302*V |
Status overview - Element - Change |
| 46 |
02310*A |
Basic data detail - Activity - Display |
| 47 |
02310*H |
Basic data detail - Activity - Create |
| 48 |
02310*V |
Basic data detail - Activity - Change |
| 49 |
02310GR |
Activity detail screen from graphic |
| 50 |
02313*A |
Basic data 2 - Activity - Display |
| 51 |
02313*H |
Basic data 2 - Activity - Create |
| 52 |
02313*V |
Basic data 2 - Activity - Change |
| 53 |
02314*A |
Detail screen - Assignments - Display |
| 54 |
02314*H |
Detail screen - Assignments - Create |
| 55 |
02314*V |
Detail screen - Assignments - Change |
| 56 |
02316*A |
Detail screen - Qualifications - Display |
| 57 |
02316*H |
Detail screen - Qualification - Create |
| 58 |
02316*V |
Detail screen - Qualifications - Change |
| 59 |
02320*A |
User Fields - Display |
| 60 |
02320*H |
User-defined fields - Create |
| 61 |
02320*V |
User-defined fields - Change |
| 62 |
02320GR |
User-defined fields - Graphic |
| 63 |
02330*A |
Dates and constraints - Activity - Display |
| 64 |
02330*H |
Dates and constraints - Activity - Create |
| 65 |
02330*V |
Dates and constraints - Activity - Change |
| 66 |
02330GR |
Dates and constraints - Activity - Graphic |
| 67 |
02350*A |
Work overview - Activities - Display |
| 68 |
02350*H |
Work overview - Activities - Create |
| 69 |
02350*V |
Work overview - Activities - Change |
| 70 |
02360*A |
Work overview - Elements - Display |
| 71 |
02360*GA |
Work overview - Elements - Graphic |
| 72 |
02360*GP |
Work overview - Elements - Graphic |
| 73 |
02360*H |
Work overview - Elements - Create |
| 74 |
02360*V |
Work overview - Elements - Change |
| 75 |
02370*A |
Work details - Activity - Display |
| 76 |
02370*H |
Work details - Activity - Create |
| 77 |
02370*V |
Work details - Activity - Change |
| 78 |
02370GR |
Work details - Activity - Graphic |
| 79 |
02380*A |
Work details - Element |
| 80 |
02380*H |
Work details - Element |
| 81 |
02380*V |
Work details - Element |
| 82 |
02400*A |
Relationship overview - Display |
| 83 |
02400*H |
Relationship overview - Create |
| 84 |
02400*V |
Relationship overview - Change |
| 85 |
02400GV |
List of relationships as modal dialog box |
| 86 |
02410*A |
Relationship details - Display |
| 87 |
02410*H |
Relationship details - Create |
| 88 |
02410*V |
Relationship details - Change |
| 89 |
02410GR |
Relationship details - Graphic |
| 90 |
02460*A |
Loop analysis - Display |
| 91 |
02460*H |
Loop analysis - Create |
| 92 |
02460*V |
Loop analysis - Change |
| 93 |
02500*A |
External processing overview - Display |
| 94 |
02500*H |
External processing overview - Create |
| 95 |
02500*V |
External processing overview - Change |
| 96 |
02510*A |
External processing - Activity/Element - Display |
| 97 |
02510*H |
External processing - Activity/Element - Create |
| 98 |
02510*V |
External processing - Activity/Element - Change |
| 99 |
02510GR |
External data detail - Activity/Element - Graphic |
| 100 |
02520*A |
External processing overview - Elements - Display |
| 101 |
02520*GA |
External activity overview- Elements - Graphic - Display |
| 102 |
02520*GP |
External activity overview- Elements - Graphic |
| 103 |
02520*H |
External processing overview - Elements - Create |
| 104 |
02520*V |
External processing overview - Elements - Change |
| 105 |
02540*A |
General costs overview - Activities - Display |
| 106 |
02540*H |
General costs overview - Activities - Create |
| 107 |
02540*V |
General costs overview - Activities - Change |
| 108 |
02550*A |
General costs details - Activity/Element - Display |
| 109 |
02550*H |
