SAP ABAP Program SAPLCNISN (SAPLCNISN)
Basic Data
Program | SAPLCNISN | |
Program Type | F | Function group |
Attributes
Status | ||
Application | S | Basis |
Authorization Group | ||
Logical database | D$S | Processing without database |
Selection screen | ||
Editor lock | Fixed point arithmetic | |
Unicode checks active | Start using variant |
Function Group
Include | Function Module | Short Description | Mode |
---|---|---|---|
01 | ![]() |
||
02 | ![]() |
Export the table ELM_ps to memory | |
03 | ![]() |
Popup and get data | |
04 | ![]() |
Imports the i_elm table | |
05 | ![]() |
Intiailize the function group fields for PS Graphics | |
06 | ![]() |
Popup to loop through the nodes of tree. | |
07 | ![]() |
Replacing the blanks | |
08 | ![]() |
Dont use this function module | |
09 | ![]() |
Set the text sysmbols | |
10 | ![]() |
Don't use this function module | |
11 | ![]() |
Post the version | |
12 | ![]() |
function to convert the characters | |
Transaction Code
Screens
# | Screen | Short Description |
---|---|---|
1 | 0200 | Pop up for navigation |
GUI Status
# | GUI Status | Short Description |
---|---|---|
1 | GS_STRUC | Structure Graphic |
2 | OCX_GRAF | OCX Graphics |
3 | PFSTATUS_200 | PF Status for navigation Popup |
GUI Title
# | GUI Title | Short Description |
---|---|---|
1 | GB0 | Project Info System: Project Planning Board |
2 | GH0 | Project Info System: Project Structure |
3 | GH1 | Project Info System: Project Structure(Activity Basic Date |
4 | GH2 | Project Info System: Project Structure (Act. Forecast Dates) |
5 | GH3 | Project Info System: Project Structure (Act. Actual Dates) |
6 | GN1 | Project Info System: Network (Basic Dates) |
7 | GN2 | Project Info System: Network (Forecast Dates) |
8 | GN3 | Project Info System: Network (Actual Dates) |
9 | GS0 | Project Info System: Structure Graphic |
10 | TITLE_200 | Navigation |
History
Last changed by/on | SAP | 20071120 |
SAP Release Created in |