SAP ABAP Message Class U7 Message Number 040 (Meter reading document &1 has different billing period to MR document &2)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-BI (Application Component) Contract Billing
⤷
EE20_JBP (Package) IS-U: Japanese Billing Preriod

⤷

⤷

Attribute
Message class | ![]() |
U7 | |
Short Description | ![]() |
Japan-Specific Developments | |
Message Number | ![]() |
040 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20050224 |
Message Text
Meter reading document &1 has different billing period to MR document &2
Help Document
Diagnosis
Meter reading document &V1 has a different billing period to meter reading document although both meter readings have the same meter reading date. The system cannot process documents from the same day that have the different definitions SBP and JBP.
Changes may have been made to the billing period in Customizing that have caused inconsistencies.
System Response
Procedure
Contact SAP to determine exact causes.
Procedure for System Administration
History
Last changed on/by | ![]() |
20050224 | SAP |
SAP Release Created in | 471 |