General costs details - Activity/Element - Create |
| 110 |
02550*V |
General costs details - Activity/Element - Change |
| 111 |
02550GR |
General costs details - Activity/Element - Change |
| 112 |
02560*A |
General costs details - Activity/Element - Change |
| 113 |
02560*GA |
General costs activity overview-Elements-Graphic-Display |
| 114 |
02560*GP |
General costs activity overview-Elements-Graphic-Display |
| 115 |
02560*H |
General costs overview - Elements - Create |
| 116 |
02560*V |
General costs overview - Elements - Change |
| 117 |
02600*A |
PRT overview - Display |
| 118 |
02600*H |
PRT overview - Create |
| 119 |
02600*V |
PRT overview - Change |
| 120 |
02600A* |
PRT overview - Display |
| 121 |
02600HA |
PRT overview - Display |
| 122 |
02600HV |
PRT overview - Change |
| 123 |
02600VA |
PRT overview - Display |
| 124 |
02600VV |
PRT overview - Change |
| 125 |
02610*C |
PRT detail screen - Check |
| 126 |
02610A* |
PRT detail screen - Display |
| 127 |
02610HA |
PRT detail screen - Display |
| 128 |
02610HH |
PRT detail screen - Create |
| 129 |
02610HV |
PRT detail screen - Change |
| 130 |
02610VA |
PRT detail screen - Display |
| 131 |
02610VH |
PRT detail screen - Create |
| 132 |
02610VV |
PRT detail screen - Change |
| 133 |
02620HH |
PRT dialog box - New entries |
| 134 |
02620VH |
PRT dialog box - New entries |
| 135 |
02700*A |
Assignment of production orders to network activity -Display |
| 136 |
02700*H |
Assignment of production orders to network activity - Create |
| 137 |
02700*V |
Assignment of production orders to network activity - Change |
| 138 |
02711H |
Create component |
| 139 |
02720*V |
Component detail - Purchasing data |
| 140 |
02740** |
Component detail - Text positions |
| 141 |
02750** |
Component detail - Account assignment types |
| 142 |
02799** |
Component details |
| 143 |
02799TM |
Monitoring Dates Detail Screen |
| 144 |
02800*A |
PS texts overview - Administrative data - Display |
| 145 |
02800*H |
PS texts overview - Administrative data - Create |
| 146 |
02800*V |
PS texts overview - Administrative data - Change |
| 147 |
02800GR |
PS texts overview - Administrative data - Graphic |
| 148 |
02800PA |
PS texts overview - Administrative data - Display (Pl.board) |
| 149 |
02800PH |
PS texts overview - Administrative data - Create (Pl.board) |
| 150 |
02800PV |
PS texts overview - Administrative data - Change (Pl.board) |
| 151 |
02810*A |
PS texts overview - Display |
| 152 |
02810*H |
PS text overview - Create |
| 153 |
02810*V |
PS text overview - Change |
| 154 |
02810GR |
PS text overview - Graphic |
| 155 |
02810PA |
PS text overview - Display (planning board) |
| 156 |
02810PH |
PS text overview - Create (planning board) |
| 157 |
02810PV |
PS text overview - Change (planning board) |
| 158 |
02850*A |
Milestone overview - Display |
| 159 |
02850*H |
Milestone overview - Create |
| 160 |
02850*V |
Milestone overview - Change |
| 161 |
02851*GA |
Milestone assignment |
| 162 |
02851*GR |
Milestone assignment |
| 163 |
02870*A |
Milestone - Basic data (Basic dates) - Display |
| 164 |
02870*V |
Milestone - Basic data (Basic dates) - Change |
| 165 |
02875*A |
Milestone - Basic data (Forecast dates) - Display |
| 166 |
02875*V |
Milestone - Basic data (Forecast dates) - Change |
| 167 |
02880*A |
Milestone - Functions - Display |
| 168 |
02880*V |
Milestone - Functions - Change |
| 169 |
02890*A |
Milestone - Administration - Display |
| 170 |
02890*V |
Milestone - Administration - Change |
| 171 |
028MK*V |
Select bill of material items |
| 172 |
02900*A |
Object overview - Display |
| 173 |
02900*H |
