SAP ABAP Message Class U7 Message Number 044 (From date &1 (meter reading &2) later than to date &3 (meter reading &4))
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-BI (Application Component) Contract Billing
⤷
EE20_JBP (Package) IS-U: Japanese Billing Preriod

⤷

⤷

Attribute
Message class | ![]() |
U7 | |
Short Description | ![]() |
Japan-Specific Developments | |
Message Number | ![]() |
044 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20050224 |
Message Text
From date &1 (meter reading &2) later than to date &3 (meter reading &4)
Help Document
Diagnosis
You tried to interpolate a meter reading result between meter readings and .
In this case, it was not possible to determine the consumption allocation period for these meter readings, which is normally derived from the meter reading reasons and meter reading data based on the billing period.
The from-date is later than the to-date .
Procedure
History
Last changed on/by | ![]() |
20050224 | SAP |
SAP Release Created in | 471 |