SAP ABAP Message Class U7 Message Number 043 (Equi no. &1 scheduled MR date &2: Indefinite end of billing period)
Hierarchy
IS-UT (Software Component) SAP Utilities/Telecommunication
   IS-U-BI (Application Component) Contract Billing
     EE20_JBP (Package) IS-U: Japanese Billing Preriod
Attribute
Message class U7  
Short Description Japan-Specific Developments    
Message Number 043  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20050224   
Message Text
Equi no. &1 scheduled MR date &2: Indefinite end of billing period
Help Document

Diagnosis

INTERNAL ERROR:

There are at least two installations that have different billing period specifications for equipment number and scheduled meter reading date . This means that the system is unable to determine a key date for the end of the billing period from the scheduled meter reading date .

In this case, <> .

A device cannot have different billing periods in two installations.

Procedure

History
Last changed on/by 20050224  SAP 
SAP Release Created in   471