Object overview - Create |
| 174 |
02900*V |
Object overview - Change |
| 175 |
02900A* |
F4 help for reduction level |
| 176 |
02950*A |
Assignment of WBS to activity - Display |
| 177 |
02950*H |
Assignment of WBS to activitiy - Create |
| 178 |
02950*V |
Assignment of WBS to activity - Change |
| 179 |
02960*A |
Assignment of WBS to element - Display |
| 180 |
02960*H |
Assignment of WBS to element - Create |
| 181 |
02960*V |
Assignment of WBS to element - Change |
| 182 |
03000V* |
Scheduling the overall network - Initial screen |
| 183 |
03010V* |
Scheduling of the overall network - Edit |
| 184 |
04100A* |
Time constraints (Basic dates) - Display |
| 185 |
04100H* |
Time constraints (Basic dates) - Create |
| 186 |
04100V* |
Time constraints (Basic dates) - Change |
| 187 |
04200A* |
Time constraints (Forecast dates) - Display |
| 188 |
04200H* |
Time constraints (Forecast dates) - Create |
| 189 |
04200V* |
Time constraints (Forecast dates) - Change |
| 190 |
06000MK |
Copy Selection of Components |
| 191 |
09999** |
Time constraints (Forecast dates) - Change |
| 192 |
0TABS*V |
Basic data details activity -change TAB PAGE |
| 193 |
2100_POP |
Network header COKO 2100 Popup |
| 194 |
2999 |
Work details - Activity - Display |
| 195 |
BALANCE_A |
Display configuration change leveling |
| 196 |
BALANCE_V |
Display configuration change leveling |
| 197 |
DETAILANZEIGE |
Activity detail |
| 198 |
LIST |
GUI for lists in SAPLCOVG |
| 199 |
LISTP |
GUI for Lists |
| 200 |
MLEA |
Components for activity - Display |
| 201 |
MLEAGP |
Components for activity - Display (from graphic) |
| 202 |
MLEAGR |
Components for activity - Display (from graphic) |
| 203 |
MLEV |
Components for activity - Change |
| 204 |
MLEVGR |
Components in activity - Change (from graphic) |
| 205 |
MLGA |
Components for network - Display |
| 206 |
MLGV |
Components for network - Change |
| 207 |
MLGVA |
Components for network - Display |
| 208 |
NODVE |
Component detail screen - Validation |
| 209 |
OK_ESC |
Continue and cancel |
| 210 |
SELECT |
Continue and cancel |
| 211 |
SELECT_1 |
Continue and cancel |
| 212 |
SUBNT |
Sub-networks for network (list) |
| 213 |
TERMLIST |
GUI for list according to overall network scheduling |
| 214 |
TREE_ANZ |
Display network as hierarchy |
| 215 |
TREE_ANZ_STPO |
Display BOM Explosion as Hierarchy |
| |
|
|
| # |
GUI Title |
Short Description |
| 1 |
000 |
$ Network: Initial Screen |
| 2 |
001 |
$ Network: Component Overview |
| 3 |
002 |
$ Network: Assignments to Activity $ |
| 4 |
003 |
$ Network: General Data |
| 5 |
004 |
$ Network: Purchasing Data |
| 6 |
005 |
$ Network: Supplemental Header Data |
| 7 |
006 |
$ Network: Variable-Size Item Data |
| 8 |
007 |
$ Network: Text Item |
| 9 |
008 |
Filters |
| 10 |
009 |
& Network: Characteristic Value Assignment for Components |
| 11 |
010 |
Network &1 Header Data |
| 12 |
012 |
$ Network: Header Data Overview - Sales Order |
| 13 |
015 |
$ Network: Header Data |
| 14 |
016 |
Reduction Levels |
| 15 |
019 |
Procurement indicator |
| 16 |
020 |
$ Network: Scheduling of the Overall Network |
| 17 |
025 |
$ Network: Scheduling of the Overall Network (Basic) |
| 18 |
030 |
$ Network: Scheduling of the Overall Network (Forecast) |
| 19 |
040 |
$ Network: Parameter Profile |
| 20 |
050 |
$ Network: Subnetwork Overview |
| 21 |
060 |
Create subnetwork |
| 22 |
070 |
Missing parts for network & |
| 23 |
100 |
$ Network: Alternative Overview |
| 24 |
200 |
$ Network: Standard Network Header |
| 25 |
250 |
$ Network: Project Assignment |
| 26 |
270 |
& Network: Production Order Assignment |
| 27 |
295 |
