SAP ABAP Message Class U7 Message Number 027 (Too many technical meter readings in one activity day)
Hierarchy
☛
IS-UT (Software Component) SAP Utilities/Telecommunication
⤷ IS-U-BI (Application Component) Contract Billing
⤷ EE20_JBP (Package) IS-U: Japanese Billing Preriod
⤷ IS-U-BI (Application Component) Contract Billing
⤷ EE20_JBP (Package) IS-U: Japanese Billing Preriod
Attribute
Message class | U7 | ||
Short Description | Japan-Specific Developments | ||
Message Number | 027 | ||
Documentation status | Space: object requires documentation | ||
Authorization check Error Message | |||
Changed On | 20050224 |
Message Text
Too many technical meter readings in one activity day
Help Document
Diagnosis
A conflict has arisen between two technical meter readings that are valid on the same activity date:
- MR document (with technical MR reason )
- MR document (with technical MR reason )
This does not make any sense, since these changes can no longer be processed in billing, which only takes place for specific dates.
Procedure
Regular procedure:
If several technical changes are made on the same date, they must be executed at the same time.
- One meter reading suffices for device removal, changes to the installation structure, register descriptions, device allocation, disconnection and reconnection.
- A pair of meter readings suffice for replacement, device modification and changes to the logical register number.
Exception:
If you are unable to solve the problem as described above, please contact SAP.
Note on Meter Reading Document Numbers:
If a meter reading document has not yet been saved, it is the meter reading that is about to be entered.
History
Last changed on/by | 20050224 | SAP | |
SAP Release Created in | 471 |