SAP ABAP Message Class U7 Message Number 034 (Inst. &1 sched. bill. date &2: End of billing period not determined)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷
IS-U-BI (Application Component) Contract Billing
⤷
EE20_JBP (Package) IS-U: Japanese Billing Preriod

⤷

⤷

Attribute
Message class | ![]() |
U7 | |
Short Description | ![]() |
Japan-Specific Developments | |
Message Number | ![]() |
034 | |
Documentation status | ![]() |
||
Authorization check Error Message | |||
Changed On | ![]() |
20050224 |
Message Text
Inst. &1 sched. bill. date &2: End of billing period not determined
Help Document
Diagnosis
The end of the billing period cannot be determined definitively for the billing order (installation , scheduled billing date ).
This billing order is assigned the following two meter readings:
- < MR document, MR reason, end of billing period > = < >
- < MR document, MR reason, end of billing period > = < >
The billing periods have different end dates.
Procedure
You must enter the meter reading results in such a way that the end of the billing period can be determined definitively.
Note:
The way in which your entries are interpreted depends on exactly which billing period you use.
- Standard: billing period = SBP
The meter reading result must be the same for all the meter readings allocated to the billing order. - Non-standard: billing period = JBP
The real meter reading date must be the same for all the meter readings allocated to the billing order.
History
Last changed on/by | ![]() |
20050224 | SAP |
SAP Release Created in | 471 |