SAP ABAP Message Class VVOZINS Message Number 004 ( In new currency &1, interest was calculated beyond change date &2)
Hierarchy
☛ INSURANCE (Software Component) SAP Insurance
   ⤷ FS-CD (Application Component) Collections/Disbursements
     ⤷ ISCDFUN (Package) FS-CD: Collections/Disbursements Functionality
Attribute
Message class VVOZINS  
Short Description Balance Interest Calculation for Insurance Objects    
Message Number 004  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20050224   
Message Text
In new currency &1, interest was calculated beyond change date &2
Help Document

Diagnosis

You want to change the currency for an insurance object with balance interest calculation. Interest has already been calculated beyond the change dae in the new currency, however.

System Response

The currency change is not possible.

Procedure

First, reverse the interest documents from the balance interest calculation for insurance objects, documents which were posted in the new currency for the period after the change date.

Procedure for System Administration

History
Last changed on/by 20050224  SAP 
SAP Release Created in   463