SAP ABAP Message Class VV Message Number 503 (Planning material & is locked (assignment check not possible))
Hierarchy
☛
BBPCRM (Software Component) BBPCRM
⤷ CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
⤷ VA (Package) Application development R/3 Sales
⤷ CRM-BTX-BF-IF (Application Component) R/3 Interface for Business Transactions
⤷ VA (Package) Application development R/3 Sales
Attribute
Message class | VV | ||
Short Description | Requirements and availability | ||
Message Number | 503 | ||
Documentation status | |||
Authorization check Error Message | |||
Changed On |
Message Text
Planning material & is locked (assignment check not possible)
Help Document
Diagnosis
The planning material (plant ) belonging to material which you are processing is blocked by user . The system has attempted several times without success to block this material.
System Response
So as not to slow your work, the system stops its attempts at blocking and does not carry out an assignment check.
Procedure
Note that the transaction you are processing is not confirmed. You should therefore carry out another assignment check (availability check).
History
Last changed on/by | 20130531 | SAP | |
SAP Release Created in |