SAP ABAP Message Class U7 Message Number 040 (Meter reading document &1 has different billing period to MR document &2)
Hierarchy
IS-UT (Software Component) SAP Utilities/Telecommunication
   IS-U-BI (Application Component) Contract Billing
     EE20_JBP (Package) IS-U: Japanese Billing Preriod
Attribute
Message class U7  
Short Description Japan-Specific Developments    
Message Number 040  
Documentation status       Space: object requires documentation
Authorization check Error Message      
Changed On 20050224   
Message Text
Meter reading document &1 has different billing period to MR document &2
Help Document

Diagnosis

Meter reading document &V1 has a different billing period to meter reading document although both meter readings have the same meter reading date. The system cannot process documents from the same day that have the different definitions SBP and JBP.

Changes may have been made to the billing period in Customizing that have caused inconsistencies.

System Response

Procedure

Contact SAP to determine exact causes.

Procedure for System Administration

History
Last changed on/by 20050224  SAP 
SAP Release Created in   471