SAP ABAP Program SAPLCCCN (SAPLCCCN)
Basic Data
| Program | SAPLCCCN | |
| Program Type | F | Function group |
Attributes
| Status | T | Test Program |
| Application | S | Basis |
| Authorization Group | ||
| Logical database | ||
| Selection screen | ||
| Editor lock | Fixed point arithmetic | |
| Unicode checks active | Start using variant |
Function Group
| Include | Function Module | Short Description | Mode |
|---|---|---|---|
| 01 | |
Lesen Änderungsstammsatz | |
| 02 | |
Check whether change number is allowed for changes | |
| 03 | |
Änderungsstammsatz und Matchcode beim Ändern mit Änderungsnummer versorgen | |
| 04 | |
Die Daten geänderter Objekte werden für die Verbuchung bereitsgestellt | |
| 05 | |
Buchen AEOI-Einzelsatz direkt | |
| 06 | |
Änderungsdienst : Änderung bestätigen | |
| 07 | |
||
| 08 | |
||
| 09 | |
||
| 10 | |
||
| 11 | |
||
| 12 | |
Aufruf einer Anzeigetransaktion in einer neuen Task | R |
| 13 | |
||
| 14 | |
Check whether change number is allowed for changes | |
| 15 | |
Objektverwaltungssatz zu einem Objekt direkt löschen | |
| 16 | |
Possible Entries for Task List Group | |
| 17 | |
Prüfen und ausgeben, ob Änderungsnummer relevant für Effectivity | |
| 18 | |
||
| 19 | |
Setzen des Kennzeichens FLUSE im Änderungsstammsatz | |
| 20 | |
Prüfung, ob Parametergültigkeit oder Freigabesteuerung aktiv | |
| 21 | |
||
| 22 | |
||
| 23 | |
||
| 24 | |
||
| 25 | |
||
| 26 | |
Anspringen der Anzeigetransaktion für Änderungsnummer | |
| 27 | |
Prüfung des Systemstatus einer Änderungsnummer | |
| 28 | |
||
| 29 | |
Änderungsdienst : Änderung bestätigen | |
| 30 | |
Test Terminierung | |
| 31 | |
Sperre auf Änderungsnummern aufheben | |
| 32 | |
||
| 33 | |
||
| 34 | |
||
| 35 | |
||
| 36 | |
Post | |
Transaction Code
Screens
| # | Screen | Short Description |
|---|---|---|
| 1 | 0101 | Engineering Change Mgmt: Task List Description |
| 2 | 0200 | Engineering Change Mgmt: Equipment BOM Description |
| 3 | 0201 | Engineering Change Mgmt: Material BOM Description |
| 4 | 0202 | Engin. chg. mgmt: document structure description |
| 5 | 0203 | Engin. chg. mgmt: functional location BOM description |
| 6 | 0204 | Engin. chg. mgmt: standard BOM description |
| 7 | 0205 | Engin. chg. mgmt: sales order BOM description |
| 8 | 0206 | Engineering Change Management : Short text WBS BOM |
| 9 | 0301 | Engineering change management: material description |
| 10 | 0302 | Engin. chg. mgmt: document description |
| 11 | 0307 | ECM : PVS description |
| 12 | 0400 | Poss. entries for task list group sel. in engin. change mgmt |
| 13 | 0401 | Possible entries for task list |
| 14 | 0600 | ECM: All Data Elements for a Change Number |
GUI Status
| # | GUI Status | Short Description |
|---|---|---|
| 1 | S000 | Texts for change numbers |
| 2 | S001 | Possible entries for task list |
| 3 | S002 | Possible entries for task list |
| 4 | S600 | Selection status |
GUI Title
| # | GUI Title | Short Description |
|---|---|---|
| 1 | 001 | Object Management Data |
| 2 | 002 | Task list selection |
| 3 | 600 | Alternative dates for change number & |
| 4 | 700 | Allocation of a material to an effectivity profile |
History
| Last changed by/on | SAP | 19991102 |
| SAP Release Created in |