SAP ABAP Message Class VVOZINS Message Number 005 ( In old currency &1, interest was not calculated up to &2)
Hierarchy
INSURANCE (Software Component) SAP Insurance
   FS-CD (Application Component) Collections/Disbursements
     ISCDFUN (Package) FS-CD: Collections/Disbursements Functionality
Attribute
Message class VVOZINS  
Short Description Balance Interest Calculation for Insurance Objects    
Message Number 005  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20050224   
Message Text
In old currency &1, interest was not calculated up to &2
Help Document

Diagnosis

You want to execute a currency change for an insurance object with balance interest calculation. This is only possible if interest has been calculated for insurance objects up to the day before the change date. Either interest was not calculated up to this date, or clarification cases still exist for this insurance object.

The clarification cases can occur due to postings in a period for which interest has already been calculated, and are retained if the posting is then reversed. A further cause can be postings that are executed while interest is being calculated on the insurance object.

System Response

The currency change is not possible.

Procedure

Calculate interest in the insurance object up to the day before the desired date. This deletes the clarification cases.

Procedure for System Administration

History
Last changed on/by 20050224  SAP 
SAP Release Created in   463