Message Text
Help Document
Diagnosis
At least three meter readings must be entered on one day. One of these is a technical meter reading. This means it is entered during a technical operation.
However, there are at least two other meter readings that are relevant for billing.
Because you are using a Japanese Billing Period, a conflict has arisen that can no longer be properly resolved.
The valid, available conflict solutions normally only solve conflict between one technical meter reading and one billing-relevant meter reading.
Therefore, you must reduce the complexity of this conflict by deleting a meter reading that is not required for billing.
If a final or periodic meter reading is available, the periodic meter reading is not necessary and the final meter reading has the priority.