Change activity/element/milestone |
| 28 |
296 |
Create activity/element/milestone |
| 29 |
297 |
Activity detail data |
| 30 |
298 |
Element detail data |
| 31 |
299 |
Milestone detail data |
| 32 |
300 |
$ Network: Basic Data Overview (Basic Dates) |
| 33 |
301 |
$ Network: Status Overview |
| 34 |
302 |
$ Network: Assignment of Activities to WBS Elements |
| 35 |
303 |
$ Network: Assignment of Elements to WBS Elements |
| 36 |
305 |
$ Network: Basic Data Overview (Forecast) |
| 37 |
306 |
Network Overview Tree |
| 38 |
307 |
Overview Tree for BOM Explosion |
| 39 |
310 |
$ Network: Basic Data Details (Basic Dates) |
| 40 |
313 |
$ Network: Basic Data 2 (Addtl Parameters) |
| 41 |
314 |
$ Network: Assignments |
| 42 |
315 |
$ Network: Basic Data Details (Forecast Dates) |
| 43 |
316 |
& Network: Qualifications |
| 44 |
317 |
& Network: Capacity Splits |
| 45 |
320 |
$ Network: User Fields |
| 46 |
330 |
$ Network: Activity Dates (Basic) |
| 47 |
331 |
Network $: Element Dates (Basic) |
| 48 |
335 |
$ Network: Activity Dates (Forecast) |
| 49 |
336 |
Network $: Element Dates (Forecast) |
| 50 |
340 |
$ Network: Subnetwork Overview |
| 51 |
350 |
$ Network: Work Overview (Basic Dates) |
| 52 |
355 |
$ Network: Work Overview (Forecast Dates) |
| 53 |
360 |
$ Network: Work Element Overview (Basic Dates) |
| 54 |
361 |
Network & Element Overview (Basic Dates) |
| 55 |
365 |
$ Network: Work Element Overview (Forecast Dates) |
| 56 |
366 |
Network & Element Overview (Forecast Dates) |
| 57 |
370 |
$ Network: Work Detail (Basic Dates) |
| 58 |
375 |
$ Network: Work Detail (Forecast Dates) |
| 59 |
380 |
$ Network Element: Work Detail (Basic Dates) |
| 60 |
385 |
Network $ Element: Work Detail (Forecast Dates) |
| 61 |
390 |
$ Network: Constraints (Basic Dates) |
| 62 |
395 |
$ Network: Constraints (Forecast Dates) |
| 63 |
400 |
$ Network: Relationship Overview |
| 64 |
410 |
$ Network: Relationship Detail |
| 65 |
420 |
Reservation |
| 66 |
421 |
Purchase Requisition |
| 67 |
422 |
Copy Bill of Material Items |
| 68 |
423 |
Copy header data |
| 69 |
430 |
Include Copied Object |
| 70 |
450 |
$ Network: Loop Analysis |
| 71 |
500 |
$ Network: External Processing Overview |
| 72 |
510 |
$ Network: External Processing Detail |
| 73 |
520 |
$ Network: External Processing Element Overview |
| 74 |
540 |
$ Network: General Costs Overview |
| 75 |
550 |
$ Network: General Costs Detail |
| 76 |
560 |
$ Network: General Costs Element Overview |
| 77 |
600 |
$ Network: Production Resources/Tools Overview |
| 78 |
6000 |
Copy Component Data |
| 79 |
610 |
$ Network: PRT General View |
| 80 |
620 |
$ Network: PRT Quantities |
| 81 |
630 |
$ Network: PRT Dates |
| 82 |
680 |
$ Network: PRT New Entries |
| 83 |
700 |
$ Network: Material Allocation |
| 84 |
750 |
Number Assignment |
| 85 |
800 |
$ Network PS Texts: Administrative Data |
| 86 |
805 |
Network & Ps texts |
| 87 |
810 |
$ Network PS Texts: Overview |
| 88 |
850 |
$ Network: Milestone Overview |
| 89 |
870 |
$ Network: Milestone Details - General Data (Basic) |
| 90 |
875 |
$ Network: Milestone Details - General Data (Forecast) |
| 91 |
880 |
$ Network: Milestone Details - Workflow |
| 92 |
890 |
$ Network: Milestone Details - Administration |
| 93 |
900 |
$ Network: Object Overview |
| 94 |
990 |
Network Selection |
| 95 |
992 |
$ |
| 96 |
995 |
Detailed Check/Entry Tool |
| 97 |
BALANCE |
Network & Change Management Configuration |
| 98 |
CN24N_ECK |
CN24N Network & Overall Network Scheduling (Basic) |
| 99 |
CN24N_PROG |
CN24N Network & Overall Network Scheduling (Forecast) |
| 100 |
EXPED |
Monitoring Dates |
| |
|
|